Bicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobs

•Examine a two-machine flowshop scheduling problem with deteriorating jobs.•Minimize the total completion time subject to minimum makespan.•Propose a mixed integer programming and branch-and-bound algorithm for the problem.•Discuss dominant conditions and several polynomial-time solvable special cas...

Full description

Saved in:
Bibliographic Details
Published inEuropean journal of operational research Vol. 234; no. 3; pp. 650 - 657
Main Authors Cheng, Mingbao, Tadikamalla, Pandu R., Shang, Jennifer, Zhang, Shaqing
Format Journal Article
LanguageEnglish
Published Amsterdam Elsevier B.V 01.05.2014
Elsevier Sequoia S.A
Subjects
Online AccessGet full text
ISSN0377-2217
1872-6860
DOI10.1016/j.ejor.2013.09.033

Cover

More Information
Summary:•Examine a two-machine flowshop scheduling problem with deteriorating jobs.•Minimize the total completion time subject to minimum makespan.•Propose a mixed integer programming and branch-and-bound algorithm for the problem.•Discuss dominant conditions and several polynomial-time solvable special cases.•Examine the effectiveness and efficiency of the proposed algorithms. We study a two-machine flowshop scheduling problem with time-dependent deteriorating jobs, i.e. the processing times of jobs are an increasing function of their starting time. The objective is to minimize the total completion time subject to minimum makespan. We propose a mixed integer programming model, and develop two pairwise interchange algorithms and a branch-and-bound procedure to solve the problem while using several dominance conditions to limit the size of the search tree. Several polynomial-time solvable special cases are discussed. Finally, numerical studies are performed to examine the effectiveness and the efficiency of the proposed algorithms.
Bibliography:SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 14
ObjectType-Article-2
content type line 23
ISSN:0377-2217
1872-6860
DOI:10.1016/j.ejor.2013.09.033