A heuristic job-shop scheduling algorithm to minimize the total holding cost of completed and in-process products subject to no tardy jobs
Meeting due dates is the most important goal of scheduling if the due date of each job has been promised to its customer. This paper considers the job-shop scheduling problem of minimizing the total holding cost of completed and in-process products subject to no tardy jobs. A heuristic algorithm bas...
Saved in:
Published in | International journal of production economics Vol. 101; no. 1; pp. 19 - 29 |
---|---|
Main Authors | , |
Format | Journal Article |
Language | English |
Published |
Amsterdam
Elsevier B.V
01.05.2006
Elsevier Elsevier Sequoia S.A |
Series | International Journal of Production Economics |
Subjects | |
Online Access | Get full text |
ISSN | 0925-5273 1873-7579 |
DOI | 10.1016/j.ijpe.2005.05.004 |
Cover
Summary: | Meeting due dates is the most important goal of scheduling if the due date of each job has been promised to its customer. This paper considers the job-shop scheduling problem of minimizing the total holding cost of completed and in-process products subject to no tardy jobs. A heuristic algorithm based on the shifting bottleneck procedure is proposed for solving the minimum total holding cost problem subject to no tardy jobs. Several benchmark problems which are commonly used for job-shop scheduling problems of minimizing the makespan are solved by the proposed method and the results are reported. |
---|---|
Bibliography: | SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 |
ISSN: | 0925-5273 1873-7579 |
DOI: | 10.1016/j.ijpe.2005.05.004 |