An industrial application of resource constrained scheduling for quick changeover

This paper describes the improvement of the quick changeover process of a painting line in a wooden frames factory. The well-known SMED technique (single minute exchange of die) was applied. However the characteristics of the setup operations (those characteristics also occur in other industrial cha...

Full description

Saved in:
Bibliographic Details
Published in2009 IEEE International Conference on Industrial Engineering and Engineering Management pp. 189 - 193
Main Authors Sousa, R.M., Lima, R.M., Carvalho, J.D., Alves, A.C.
Format Conference Proceeding
LanguageEnglish
Published IEEE 01.12.2009
Subjects
Online AccessGet full text
ISBN1424448697
9781424448692
ISSN2157-3611
DOI10.1109/IEEM.2009.5373391

Cover

More Information
Summary:This paper describes the improvement of the quick changeover process of a painting line in a wooden frames factory. The well-known SMED technique (single minute exchange of die) was applied. However the characteristics of the setup operations (those characteristics also occur in other industrial changeover scenarios) have revealed the possibility of advantageous utilization of resource constrained project scheduling methods. The application of one of these methods represents an innovative contribution to the quick changeover area, allowing (when applicable) the scheduling of the involved setup operations, considering their duration, precedence relations and resources' need, in order to achieve a reduced setup time.
ISBN:1424448697
9781424448692
ISSN:2157-3611
DOI:10.1109/IEEM.2009.5373391