Developments of a 2D position sensitive neutron detector
China Spallation Neutron Source (CSNS), one project of the 12th Five-Year-Plan scheme of China, is under construction in Guangdong province. Three neutron spectrometers will he installed during the first phase of the project, and two-dimensional position sensitive thermal neutron detectors are requi...
Saved in:
| Published in | Chinese physics C Vol. 36; no. 6; pp. 525 - 530 |
|---|---|
| Main Author | |
| Format | Journal Article |
| Language | English |
| Published |
01.06.2012
|
| Subjects | |
| Online Access | Get full text |
| ISSN | 1674-1137 0254-3052 |
| DOI | 10.1088/1674-1137/36/6/008 |
Cover
| Summary: | China Spallation Neutron Source (CSNS), one project of the 12th Five-Year-Plan scheme of China, is under construction in Guangdong province. Three neutron spectrometers will he installed during the first phase of the project, and two-dimensional position sensitive thermal neutron detectors are required. Before the construction of the neutron detectors, a prototype of a two-dimensional 200 mm~200 mm Multi-wire Proportional Chamber (MWPC) with Ar/CO2 (90/10) flowing gas has been constructed. In 2009, the prototype was tested with the 55Fe X-ray using part of the electronics, and performed well. Following the test in 2009, the neutron detector was constructed with the complete electronics and filled with the 6 atm. 3He~2.5 atm. C3Hs gas mixture in 2010. The neutron detector has been primarily tested with an Am-Be source. In this paper, new developments of the neutron detector including the design of the high pressure chamber, the optimization of the gas purifying system and the gas filling process will be reported. The results and discussion are also presented in this paper. |
|---|---|
| Bibliography: | China Spallation Neutron Source (CSNS), one project of the 12th Five-Year-Plan scheme of China, is under construction in Guangdong province. Three neutron spectrometers will he installed during the first phase of the project, and two-dimensional position sensitive thermal neutron detectors are required. Before the construction of the neutron detectors, a prototype of a two-dimensional 200 mm~200 mm Multi-wire Proportional Chamber (MWPC) with Ar/CO2 (90/10) flowing gas has been constructed. In 2009, the prototype was tested with the 55Fe X-ray using part of the electronics, and performed well. Following the test in 2009, the neutron detector was constructed with the complete electronics and filled with the 6 atm. 3He~2.5 atm. C3Hs gas mixture in 2010. The neutron detector has been primarily tested with an Am-Be source. In this paper, new developments of the neutron detector including the design of the high pressure chamber, the optimization of the gas purifying system and the gas filling process will be reported. The results and discussion are also presented in this paper. 11-5641/O4 TIAN Li-Chao TANG Bin WANG Xiao-Hu LIU Rong-Guang a ZHANG Jian a CHEN Yuan-Bo SUN Zhi-Jia XU Hong YANG Gui-An ZHANG Qiang 1 State Key Laboratory of Particle Detection and Electronics, Beijing 100049, China 2 Graduate University of Chinese Academy of Sciences, Beijing 100049, China 3 Institute of High Energy Physics, Chinese Academy of Sciences, Beijing 100049, China 4 China University of Petroleum, Beijing 102249, China thermal neutron detector, two dimensional MWPC, Am-Be neutron source ObjectType-Article-2 SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 23 |
| ISSN: | 1674-1137 0254-3052 |
| DOI: | 10.1088/1674-1137/36/6/008 |