Real-Time Temperature Control for High Arch Dam Based on Decision Support System
It is important and difficult to control the temperature of mass concrete structure during high arch dam construction.A new method with decision support system is presented for temperature control and crack prevention.It is a database system with functions of data storage,information inquiry,data an...
Saved in:
Published in | Transactions of Tianjin University Vol. 20; no. 2; pp. 118 - 125 |
---|---|
Main Author | |
Format | Journal Article |
Language | English |
Published |
Heidelberg
Tianjin University
01.04.2014
|
Subjects | |
Online Access | Get full text |
ISSN | 1006-4982 1995-8196 |
DOI | 10.1007/s12209-014-2210-1 |
Cover
Summary: | It is important and difficult to control the temperature of mass concrete structure during high arch dam construction.A new method with decision support system is presented for temperature control and crack prevention.It is a database system with functions of data storage,information inquiry,data analysis,early warning and resource sharing.Monitoring information during construction can be digitized via this system,and the intelligent analysis and dynamic control of concrete temperature can be conducted.This method has been applied in the construction of the Dagangshan Arch Dam in China and has proven to be very convenient.Based on the decision support of this system and the dynamic adjustment of construction measures,the concrete temperature of this project is well-controlled. |
---|---|
Bibliography: | It is important and difficult to control the temperature of mass concrete structure during high arch dam construction.A new method with decision support system is presented for temperature control and crack prevention.It is a database system with functions of data storage,information inquiry,data analysis,early warning and resource sharing.Monitoring information during construction can be digitized via this system,and the intelligent analysis and dynamic control of concrete temperature can be conducted.This method has been applied in the construction of the Dagangshan Arch Dam in China and has proven to be very convenient.Based on the decision support of this system and the dynamic adjustment of construction measures,the concrete temperature of this project is well-controlled. concrete arch dam; temperature control; decision support system; pipe cooling; monitoring Jing Xiangyang;Liu Xinghong;Zhou Wei;Chang Xiaolin;State Key Laboratory of Water Resource and Hydropower Engineering Science,Wuhan University;School of Civil and Architectural Engineering,Wuhan University 12-1248/T |
ISSN: | 1006-4982 1995-8196 |
DOI: | 10.1007/s12209-014-2210-1 |