Staggering Preventive Maintenance Actions at CMP Using a Dispatching Algorithm
In a semiconductor fab, distributing wafers equally across a toolset (set of tools that perform similar operations) helps achieve a higher throughput as opposed to loading them unevenly. However, in some processing steps, level loading tools leads to uniform usage of consumables (material used up at...
        Saved in:
      
    
          | Published in | ASMC proceedings pp. 1 - 6 | 
|---|---|
| Main Authors | , , , , | 
| Format | Conference Proceeding | 
| Language | English | 
| Published | 
            IEEE
    
        01.08.2020
     | 
| Subjects | |
| Online Access | Get full text | 
| ISSN | 2376-6697 | 
| DOI | 10.1109/ASMC49169.2020.9185225 | 
Cover
| Summary: | In a semiconductor fab, distributing wafers equally across a toolset (set of tools that perform similar operations) helps achieve a higher throughput as opposed to loading them unevenly. However, in some processing steps, level loading tools leads to uniform usage of consumables (material used up at a tool in processing wafers) and can trigger simultaneous Preventive Maintenance (PM) actions to replenish them. Managing simultaneous PMs with a small maintenance team reduces tool availability while using a bigger workforce entails higher costs. This study presents ways to overcome this situation by staggering PM actions across tools | 
|---|---|
| ISSN: | 2376-6697 | 
| DOI: | 10.1109/ASMC49169.2020.9185225 |