Scheduling flexible manufacturing cells using Tabu Search
Scheduling is an important aspect in the overall control of a flexible manufacturing system. The research presented focuses on production scheduling of jobs within a flexible manufacturing cell (FMC)-one type of flexible manufacturing system. Due to the complexity of the FMC scheduling problem, a 0-...
Saved in:
| Published in | International journal of production research Vol. 47; no. 24; pp. 6907 - 6928 |
|---|---|
| Main Authors | , |
| Format | Journal Article |
| Language | English |
| Published |
Abingdon
Taylor & Francis Group
15.12.2009
Taylor & Francis Taylor & Francis LLC |
| Subjects | |
| Online Access | Get full text |
| ISSN | 0020-7543 1366-588X |
| DOI | 10.1080/00207540802400628 |
Cover
| Summary: | Scheduling is an important aspect in the overall control of a flexible manufacturing system. The research presented focuses on production scheduling of jobs within a flexible manufacturing cell (FMC)-one type of flexible manufacturing system. Due to the complexity of the FMC scheduling problem, a 0-1 mixed-integer linear programming (MILP) model is formulated for M machines and N jobs with alternative routings. Although small instances of the problem can be solved optimally with MILP models, a two-stage Tabu Search (TS
2
) algorithm that minimises the manufacturing makespan (MS) is proposed to solve medium-to-large-scale problems more efficiently. During Stage I (construction phase), two heuristics are utilised to generate an initial feasible sequence and an initial MS solution. In Stage II (improvement phase), the acquired initial solutions from Stage I are combined with a Tabu Search meta-heuristic procedure that provides improved MS solutions. The TS
2
algorithm provides tremendous savings in computational time for medium/large-sized multi-machine FMC problems. |
|---|---|
| Bibliography: | SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 |
| ISSN: | 0020-7543 1366-588X |
| DOI: | 10.1080/00207540802400628 |