FLOYD-warshall in Scheduling Open Networks
After introducing main principles of transitive closure of graphs the paper discusses application of a modified Floyd-Warshall algorithm to calculate network time models of projects with no concern on whether the graph has one or more starting and/or ending node(s), whether it includes logical loop(...
Saved in:
| Published in | Procedia engineering Vol. 164; pp. 106 - 114 |
|---|---|
| Main Author | |
| Format | Journal Article |
| Language | English |
| Published |
Elsevier Ltd
2016
|
| Subjects | |
| Online Access | Get full text |
| ISSN | 1877-7058 1877-7058 |
| DOI | 10.1016/j.proeng.2016.11.598 |
Cover
| Summary: | After introducing main principles of transitive closure of graphs the paper discusses application of a modified Floyd-Warshall algorithm to calculate network time models of projects with no concern on whether the graph has one or more starting and/or ending node(s), whether it includes logical loop(s) or not, whether it is a connected model or not, whether it necessitates positive (lower bound) or negative (upper bound) or multiple restrictions amongst the time data of the project elements or not – that is: to schedule open networks. The method may contribute to generalization of network time models especially when considered in multi-project management context. |
|---|---|
| ISSN: | 1877-7058 1877-7058 |
| DOI: | 10.1016/j.proeng.2016.11.598 |