|
|
|
|
LEADER |
05955nam a2200361Ii 4500 |
001 |
em-9781838670511 (ebook) |
003 |
UtOrBLW |
005 |
20190515102047.0 |
006 |
m o d |
007 |
cr un||||||||| |
008 |
190515s2019 enk o 100 0 eng d |
020 |
|
|
|a 9781838670511 (ebook)
|
040 |
|
|
|a UtOrBLW
|b eng
|e rda
|c UtOrBLW
|
080 |
|
|
|a 624
|
245 |
0 |
0 |
|a 10th Nordic conference on construction economics and organization /
|c edited by Irene Lill, and Emlyn Witt.
|
246 |
1 |
0 |
|a Tenth Nordic conference on construction economics & organization
|
264 |
|
1 |
|a Bingley, U.K. :
|b Emerald Publishing Limited,
|c 2019.
|
264 |
|
4 |
|c ©2019
|
300 |
|
|
|a 1 online resource (xi, 487 pages).
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
490 |
0 |
|
|a Emerald reach proceedings series,
|x 2516-2853 ;
|v volume 2
|
505 |
0 |
|
|a Prelims -- The economics and business of construction -- Updating and cleaning out: the "make or buy" decision in construction revisited -- Bispevika project: research for constructing a collaborative value chain -- Social considerations in the procurement of road and railroad projects in Sweden -- Standardization and industrialized construction of special purpose building -- Identifying contradictions of integrating life-cycle costing in design practices -- Advancing networking-based business management in construction markets -- Contracts and culture in a partnering project -- Sub-contractors' perception of contracting: the case of crime -- Project managers: gatekeepers or inside men? -- The hybridity of strategic partnerships and construction supply chain management -- Dynamic capabilities and risk management: evaluating the cdrm model for clients -- An opposite design-build procurement method: competing on quality with a fixed price -- Construction and project management -- An appraisal of water infrastructure projects' financing challenges in South Africa -- The soft factors in design management: a hidden success factor? -- Room to manoeuvre: governing the project provisions -- A longitudinal view of adopting project alliancing: case Finland -- A simulation-based optimization for contractors in precast concrete projects -- Governed by municipal land allocations: implications for housing developers -- Situation picture through construction information management -- Who benefit from crime in construction?: a structural analysis -- Quality evaluation of contractor's schedule in the bidding phase -- Activity cruciality as measure of network schedule structure resilience -- Construction programmes and programming: a critical review -- Procurement research: current state and future challenges in the Nordic countries -- Exploitative learning in inter-organizational projects: evidence from dutch infrastructure practices -- The transition from design-bid-build contracts to design-build -- Exploring the dynamics of supplier innovation diffusion -- Understanding collaborative working in a facilitated interdisciplinary environment -- Ensuring successful knowledge transfer in building renovation projects -- Public private collaboration in the context of zero emission neighbourhood -- Strategizing and project management in construction projects: an exploratory literature review -- Building information, data and digitalization -- BIM-enabled education: A systematic literature review -- A BIM-enabled learning environment: a conceptual framework -- "I work all day with automation in construction: I am a sociomaterial-designer" -- Developing smart services to smart campus -- An overview of BIM adoption in the construction industry: benefits and barriers -- BIM for construction education: initial findings from a literature review -- Model for smart, self-learning and adaptive resilience building -- Investigating the drop-out rate from a BIM course -- Innovations in the construction process -- Senior residence concepts in Norway: challenges and actions for a sustainable development -- 3D-printing technology in construction: results from a survey -- Product and manufacturing systems alignment: a case study in the timber house building industry -- Opening the black box of accessibility regulation -- Orchestrating multi-actor collaborative innovation across organizational boundaries -- Sustainability and resource efficiency -- Social sustainability in modelling of value creation in housing refurbishment -- Reviewing the role of sustainability professionals in construction -- Exploring the evolution and impact of building environment assessment methods in achieving green building -- Stakeholders of construction and real estate -- Challenging the rhetoric of construction briefing: insights from a formula 1 sports venue -- Underlying causes for risk taking behaviour among construction workers -- Towards developing a framework for user-driven innovation in refurbishment -- Reconstructing knowledge integration in the Norwegian AEC-industry -- Institutional complexity for Chinese international contractors -- Built environments -- BIM related innovation in healthcare precinct design and facilities management -- Location is crucial in retrofit: strategy selection in different regions -- Construction education and research -- From theoretical to practical competence on health and safety -- A test platform of viable methods to improve production and learning on construction sites.
|
650 |
|
0 |
|a Construction industry
|x Economic aspects
|v Congresses.
|
650 |
|
0 |
|a Construction industry
|x Management
|v Congresses.
|
650 |
|
7 |
|a Business & Economics
|x Development
|x Economic Development.
|2 bisacsh
|
650 |
|
7 |
|a Construction industry.
|2 bicssc
|
655 |
|
7 |
|a elektronické knihy
|7 fd186907
|2 czenas
|
655 |
|
9 |
|a electronic books
|2 eczenas
|
700 |
1 |
|
|a Lill, Irene,
|e editor.
|
700 |
1 |
|
|a Witt, Emlyn,
|e editor.
|
856 |
4 |
0 |
|u https://proxy.k.utb.cz/login?url=https://doi.org/10.1108/S2516-2853201902
|y Full text
|