Designers' guide to Eurocode 1. EN 1991-1-1 and -1-3 to -1-7 Actions on buildings

The design process of a bridge includes several steps. One of the major steps is the determination of actions & combinations of actions. These actions are imposed loads due to traffic climatic actions, actions due to water or soil subsidence construction loads & accidental actions.

Saved in:
Bibliographic Details
Main Author Gulvanessian, H.
Other Authors Formichi, P., Calgaro, J. A.
Format Electronic eBook
LanguageEnglish
Published London : Thomas Telford, 2009.
SeriesEurocode designers' guide series.
Subjects
Online AccessFull text
ISBN9780727740472
DOI10.1680/dgte1aob.31562
Physical Description1 online resource (xiii, 294 p.) : ill.

Cover