Minimizing total weighted flowtime subject to minimum makespan on two identical parallel machines

We study the problem of scheduling n jobs on two identical parallel processors or machines where an optimal schedule is defined as one with the shortest total weighted flowtime (i.e., the sum of the weighted completion time of all jobs), among the set of schedules with minimum makespan (i.e., the co...

Full description

Saved in:
Bibliographic Details
Published inJournal of intelligent manufacturing Vol. 22; no. 2; pp. 179 - 190
Main Authors Ho, Johnny C., López, Francisco J., Ruiz-Torres, Alex J., (Bill) Tseng, Tzu-Liang
Format Journal Article
LanguageEnglish
Published Boston Springer US 01.04.2011
Springer Nature B.V
Subjects
Online AccessGet full text
ISSN0956-5515
1572-8145
DOI10.1007/s10845-009-0270-1

Cover

More Information
Summary:We study the problem of scheduling n jobs on two identical parallel processors or machines where an optimal schedule is defined as one with the shortest total weighted flowtime (i.e., the sum of the weighted completion time of all jobs), among the set of schedules with minimum makespan (i.e., the completion time of the last job finished). We present a two phase non-linear Integer Programming formulation for its solution, admittedly not to be practical or useful in most cases, but theoretically interesting since it models the problem. Thus, as an alternative, we propose an optimization algorithm, for small problems, and a heuristic, for large problems, to find optimal or near optimal solutions. Furthermore, we perform a computational study to evaluate and compare the effectiveness of the two proposed methods.
Bibliography:SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 14
ISSN:0956-5515
1572-8145
DOI:10.1007/s10845-009-0270-1