Scheduling flexible manufacturing cells using Tabu Search

Scheduling is an important aspect in the overall control of a flexible manufacturing system. The research presented focuses on production scheduling of jobs within a flexible manufacturing cell (FMC)-one type of flexible manufacturing system. Due to the complexity of the FMC scheduling problem, a 0-...

Full description

Saved in:
Bibliographic Details
Published inInternational journal of production research Vol. 47; no. 24; pp. 6907 - 6928
Main Authors Pitts, R.A., Ventura, J.A.
Format Journal Article
LanguageEnglish
Published Abingdon Taylor & Francis Group 15.12.2009
Taylor & Francis
Taylor & Francis LLC
Subjects
Online AccessGet full text
ISSN0020-7543
1366-588X
DOI10.1080/00207540802400628

Cover

More Information
Summary:Scheduling is an important aspect in the overall control of a flexible manufacturing system. The research presented focuses on production scheduling of jobs within a flexible manufacturing cell (FMC)-one type of flexible manufacturing system. Due to the complexity of the FMC scheduling problem, a 0-1 mixed-integer linear programming (MILP) model is formulated for M machines and N jobs with alternative routings. Although small instances of the problem can be solved optimally with MILP models, a two-stage Tabu Search (TS 2 ) algorithm that minimises the manufacturing makespan (MS) is proposed to solve medium-to-large-scale problems more efficiently. During Stage I (construction phase), two heuristics are utilised to generate an initial feasible sequence and an initial MS solution. In Stage II (improvement phase), the acquired initial solutions from Stage I are combined with a Tabu Search meta-heuristic procedure that provides improved MS solutions. The TS 2 algorithm provides tremendous savings in computational time for medium/large-sized multi-machine FMC problems.
Bibliography:SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 14
ISSN:0020-7543
1366-588X
DOI:10.1080/00207540802400628