Material flow optimisation of production planning and scheduling problem in flexible manufacturing system by real coded genetic algorithm (RCGA)

In a loading problem of flexible manufacturing system (FMS), part type selection and operations allocation are two critical problems. The total completion time of a product for the selected process plan in the system can be minimum for the loading problem. But, in a real time scheduling system, this...

Full description

Saved in:
Bibliographic Details
Published inFlexible services and manufacturing journal Vol. 31; no. 2; pp. 381 - 423
Main Authors Bhosale, K. C., Pawar, P. J.
Format Journal Article
LanguageEnglish
Published New York Springer US 01.06.2019
Springer Nature B.V
Subjects
Online AccessGet full text
ISSN1936-6582
1936-6590
DOI10.1007/s10696-018-9310-5

Cover

More Information
Summary:In a loading problem of flexible manufacturing system (FMS), part type selection and operations allocation are two critical problems. The total completion time of a product for the selected process plan in the system can be minimum for the loading problem. But, in a real time scheduling system, this process plan may not be optimum because of consideration of waiting time of product and machine. So, the total completion time and thereby the material flow of the selected process plan in the FMS may be high. Due to this problem an integrated approach of part type selection and an operation allocation problem i.e. production planning problem and scheduling problem is considered to optimise material flow in FMS. Loading and scheduling problems are NP-hard in nature. So, to solve complex problems like this, real coded genetic algorithm (RCGA) is used which overcomes some limitations of genetic algorithm. It is observed that, the results of optimisation using RCGA outperforms those obtained by earlier researchers.
Bibliography:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ISSN:1936-6582
1936-6590
DOI:10.1007/s10696-018-9310-5