Risk Assessment of Contractor Support Based on Improved Risk Matrix Method
For the current situation that the application of risk matrix method may result in too many risk ties which will block risk management and decision making, and based on the brief introduction of risk matrix method,this paper subdivides the risk levels, gives an improved risk matrix method, conducts...
Saved in:
Published in | Shanghai jiao tong da xue xue bao Vol. 20; no. 4; pp. 464 - 467 |
---|---|
Main Author | |
Format | Journal Article |
Language | English |
Published |
Shanghai
Shanghai Jiaotong University Press
01.08.2015
|
Subjects | |
Online Access | Get full text |
ISSN | 1007-1172 1995-8188 |
DOI | 10.1007/s12204-015-1650-7 |
Cover
Summary: | For the current situation that the application of risk matrix method may result in too many risk ties which will block risk management and decision making, and based on the brief introduction of risk matrix method,this paper subdivides the risk levels, gives an improved risk matrix method, conducts risk assessment of contractor support using the improved risk matrix method, and determines the risk rates and the acceptable level. |
---|---|
Bibliography: | 31-1943/U risk matrix; contractor support; risk assessment For the current situation that the application of risk matrix method may result in too many risk ties which will block risk management and decision making, and based on the brief introduction of risk matrix method,this paper subdivides the risk levels, gives an improved risk matrix method, conducts risk assessment of contractor support using the improved risk matrix method, and determines the risk rates and the acceptable level. ZHANG Fu-yuan,LI Dong-yang,GENG Bin,LIU Zhan-ling(Shijiazhuang New Technology Application Institute, Shijiazhuang 050000, China) ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 23 |
ISSN: | 1007-1172 1995-8188 |
DOI: | 10.1007/s12204-015-1650-7 |