Designers' guide to Eurocode 1. EN 1991-1-1 and -1-3 to -1-7 Actions on buildings
The design process of a bridge includes several steps. One of the major steps is the determination of actions & combinations of actions. These actions are imposed loads due to traffic climatic actions, actions due to water or soil subsidence construction loads & accidental actions.
Saved in:
| Main Author | |
|---|---|
| Other Authors | , |
| Format | Electronic eBook |
| Language | English |
| Published |
London :
Thomas Telford,
2009.
|
| Series | Eurocode designers' guide series.
|
| Subjects | |
| Online Access | Full text |
| ISBN | 9780727740472 |
| DOI | 10.1680/dgte1aob.31562 |
| Physical Description | 1 online resource (xiii, 294 p.) : ill. |