An optimization model for workgroup-based repetitive scheduling

Most construction repetitive scheduling methods developed so far have been based on the premise that a repetitive project is comprised of many identical production units. Recently, Huang and Sun (2005) developed a workgroup-based repetitive scheduling method that takes the view that a repetitive con...

Full description

Saved in:
Bibliographic Details
Published inCanadian journal of civil engineering Vol. 33; no. 9; pp. 1172 - 1194
Main Authors Huang, Rong-yau, Sun, Kuo-Shun
Format Journal Article
LanguageEnglish
Published Ottawa, Canada NRC Research Press 01.09.2006
National Research Council of Canada
Canadian Science Publishing NRC Research Press
Subjects
Online AccessGet full text
ISSN0315-1468
1208-6029
DOI10.1139/l06-057

Cover

More Information
Summary:Most construction repetitive scheduling methods developed so far have been based on the premise that a repetitive project is comprised of many identical production units. Recently, Huang and Sun (2005) developed a workgroup-based repetitive scheduling method that takes the view that a repetitive construction project consists of repetitive activities of workgroups. Instead of repetitive production units, workgroups with repetitive or similar activities in a repetitive project are identified and employed in the planning and scheduling. The workgroup-based approach adds more flexibility to the planning and scheduling of repetitive construction projects and enhances the effectiveness of repetitive scheduling. This work builds on previous research and develops an optimization model for workgroup-based repetitive scheduling. A genetic algorithm (GA) is employed in model formation for finding the optimal or near-optimal solution. A chromosome representation, as well as specification of other parameters for GA analysis, is described in the paper. Two sample case studies, one simple and one sewer system project, are used for model validation and demonstration. Results and findings are reported.Key words: construction scheduling, repetitive project, workgroup, optimization, genetic algorithm.
Bibliography:SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 14
ObjectType-Article-2
content type line 23
ISSN:0315-1468
1208-6029
DOI:10.1139/l06-057