APA (7th ed.) Citation

Ohta, H., & Nakatani, T. (2006). A heuristic job-shop scheduling algorithm to minimize the total holding cost of completed and in-process products subject to no tardy jobs. International journal of production economics, 101(1), 19-29. https://doi.org/10.1016/j.ijpe.2005.05.004

Chicago Style (17th ed.) Citation

Ohta, Hiroshi, and Toshihiro Nakatani. "A Heuristic Job-shop Scheduling Algorithm to Minimize the Total Holding Cost of Completed and In-process Products Subject to No Tardy Jobs." International Journal of Production Economics 101, no. 1 (2006): 19-29. https://doi.org/10.1016/j.ijpe.2005.05.004.

MLA (9th ed.) Citation

Ohta, Hiroshi, and Toshihiro Nakatani. "A Heuristic Job-shop Scheduling Algorithm to Minimize the Total Holding Cost of Completed and In-process Products Subject to No Tardy Jobs." International Journal of Production Economics, vol. 101, no. 1, 2006, pp. 19-29, https://doi.org/10.1016/j.ijpe.2005.05.004.

Warning: These citations may not always be 100% accurate.