APA (7th ed.) Citation

Hwang, F., Kovalyov, M., & Lin, B. (2014). Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence. Annals of operations research, 217(1), 263. https://doi.org/10.1007/sl0479-014-1531-8

Chicago Style (17th ed.) Citation

Hwang, F.J, M.Y Kovalyov, and B.M.T Lin. "Scheduling for Fabrication and Assembly in a Two-machine Flowshop with a Fixed Job Sequence." Annals of Operations Research 217, no. 1 (2014): 263. https://doi.org/10.1007/sl0479-014-1531-8.

MLA (9th ed.) Citation

Hwang, F.J, et al. "Scheduling for Fabrication and Assembly in a Two-machine Flowshop with a Fixed Job Sequence." Annals of Operations Research, vol. 217, no. 1, 2014, p. 263, https://doi.org/10.1007/sl0479-014-1531-8.

Warning: These citations may not always be 100% accurate.