5.5MW급 아지무스 추진기(azimuth thruster)에 대한 대형 캐비테이션 터널 모형시험
The development of an azimuth thruster which has the function of dynamic positioning and propulsion has been greatly required as the demand of vehicles with it increases. To develop or design a reliable azimuth thruster, it is appropriate that the performance and cavitation observation tests should...
Saved in:
Published in | 大韓造船學會 論文集 Vol. 52; no. 1; pp. 34 - 42 |
---|---|
Main Authors | , , , , , , , , , |
Format | Journal Article |
Language | Korean |
Published |
대한조선학회
01.02.2015
|
Subjects | |
Online Access | Get full text |
ISSN | 1225-1143 2287-7355 |
Cover
Summary: | The development of an azimuth thruster which has the function of dynamic positioning and propulsion has been greatly required as the demand of vehicles with it increases. To develop or design a reliable azimuth thruster, it is appropriate that the performance and cavitation observation tests should be conducted in the regime of high Reynolds number. In the present study, to satisfy high Reynolds number condition new dynamometer for a large azimuth thruster is manufactured and arranged in the test section of the Large Cavitation Tunnel (LCT). The test method composed of the open water and the cavitation observation tests is established successfully in LCT, considering the thruster design. |
---|---|
Bibliography: | KISTI1.1003/JNL.JAKO201507158234398 G704-000005.2015.52.1.005 |
ISSN: | 1225-1143 2287-7355 |