Single-machine scheduling with periodic maintenance to minimize makespan
We consider a single-machine scheduling problem with periodic maintenance activities. Although the scheduling problem with maintenance has attracted researchers’ attention, most of past studies considered only one maintenance period. In this research several maintenance periods are considered where...
        Saved in:
      
    
          | Published in | Computers & operations research Vol. 34; no. 6; pp. 1764 - 1770 | 
|---|---|
| Main Authors | , , | 
| Format | Journal Article | 
| Language | English | 
| Published | 
        Oxford
          Elsevier Ltd
    
        01.06.2007
     Elsevier Science Pergamon Press Inc  | 
| Subjects | |
| Online Access | Get full text | 
| ISSN | 0305-0548 1873-765X 0305-0548  | 
| DOI | 10.1016/j.cor.2005.05.034 | 
Cover
| Summary: | We consider a single-machine scheduling problem with periodic maintenance activities. Although the scheduling problem with maintenance has attracted researchers’ attention, most of past studies considered only one maintenance period. In this research several maintenance periods are considered where each maintenance activity is scheduled after a periodic time interval. The objective is to find a schedule that minimizes the makespan, subject to periodic maintenance and nonresumable jobs. We first prove that the worst-case ratio of the classical
LPT algorithm is 2. Then we show that there is no polynomial time approximation algorithm with a worst-case ratio less than 2 unless
P
=
NP
, which implies that the
LPT algorithm is the best possible. | 
|---|---|
| Bibliography: | SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 SourceType-Scholarly Journals-2 ObjectType-Feature-2 ObjectType-Conference Paper-1 content type line 23 SourceType-Conference Papers & Proceedings-1 ObjectType-Article-3  | 
| ISSN: | 0305-0548 1873-765X 0305-0548  | 
| DOI: | 10.1016/j.cor.2005.05.034 |