A new heuristic method for solving two machine flow shop with job block, transportation time and final assemble on a single machine without job block
Processing jobs in different location with minimum completion time and customer’s satisfaction is a big task for a production and planning engineers in an industry. In this paper, we propose a new heuristic method for solving flow shop machine with permutation and single machine situated at differen...
Saved in:
| Published in | AIP conference proceedings Vol. 2850; no. 1 |
|---|---|
| Main Authors | , , |
| Format | Journal Article Conference Proceeding |
| Language | English |
| Published |
Melville
American Institute of Physics
17.05.2024
|
| Subjects | |
| Online Access | Get full text |
| ISSN | 0094-243X 1935-0465 1551-7616 1551-7616 |
| DOI | 10.1063/5.0208279 |
Cover
| Summary: | Processing jobs in different location with minimum completion time and customer’s satisfaction is a big task for a production and planning engineers in an industry. In this paper, we propose a new heuristic method for solving flow shop machine with permutation and single machine situated at different locations. To obtain an optimal sequence, we consider a equivalent job for job block on giving a set of jobs processed on first two machines with transportation time by using Johnson’s algorithm. To assemble these jobs, we introduce single machine with due date and obtain minimum makespan by using heuristic methods. Numerical examples are given. |
|---|---|
| Bibliography: | ObjectType-Conference Proceeding-1 SourceType-Conference Papers & Proceedings-1 content type line 21 |
| ISSN: | 0094-243X 1935-0465 1551-7616 1551-7616 |
| DOI: | 10.1063/5.0208279 |