Insights gained from test system preparation for the hybrids production for the CMS Phase-2 Outer Tracker

The CMS Phase-2 Outer Tracker requires the manufacturing of 8000 Strip-Strip and 5880 Pixel-Strip silicon modules, altogether incorporating 47 520 hybrid circuits of 18 variants. To ensure complete functionality of the modules it is essential to perform production-scale testing of the hybrids before...

Full description

Saved in:
Bibliographic Details
Published inJournal of instrumentation Vol. 20; no. 2; p. C02035
Main Authors Szydlik, P., Abbas, M., Ahmed, I., Allongue, B., Andreou, D., Blanchot, G., Carnesecchi, R., Klein, K., Kovacs, M., Lapornik, A., La Rosa, A., Lipinski, M., Louis, D., Mohammadi Najafabadi, M., Pauls, A., Sultan, A., Thurn, F., Zografos, A.
Format Journal Article
LanguageEnglish
Published Bristol IOP Publishing 01.02.2025
Subjects
Online AccessGet full text
ISSN1748-0221
DOI10.1088/1748-0221/20/02/C02035

Cover

More Information
Summary:The CMS Phase-2 Outer Tracker requires the manufacturing of 8000 Strip-Strip and 5880 Pixel-Strip silicon modules, altogether incorporating 47 520 hybrid circuits of 18 variants. To ensure complete functionality of the modules it is essential to perform production-scale testing of the hybrids before the module assembly. For that reason, a complex, scalable test system was designed, manufactured, and commissioned. However, the system deployment encountered more difficulties than anticipated which required extensive debugging and creative problem solving. The problems, solutions, and lessons learned from the system deployment are presented.