Reconfiguring Distribution Grids
Optimizing the grid structure becomes necessary in case of post-emergency power restoration or when overloaded. In normal operation, distribution grid parameters are adjusted to reduce the overload and the electricity losses; reconfiguration is not considered. The grid topology is reconfigurable by...
Saved in:
| Published in | Bulletin of the South Ural State University series "Power Engineering" Vol. 21; no. 1; pp. 38 - 47 |
|---|---|
| Format | Journal Article |
| Language | English |
| Published |
01.03.2021
|
| Online Access | Get full text |
| ISSN | 1990-8512 2409-1057 2409-1057 |
| DOI | 10.14529/power210104 |
Cover
| Abstract | Optimizing the grid structure becomes necessary in case of post-emergency power restoration or when overloaded. In normal operation, distribution grid parameters are adjusted to reduce the overload and the electricity losses; reconfiguration is not considered. The grid topology is reconfigurable by solving the optimization problem by the branch-and-bound algorithm subject to keeping the parameters within their acceptable limits in the context of line resistance, electricity losses, and power flows for all possible grid layouts. Simulation of a 10-kV distribution grid with four power centers shows that reconfiguring reduces power consumption by 2.9% and the inline active power losses by 256 kW. In this case study, reconfiguring has helped keep the voltage within the acceptable range while not overloading the lines. This study shows the proposed approach is suitable for dynamic grid reconfiguration as a way to reduce the overload and the electricity losses; at the same time, the approach does not require calculating nonlinear steady-state equations for each possible grid topology. |
|---|---|
| AbstractList | Optimizing the grid structure becomes necessary in case of post-emergency power restoration or when overloaded. In normal operation, distribution grid parameters are adjusted to reduce the overload and the electricity losses; reconfiguration is not considered. The grid topology is reconfigurable by solving the optimization problem by the branch-and-bound algorithm subject to keeping the parameters within their acceptable limits in the context of line resistance, electricity losses, and power flows for all possible grid layouts. Simulation of a 10-kV distribution grid with four power centers shows that reconfiguring reduces power consumption by 2.9% and the inline active power losses by 256 kW. In this case study, reconfiguring has helped keep the voltage within the acceptable range while not overloading the lines. This study shows the proposed approach is suitable for dynamic grid reconfiguration as a way to reduce the overload and the electricity losses; at the same time, the approach does not require calculating nonlinear steady-state equations for each possible grid topology. |
| BookMark | eNp9j81KAzEURoNUcKzd-QDzAEbvzc8ks5SqVSgI0v2QZJISGDMl6VD69hbrwlVXH3wcDpxbMktj8oTcIzyikKx92o0HnxkCgrgiFRPQUgSpZqTCtgWqJbIbsiglWpCNbhi0vCL1l3djCnE75Zi29Uss-xzttI9jqlc59uWOXAczFL_42znZvL1ulu90_bn6WD6vqVNSUG1VwwQGzZ2yDJlWXEgnneGMQ-B9r9BaDafbWOM0OIWNsn1oVHDO94HPCT1rp7Qzx4MZhm6X47fJxw6h-w3s_gWe-Icz7_JYSvbhMv4DxtpURQ |
| ContentType | Journal Article |
| DBID | AAYXX CITATION ADTOC UNPAY |
| DOI | 10.14529/power210104 |
| DatabaseName | CrossRef Unpaywall for CDI: Periodical Content Unpaywall |
| DatabaseTitle | CrossRef |
| DatabaseTitleList | CrossRef |
| Database_xml | – sequence: 1 dbid: UNPAY name: Unpaywall url: https://proxy.k.utb.cz/login?url=https://unpaywall.org/ sourceTypes: Open Access Repository |
| DeliveryMethod | fulltext_linktorsrc |
| EISSN | 2409-1057 |
| EndPage | 47 |
| ExternalDocumentID | 10.14529/power210104 10_14529_power210104 |
| GroupedDBID | AAYXX ALMA_UNASSIGNED_HOLDINGS CITATION GROUPED_DOAJ ADTOC UNPAY |
| ID | FETCH-LOGICAL-c754-8b76241f83c7b21287345c5ca3230f3dd71bb80873abac80c7167bdf67fccedf3 |
| IEDL.DBID | UNPAY |
| ISSN | 1990-8512 2409-1057 |
| IngestDate | Tue Aug 19 21:12:02 EDT 2025 Tue Jul 01 04:18:37 EDT 2025 |
| IsDoiOpenAccess | true |
| IsOpenAccess | true |
| IsPeerReviewed | true |
| IsScholarly | true |
| Issue | 1 |
| Language | English |
| License | cc-by |
| LinkModel | DirectLink |
| MergedId | FETCHMERGED-LOGICAL-c754-8b76241f83c7b21287345c5ca3230f3dd71bb80873abac80c7167bdf67fccedf3 |
| OpenAccessLink | https://proxy.k.utb.cz/login?url=https://doi.org/10.14529/power210104 |
| PageCount | 10 |
| ParticipantIDs | unpaywall_primary_10_14529_power210104 crossref_primary_10_14529_power210104 |
| ProviderPackageCode | CITATION AAYXX |
| PublicationCentury | 2000 |
| PublicationDate | 2021-03-00 |
| PublicationDateYYYYMMDD | 2021-03-01 |
| PublicationDate_xml | – month: 03 year: 2021 text: 2021-03-00 |
| PublicationDecade | 2020 |
| PublicationTitle | Bulletin of the South Ural State University series "Power Engineering" |
| PublicationYear | 2021 |
| SSID | ssib056862093 ssib036266245 ssib050739858 ssib015893709 |
| Score | 2.0606534 |
| Snippet | Optimizing the grid structure becomes necessary in case of post-emergency power restoration or when overloaded. In normal operation, distribution grid... |
| SourceID | unpaywall crossref |
| SourceType | Open Access Repository Index Database |
| StartPage | 38 |
| Title | Reconfiguring Distribution Grids |
| URI | https://doi.org/10.14529/power210104 |
| UnpaywallVersion | publishedVersion |
| Volume | 21 |
| hasFullText | 1 |
| inHoldings | 1 |
| isFullTextHit | |
| isPrint | |
| journalDatabaseRights | – providerCode: PRVAON databaseName: DOAJ Directory of Open Access Journals customDbUrl: eissn: 2409-1057 dateEnd: 99991231 omitProxy: true ssIdentifier: ssib056862093 issn: 1990-8512 databaseCode: DOA dateStart: 20120101 isFulltext: true titleUrlDefault: https://www.doaj.org/ providerName: Directory of Open Access Journals – providerCode: PRVHPJ databaseName: ROAD: Directory of Open Access Scholarly Resources customDbUrl: eissn: 2409-1057 dateEnd: 99991231 omitProxy: true ssIdentifier: ssib050739858 issn: 1990-8512 databaseCode: M~E dateStart: 20120101 isFulltext: true titleUrlDefault: https://road.issn.org providerName: ISSN International Centre |
| link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwjV1JSwMxFH6U9uDJBRUrWuZQvaW2k2SSORZtLR6KhxbqqWSZSLGMpXYQ_fW-zCK1BxVyCglkI9_7-N4C0FYKcTlShsQmdoSFTBHFaJcklMfU8sRh894W42g0ZQ8zPqtBu4qF2dbvvSZ4s_LFwpCX9HzSz0bE0eKuQ2M6fuw_5YKxj4TmuaiJ2BQTX7a29G_fnf4DefaydKU-3tVyuQUnwwMYVAspvEheOtlGd8znTo7Gv1Z6CPulPRn0iwdwBLUkPYbAk8rULZ7zGMTgzifHLetaBffrhX07gclwMLkdkbIUAjGCMyI1_lms5yQ1QiPYSEEZN9woigzCUWtFT2vZxW6llZFdgyxIaOsi4YxJrKOnUE9f0-QMAhpqEYaxlZFXd_G7c7FUaCMwaZiykjXhqjql-apIeDH3RMFvcb61xSZcfx_hrwPP_zvwAuqbdZZcIshvdCsnx63ypr8AexClOA |
| linkProvider | Unpaywall |
| linkToUnpaywall | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwjV3LSgMxFL2UduHKBypWVGZR3aW2k2SSWRZtLS6KixbqquQxkWIZh3YG0a_3ZjqV2oUKWYUE8iLnHs59ALSUQlyOlCGxiR1hIVNEMdohCeUxtTxx2Ly3xSgaTtjjlE9r0NrEwmzr914TvM18sTDkJV2f9LMRcbS469CYjJ56z6Vg7COheSlqIjbFxJetrfzbd6f_QJ69Is3Ux7taLLbgZHAA_c1C1l4kr-0i123zuZOj8a-VHsJ-ZU8GvfUDOIJakh5D4Ell6uYvZQxicO-T41Z1rYKH5dyuTmA86I_vhqQqhUCM4IxIjX8W6zpJjdAINlJQxg03iiKDcNRa0dVadrBbaWVkxyALEtq6SDhjEuvoKdTTtzQ5g4CGWoRhbGXk1V387lwsFdoITBqmrGRNuN6c0ixbJ7yYeaLgtzjb2mITbr6P8NeB5_8deAH1fFkklwjyub6q7vgLoU-kQw |
| openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Reconfiguring+Distribution+Grids&rft.jtitle=Bulletin+of+the+South+Ural+State+University+series+%22Power+Engineering%22&rft.date=2021-03-01&rft.issn=1990-8512&rft.eissn=2409-1057&rft.volume=21&rft.issue=1&rft.spage=38&rft.epage=47&rft_id=info:doi/10.14529%2Fpower210104&rft.externalDBID=n%2Fa&rft.externalDocID=10_14529_power210104 |
| thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1990-8512&client=summon |
| thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1990-8512&client=summon |
| thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1990-8512&client=summon |