Heuristics to optimize total completion time subject to makespan in no-wait flow shops with sequence-dependent setup times

We propose four algorithms for the no-wait flow shop scheduling problem. The objective is minimizing total completion time such that makespan is not greater than a maximum value. We address the problem with sequence-dependent setup times, an important production constraint that has never been consid...

Full description

Saved in:
Bibliographic Details
Published inThe Journal of the Operational Research Society Vol. 74; no. 1; pp. 362 - 373
Main Authors Almeida, Fernando Siqueira de, Nagano, Marcelo Seido
Format Journal Article
LanguageEnglish
Published Taylor & Francis 02.01.2023
Subjects
Online AccessGet full text
ISSN0160-5682
1476-9360
DOI10.1080/01605682.2022.2039569

Cover

More Information
Summary:We propose four algorithms for the no-wait flow shop scheduling problem. The objective is minimizing total completion time such that makespan is not greater than a maximum value. We address the problem with sequence-dependent setup times, an important production constraint that has never been considered for this problem before. The proposed algorithms start from an initial solution and then iterate through a process that destroys and repairs the incumbent solution in order to improve it. The methods are build combining distinct destruction and construction mechanisms, where the search intensification-diversification is explored at different levels. After an initial assessment, the best proposed algorithm (IG 4 ) is chosen to be compared with three literature methods (PAL, TOB, ISA-2) developed for similar problems. Computational experiments revealed that the overall average relative percentage deviation of PAL, TOB, ISA-2, and IG 4 are 10.97%, 4.44%, 2.07%, and 0.36%, respectively. The statistical analysis confirms that IG 4 significantly outperforms the existing methods.