Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times
Scheduling multi-project is a complex decision making process. It involves the effective and timely allocation of resources to different projects. In the case of multi-project, resources are often transferred between the projects. It consumes both time and cost, when projects are situated in differe...
Saved in:
| Published in | Asia-Pacific journal of operational research Vol. 32; no. 6; p. 1550048 |
|---|---|
| Main Authors | , , |
| Format | Journal Article |
| Language | English |
| Published |
Singapore
World Scientific Publishing Co. Pte., Ltd
01.12.2015
|
| Subjects | |
| Online Access | Get full text |
| ISSN | 0217-5959 1793-7019 0217-5959 |
| DOI | 10.1142/S0217595915500487 |
Cover
| Summary: | Scheduling multi-project is a complex decision making process. It involves the effective and timely allocation of resources to different projects. In the case of multi-project, resources are often transferred between the projects. It consumes both time and cost, when projects are situated in different geographic locations. As a result, the net present value (NPV) of multi-projects is significantly impacted by the resource transfer time. In this paper, a new genetic algorithm (GA) approach to the multi-project scheduling problem with resource transfer times is presented, where the NPV of all projects is maximized subject to renewable resource constraints. The paper also presents a heuristic approach using two phase priority rules for the same problem. We conduct a comprehensive analysis of 60 two-phase priority rules. The proposed GA approach is compared to the heuristic approach using the well-known priority rules. An extensive computational experiment is reported. |
|---|---|
| Bibliography: | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 |
| ISSN: | 0217-5959 1793-7019 0217-5959 |
| DOI: | 10.1142/S0217595915500487 |