A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams

Cutoff grade specifies the available supply of metallic ore from an open pit mine to the multiple processing streams of an open pit mining complex. An optimal cutoff grade strategy maximizes the net present value (NPV) of an open pit mining operation subject to the mining, processing, and marketing/...

Full description

Saved in:
Bibliographic Details
Published inResources policy Vol. 38; no. 4; pp. 591 - 597
Main Authors Asad, Mohammad Waqar Ali, Dimitrakopoulos, Roussos
Format Journal Article
LanguageEnglish
Published Elsevier Ltd 01.12.2013
Subjects
Online AccessGet full text
ISSN0301-4207
1873-7641
DOI10.1016/j.resourpol.2013.09.008

Cover

Abstract Cutoff grade specifies the available supply of metallic ore from an open pit mine to the multiple processing streams of an open pit mining complex. An optimal cutoff grade strategy maximizes the net present value (NPV) of an open pit mining operation subject to the mining, processing, and marketing/refining capacity constraints. Even though, the quantities of material flowing from the mine to the market are influenced by the expected variation in the available metal content or inherent uncertainty in the supply of ore, the majority of cutoff grade optimization models not only disregard this aspect and may lead to unrealistic cash flows, but also they are limited in application to an open pit mining operation with single processing facility. The model proposed herein determines the optimal cutoff grade policy based on a stochastic framework that accounts for uncertainty in supply of ore to the multiple ore processing streams. An application on a large-scale open pit mining operation develops a unique cutoff grade policy along with a portfolio of mining, processing, and marketing/refining rates. Owing to the geological uncertainty, the approach addresses risk by showing a difference of 14% between the minimum and maximum production rates, cash flows and NPV. •Cutoff grade optimization model for an open pit mining complex considering geological uncertainty and multiple processing streams.•The model maximizes net present value and satisfies mine, processes, and market/refinery capacity constraints.•The model develops a unique cutoff grade policy under uncertain ore supply considering multiple simulated realizations of grade–tonnage curves.•The optimal cutoff grade policy is risk quantified for metal production rates and cash flows for life of operation.•A realistic application proves that low-grade and highly variable mineral resources are subject to higher risk under geological uncertainty.
AbstractList Cutoff grade specifies the available supply of metallic ore from an open pit mine to the multiple processing streams of an open pit mining complex. An optimal cutoff grade strategy maximizes the net present value (NPV) of an open pit mining operation subject to the mining, processing, and marketing/refining capacity constraints. Even though, the quantities of material flowing from the mine to the market are influenced by the expected variation in the available metal content or inherent uncertainty in the supply of ore, the majority of cutoff grade optimization models not only disregard this aspect and may lead to unrealistic cash flows, but also they are limited in application to an open pit mining operation with single processing facility. The model proposed herein determines the optimal cutoff grade policy based on a stochastic framework that accounts for uncertainty in supply of ore to the multiple ore processing streams. An application on a large-scale open pit mining operation develops a unique cutoff grade policy along with a portfolio of mining, processing, and marketing/refining rates. Owing to the geological uncertainty, the approach addresses risk by showing a difference of 14% between the minimum and maximum production rates, cash flows and NPV.
Cutoff grade specifies the available supply of metallic ore from an open pit mine to the multiple processing streams of an open pit mining complex. An optimal cutoff grade strategy maximizes the net present value (NPV) of an open pit mining operation subject to the mining, processing, and marketing/refining capacity constraints. Even though, the quantities of material flowing from the mine to the market are influenced by the expected variation in the available metal content or inherent uncertainty in the supply of ore, the majority of cutoff grade optimization models not only disregard this aspect and may lead to unrealistic cash flows, but also they are limited in application to an open pit mining operation with single processing facility. The model proposed herein determines the optimal cutoff grade policy based on a stochastic framework that accounts for uncertainty in supply of ore to the multiple ore processing streams. An application on a large-scale open pit mining operation develops a unique cutoff grade policy along with a portfolio of mining, processing, and marketing/refining rates. Owing to the geological uncertainty, the approach addresses risk by showing a difference of 14% between the minimum and maximum production rates, cash flows and NPV. All rights reserved, Elsevier
Cutoff grade specifies the available supply of metallic ore from an open pit mine to the multiple processing streams of an open pit mining complex. An optimal cutoff grade strategy maximizes the net present value (NPV) of an open pit mining operation subject to the mining, processing, and marketing/refining capacity constraints. Even though, the quantities of material flowing from the mine to the market are influenced by the expected variation in the available metal content or inherent uncertainty in the supply of ore, the majority of cutoff grade optimization models not only disregard this aspect and may lead to unrealistic cash flows, but also they are limited in application to an open pit mining operation with single processing facility. The model proposed herein determines the optimal cutoff grade policy based on a stochastic framework that accounts for uncertainty in supply of ore to the multiple ore processing streams. An application on a large-scale open pit mining operation develops a unique cutoff grade policy along with a portfolio of mining, processing, and marketing/refining rates. Owing to the geological uncertainty, the approach addresses risk by showing a difference of 14% between the minimum and maximum production rates, cash flows and NPV. •Cutoff grade optimization model for an open pit mining complex considering geological uncertainty and multiple processing streams.•The model maximizes net present value and satisfies mine, processes, and market/refinery capacity constraints.•The model develops a unique cutoff grade policy under uncertain ore supply considering multiple simulated realizations of grade–tonnage curves.•The optimal cutoff grade policy is risk quantified for metal production rates and cash flows for life of operation.•A realistic application proves that low-grade and highly variable mineral resources are subject to higher risk under geological uncertainty.
Author Dimitrakopoulos, Roussos
Asad, Mohammad Waqar Ali
Author_xml – sequence: 1
  givenname: Mohammad Waqar Ali
  surname: Asad
  fullname: Asad, Mohammad Waqar Ali
  email: waqar.asad@curtin.edu.au, mwaasad@gmail.com
  organization: Department of Mining Engineering, Western Australian School of Mines, Faculty of Science and Engineering, Curtin University, Australia
– sequence: 2
  givenname: Roussos
  surname: Dimitrakopoulos
  fullname: Dimitrakopoulos, Roussos
  email: roussos.dimitrakopoulos@mcgill.ca
  organization: COSMO Stochastic Mine Planning Laboratory, Department of Mining and Materials Engineering, McGill University, Canada
BookMark eNqNkjtv3DAQhIXAAXJ28hvCMo2U5VsqUhyMvAADbpKaoHgrHw-SqJBUXv7z4fmCFGnuqgUG3wx2sXNdXc1hxqp6TaGhQNXbQxMxhTUuYWwYUN5A1wC0z6oNbTWvtRL0qtoAB1oLBvpFdZ3SAQCkbtWmetySPa7Rp-wdscsSg3V7kgNJObi9fZLdmsMwkIdod0jCkv3kf9vsw0yGEIuAM1l8JpOf_fxAXJiWEX9iIj983pNpHbMvAinRDlM6IilHtFN6WT0f7Jjw1d95U3398P7L7af67v7j59vtXe0k5blmPbPoQKDonOqUVD1DptoeWiV6qa1UrWqxnMltr3dKQN8NQjMUheo62_Kb6s0pt6zwbcWUzeSTw3G0M4Y1Gaoll7T4L0F5QQvJzqNSAGOCaXEByoSAVpY9zqO0k8AFP6a-O6EuhpQiDsb5_PSXHK0fDQVzLIg5mH8FMceCGOhMKUjx6__8S_STjb8ucG5PTixf--4xmuQ8zg53PqLLZhf82Yw_9Ezeaw
CitedBy_id crossref_primary_10_1016_j_ejor_2016_08_071
crossref_primary_10_1016_j_resourpol_2017_11_016
crossref_primary_10_1007_s12517_014_1646_x
crossref_primary_10_1016_j_resourpol_2020_101604
crossref_primary_10_1016_j_resourpol_2015_06_004
crossref_primary_10_1080_17480930_2019_1688954
crossref_primary_10_1016_j_resourpol_2018_12_003
crossref_primary_10_1080_25726668_2019_1626169
crossref_primary_10_1007_s42461_024_00982_8
crossref_primary_10_1016_j_resourpol_2021_102076
crossref_primary_10_1016_j_resourpol_2018_12_001
crossref_primary_10_1016_j_resourpol_2023_103543
crossref_primary_10_1007_s13563_021_00297_w
crossref_primary_10_1016_j_resourpol_2018_11_004
crossref_primary_10_1016_j_resourpol_2020_101875
crossref_primary_10_1016_j_resourpol_2020_101634
crossref_primary_10_31474_2073_9575_2024_1_31__2_32__39_48
crossref_primary_10_1007_s11771_018_3841_5
crossref_primary_10_1134_S1062739116041142
crossref_primary_10_1016_j_resourpol_2016_08_003
crossref_primary_10_1016_j_resourpol_2024_104949
crossref_primary_10_1080_17480930_2025_2455567
crossref_primary_10_1080_17480930_2025_2450356
crossref_primary_10_1080_17480930_2023_2281201
crossref_primary_10_1007_s12517_020_5104_7
crossref_primary_10_1016_j_resourpol_2016_10_003
crossref_primary_10_1016_j_resourpol_2021_102086
crossref_primary_10_1007_s11771_014_2250_7
crossref_primary_10_1016_j_cor_2019_104823
crossref_primary_10_1007_s11053_019_09551_z
crossref_primary_10_1007_s11771_016_3126_9
crossref_primary_10_1016_j_resourpol_2020_101594
crossref_primary_10_1287_inte_2017_0934
crossref_primary_10_1179_1743286314Y_0000000062
crossref_primary_10_1016_j_orl_2022_01_008
crossref_primary_10_1016_j_resourpol_2016_05_005
Cites_doi 10.1057/jors.2012.26
10.1076/ijsm.18.1.60.23543
10.1134/S1062739147020110
10.1016/j.eswa.2008.09.018
10.1007/s11004-010-9265-x
10.1016/j.resourpol.2007.06.003
10.1134/S1062739147020055
10.1007/s10913-006-0052-5
10.1016/j.resourpol.2011.12.002
10.1108/02644400710817961
10.1007/s11004-012-9402-9
10.1134/S1062739147020109
10.1016/j.resourpol.2008.06.001
10.1080/13895260500258661
10.1007/s11004-012-9428-z
ContentType Journal Article
Copyright 2013 Elsevier Ltd
Copyright_xml – notice: 2013 Elsevier Ltd
DBID AAYXX
CITATION
8BJ
FQK
JBE
7ST
7U1
C1K
SOI
7S9
L.6
7SU
7TA
8FD
FR3
JG9
DOI 10.1016/j.resourpol.2013.09.008
DatabaseName CrossRef
International Bibliography of the Social Sciences (IBSS)
International Bibliography of the Social Sciences
International Bibliography of the Social Sciences
Environment Abstracts
Risk Abstracts
Environmental Sciences and Pollution Management
Environment Abstracts
AGRICOLA
AGRICOLA - Academic
Environmental Engineering Abstracts
Materials Business File
Technology Research Database
Engineering Research Database
Materials Research Database
DatabaseTitle CrossRef
International Bibliography of the Social Sciences (IBSS)
Risk Abstracts
Environment Abstracts
Environmental Sciences and Pollution Management
AGRICOLA
AGRICOLA - Academic
Materials Research Database
Engineering Research Database
Technology Research Database
Materials Business File
Environmental Engineering Abstracts
DatabaseTitleList Risk Abstracts
International Bibliography of the Social Sciences (IBSS)

Materials Research Database
AGRICOLA
Risk Abstracts
DeliveryMethod fulltext_linktorsrc
Discipline Engineering
Environmental Sciences
EISSN 1873-7641
EndPage 597
ExternalDocumentID 10_1016_j_resourpol_2013_09_008
S0301420713000792
GroupedDBID --K
--M
-DZ
-~X
.~1
0R~
123
1B1
1RT
1~.
1~5
29P
3R3
4.4
457
4G.
5VS
7-5
71M
8P~
9JM
9JN
9JO
AACTN
AAEDT
AAEDW
AAFFL
AAFJI
AAHCO
AAIAV
AAIKJ
AAKOC
AALRI
AAOAW
AAPFB
AAQFI
AAQXK
AARJD
AAXUO
ABFRF
ABFYP
ABJNI
ABLST
ABMAC
ABMMH
ABQEM
ABQYD
ABXDB
ABYKQ
ACDAQ
ACGFO
ACGFS
ACHQT
ACIWK
ACLVX
ACRLP
ACROA
ACSBN
ADBBV
ADEZE
ADFHU
ADMUD
AEBSH
AEFWE
AEKER
AEYQN
AFKWA
AFODL
AFTJW
AFXIZ
AGHFR
AGTHC
AGUBO
AGYEJ
AHEUO
AHHHB
AHIDL
AIEXJ
AIIAU
AIKHN
AITUG
AJBFU
AJOXV
AJWLA
AKIFW
AKYCK
ALMA_UNASSIGNED_HOLDINGS
AMFUW
AMRAJ
AOMHK
ASPBG
ATOGT
AVARZ
AVWKF
AXJTR
AXLSJ
AZFZN
BEHZQ
BELTK
BEZPJ
BGSCR
BKOJK
BLECG
BLXMC
BNTGB
BPUDD
BULVW
CS3
DU5
EBS
EFJIC
EFLBG
EJD
EO8
EO9
EP2
EP3
FDB
FEDTE
FGOYB
FIRID
FNPLU
FYGXN
G-2
G-Q
GBLVA
HMB
HMY
HVGLF
HZ~
IHE
IMUCA
IXIXF
J1W
JARJE
KCYFY
KOM
LY5
LY6
M3Y
M41
MO0
MS~
N9A
O-L
O9-
OAUVE
OZT
P-8
P-9
P2P
PC.
PRBVW
Q38
R2-
RIG
ROL
RPZ
SAC
SDF
SDG
SEB
SEE
SES
SEW
SPC
SPCBC
SSB
SSE
SSF
SSJ
SSO
SSR
SSS
SSZ
T5K
UHS
UNMZH
WH7
WUQ
YK3
~02
~G-
AATTM
AAXKI
AAYWO
AAYXX
ABWVN
ACLOT
ACRPL
ACVFH
ADCNI
ADNMO
ADVLN
AEIPS
AEUPX
AFJKZ
AFPUW
AGQPQ
AIGII
AIIUN
AKBMS
AKRWK
AKYEP
ANKPU
APXCP
CITATION
EFKBS
~HD
8BJ
FQK
JBE
7ST
7U1
C1K
SOI
7S9
L.6
7SU
7TA
8FD
FR3
JG9
ID FETCH-LOGICAL-c513t-2b2aec04e49c69656b2e268b0864b57a56868e6413ab7d640b9f472e4e2699a83
IEDL.DBID .~1
ISSN 0301-4207
IngestDate Tue Oct 07 09:56:15 EDT 2025
Mon Sep 29 03:25:14 EDT 2025
Tue Oct 07 09:25:03 EDT 2025
Tue Oct 07 09:31:43 EDT 2025
Sun Sep 28 12:08:36 EDT 2025
Thu Oct 09 00:32:40 EDT 2025
Thu Apr 24 22:52:41 EDT 2025
Fri Feb 23 02:21:02 EST 2024
IsPeerReviewed true
IsScholarly true
Issue 4
Keywords Q
Cutoff grade
Open pit mine planning
Heuristic algorithms
Stochastic optimization
Language English
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c513t-2b2aec04e49c69656b2e268b0864b57a56868e6413ab7d640b9f472e4e2699a83
Notes ObjectType-Article-2
SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 23
ObjectType-Article-1
ObjectType-Feature-2
PQID 1519503434
PQPubID 23462
PageCount 7
ParticipantIDs proquest_miscellaneous_1753514138
proquest_miscellaneous_1733511382
proquest_miscellaneous_1540224274
proquest_miscellaneous_1524408575
proquest_miscellaneous_1519503434
crossref_citationtrail_10_1016_j_resourpol_2013_09_008
crossref_primary_10_1016_j_resourpol_2013_09_008
elsevier_sciencedirect_doi_10_1016_j_resourpol_2013_09_008
PublicationCentury 2000
PublicationDate 2013-12-01
PublicationDateYYYYMMDD 2013-12-01
PublicationDate_xml – month: 12
  year: 2013
  text: 2013-12-01
  day: 01
PublicationDecade 2010
PublicationTitle Resources policy
PublicationYear 2013
Publisher Elsevier Ltd
Publisher_xml – name: Elsevier Ltd
References Asad (bib1) 2002; 21
Dagdelen, K., 1992. Cutoff grade optimization. In: Proceedings of the 23rd International Symposium on Application of Computers and Operations Research in Minerals Industry, pp. 157–165.
Asad, Dimitrakopoulos (bib4) 2012; 37
Horta, Amilcar (bib20) 2010; 42
Asad (bib3) 2007; 24
Taylor (bib30) 1972
Rendu, M., 2008. An Introduction to Cutoff Grade Estimation. Society of Mining, Metallurgy, and Exploration, Inc. (SME), United States.
Hustrulid, Kuchta (bib21) 2006
Asad, M.W.A., Dimitrakopoulos, R., 2013. Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand. Journal of the Operational Research Society, 64 (2), 185–197
Godoy, Dimitrakopoulos (bib17) 2011; 47
Goovaerts (bib18) 1997
Boucher, Dimitrakopoulos (bib10) 2012; 44
Dimitrakopoulos, Abdel Sabour (bib15) 2007; 32
Lane, K.F., 1988. The Economic Definition of Ore, Cutoff Grade in Theory and Practice. Mining Journal Books, London.
Asad, Topal (bib6) 2011; 111
Lane (bib24) 1964; 59
King, B., 2001. Optimal Mine Scheduling Policies (Ph.D. thesis). Royal School of Mines, Imperial College, London University, UK.
Machuca-Mory, Deutsch (bib26) 2013; 45
Osanloo, Rashidinejad, Rezai (bib27) 2008; 33
Vallee (bib31) 2000; 93
Bascetin, Nieto (bib9) 2007; 107
Asad (bib2) 2005; 19
.
Dagdelen, K., 1993. An NPV optimization algorithm for open pit mine design. In: Proceedings of the 24th International Symposium on Application of Computers and Operations Research in Minerals Industry, pp. 257–263.
Baker, C.K., Giacomo, S.M., 1998. Resource and reserves: their uses and abuses by the equity markets. In: Ore Reserves and Finance: A Joint Seminar between Australasian Institute of Mining and Metallurgy and ASX, Sydney.
Elkington, Durham (bib16) 2011; 42
Ataei, Osanloo (bib7) 2004; 18
King (bib23) 2011; 47
He, Zhu, Gao, Liu, Li (bib19) 2009; 36
Satybaldiev, Freidin (bib29) 2006; 42
Cetin, E., Dowd, P.A., 2002. The use of genetic algorithms for multiple cutoff grade optimization. In: Proceedings of the 32nd International Symposium on Application of Computers and Operations Research in the Mineral Industry, pp. 769–779.
Dagdelen, Kawahata (bib14) 2008; 60
Godoy (10.1016/j.resourpol.2013.09.008_bib17) 2011; 47
Ataei (10.1016/j.resourpol.2013.09.008_bib7) 2004; 18
Satybaldiev (10.1016/j.resourpol.2013.09.008_bib29) 2006; 42
Taylor (10.1016/j.resourpol.2013.09.008_bib30) 1972
Asad (10.1016/j.resourpol.2013.09.008_bib1) 2002; 21
King (10.1016/j.resourpol.2013.09.008_bib23) 2011; 47
Elkington (10.1016/j.resourpol.2013.09.008_bib16) 2011; 42
Asad (10.1016/j.resourpol.2013.09.008_bib4) 2012; 37
10.1016/j.resourpol.2013.09.008_bib5
Asad (10.1016/j.resourpol.2013.09.008_bib2) 2005; 19
10.1016/j.resourpol.2013.09.008_bib8
10.1016/j.resourpol.2013.09.008_bib13
10.1016/j.resourpol.2013.09.008_bib11
Machuca-Mory (10.1016/j.resourpol.2013.09.008_bib26) 2013; 45
10.1016/j.resourpol.2013.09.008_bib12
Goovaerts (10.1016/j.resourpol.2013.09.008_bib18) 1997
Hustrulid (10.1016/j.resourpol.2013.09.008_bib21) 2006
Vallee (10.1016/j.resourpol.2013.09.008_bib31) 2000; 93
Dagdelen (10.1016/j.resourpol.2013.09.008_bib14) 2008; 60
Osanloo (10.1016/j.resourpol.2013.09.008_bib27) 2008; 33
Boucher (10.1016/j.resourpol.2013.09.008_bib10) 2012; 44
Asad (10.1016/j.resourpol.2013.09.008_bib6) 2011; 111
Horta (10.1016/j.resourpol.2013.09.008_bib20) 2010; 42
He (10.1016/j.resourpol.2013.09.008_bib19) 2009; 36
Lane (10.1016/j.resourpol.2013.09.008_bib24) 1964; 59
Dimitrakopoulos (10.1016/j.resourpol.2013.09.008_bib15) 2007; 32
10.1016/j.resourpol.2013.09.008_bib25
10.1016/j.resourpol.2013.09.008_bib22
Asad (10.1016/j.resourpol.2013.09.008_bib3) 2007; 24
10.1016/j.resourpol.2013.09.008_bib28
Bascetin (10.1016/j.resourpol.2013.09.008_bib9) 2007; 107
References_xml – volume: 45
  start-page: 1
  year: 2013
  end-page: 30
  ident: bib26
  article-title: Non-stationary geostatistical modeling based on distance weighted statistics and distributions
  publication-title: Mathematical Geosciences
– volume: 111
  start-page: 741
  year: 2011
  end-page: 750
  ident: bib6
  article-title: Net present value maximization model for optimum cutoff grade policy of open pit mining operations
  publication-title: Journal of the South African Institute of Mining and Metallurgy
– volume: 18
  start-page: 60
  year: 2004
  end-page: 78
  ident: bib7
  article-title: Using a combination of genetic algorithm and grid search method to determine optimum cutoff grades of multiple metal deposits
  publication-title: International Journal of Surface Mining, Reclamation and Environment
– volume: 33
  start-page: 222
  year: 2008
  end-page: 229
  ident: bib27
  article-title: Incorporating environmental issues into optimum cutoff grades modelling at porphyry copper deposits
  publication-title: Resources Policy
– start-page: A160
  year: 1972
  end-page: A179
  ident: bib30
  article-title: General background theory of cutoff grades
  publication-title: Transactions of the Institution of Mining and Metallurgy
– volume: 36
  start-page: 7617
  year: 2009
  end-page: 7623
  ident: bib19
  article-title: Theory and method of genetic-neural optimizing cutoff grade and grade of crude ore
  publication-title: Expert Systems with Applications
– volume: 107
  start-page: 87
  year: 2007
  end-page: 94
  ident: bib9
  article-title: Determination of optimal cut-off grade policy to optimize NPV using a new approach with optimization factor
  publication-title: Journal of the South African Institute of Mining and Metallurgy
– volume: 37
  start-page: 81
  year: 2012
  end-page: 89
  ident: bib4
  article-title: Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpiles
  publication-title: Resources Policy
– reference: Dagdelen, K., 1993. An NPV optimization algorithm for open pit mine design. In: Proceedings of the 24th International Symposium on Application of Computers and Operations Research in Minerals Industry, pp. 257–263.
– year: 1997
  ident: bib18
  article-title: Geostatistics for Natural Resources Evaluation
– volume: 42
  start-page: 245
  year: 2006
  end-page: 250
  ident: bib29
  article-title: Optimization of mineral mining geometry and mine production capacity
  publication-title: Journal of Mining Science
– volume: 47
  start-page: 247
  year: 2011
  end-page: 253
  ident: bib23
  article-title: Optimal mining practice in strategic planning
  publication-title: Journal of Mining Science
– reference: Baker, C.K., Giacomo, S.M., 1998. Resource and reserves: their uses and abuses by the equity markets. In: Ore Reserves and Finance: A Joint Seminar between Australasian Institute of Mining and Metallurgy and ASX, Sydney.
– volume: 60
  start-page: 39
  year: 2008
  end-page: 45
  ident: bib14
  article-title: Value creation through strategic mine planning and cutoff grade optimization
  publication-title: Mining Engineering
– reference: Dagdelen, K., 1992. Cutoff grade optimization. In: Proceedings of the 23rd International Symposium on Application of Computers and Operations Research in Minerals Industry, pp. 157–165.
– volume: 24
  start-page: 723
  year: 2007
  end-page: 736
  ident: bib3
  article-title: Optimum cutoff grade policy for open pit mining operations through net present value algorithm considering metal price and cost escalation
  publication-title: Engineering Computations
– volume: 32
  start-page: 116
  year: 2007
  end-page: 125
  ident: bib15
  article-title: Evaluating mine plans under uncertainty
  publication-title: Resources Policy
– volume: 21
  start-page: 119
  year: 2002
  end-page: 127
  ident: bib1
  article-title: Development of generalized cutoff grade optimization algorithm for open pit mining operations
  publication-title: Journal of Engineering and Applied Sciences
– reference: King, B., 2001. Optimal Mine Scheduling Policies (Ph.D. thesis). Royal School of Mines, Imperial College, London University, UK.
– volume: 47
  start-page: 235
  year: 2011
  end-page: 246
  ident: bib17
  article-title: A risk quantification framework for strategic mine planning
  publication-title: Journal of Mining Science
– volume: 42
  start-page: 269
  year: 2010
  end-page: 292
  ident: bib20
  article-title: Direct sequential co-simulation with joint probability distributions
  publication-title: Mathematical Geosciences
– reference: .
– reference: Asad, M.W.A., Dimitrakopoulos, R., 2013. Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand. Journal of the Operational Research Society, 64 (2), 185–197,
– reference: Cetin, E., Dowd, P.A., 2002. The use of genetic algorithms for multiple cutoff grade optimization. In: Proceedings of the 32nd International Symposium on Application of Computers and Operations Research in the Mineral Industry, pp. 769–779.
– volume: 59
  start-page: 811
  year: 1964
  end-page: 829
  ident: bib24
  article-title: Choosing the optimum cutoff grade
  publication-title: Colorado School of Mines Quarterly
– reference: Lane, K.F., 1988. The Economic Definition of Ore, Cutoff Grade in Theory and Practice. Mining Journal Books, London.
– volume: 93
  year: 2000
  ident: bib31
  article-title: Mineral resource + engineering, economic and legal feasibility=ore reserve
  publication-title: CIM Bulletin
– volume: 42
  start-page: 177
  year: 2011
  end-page: 190
  ident: bib16
  article-title: Integrated open pit pushback selection and production capacity optimization
  publication-title: Journal of Mining Science
– volume: 19
  start-page: 176
  year: 2005
  end-page: 187
  ident: bib2
  article-title: Cutoff grade optimization algorithm with stockpiling option for open pit mining operations of two economic minerals
  publication-title: International Journal of Surface Mining, Reclamation and Environment
– volume: 44
  start-page: 449
  year: 2012
  end-page: 468
  ident: bib10
  article-title: Multivariate block-support simulation of the Yandi iron ore deposit, Western Australia
  publication-title: Mathematical Geosciences
– year: 2006
  ident: bib21
  article-title: Open Pit Mine Planning and Design
– reference: Rendu, M., 2008. An Introduction to Cutoff Grade Estimation. Society of Mining, Metallurgy, and Exploration, Inc. (SME), United States.
– ident: 10.1016/j.resourpol.2013.09.008_bib5
  doi: 10.1057/jors.2012.26
– volume: 18
  start-page: 60
  issue: 1
  year: 2004
  ident: 10.1016/j.resourpol.2013.09.008_bib7
  article-title: Using a combination of genetic algorithm and grid search method to determine optimum cutoff grades of multiple metal deposits
  publication-title: International Journal of Surface Mining, Reclamation and Environment
  doi: 10.1076/ijsm.18.1.60.23543
– ident: 10.1016/j.resourpol.2013.09.008_bib28
– volume: 107
  start-page: 87
  issue: 2
  year: 2007
  ident: 10.1016/j.resourpol.2013.09.008_bib9
  article-title: Determination of optimal cut-off grade policy to optimize NPV using a new approach with optimization factor
  publication-title: Journal of the South African Institute of Mining and Metallurgy
– ident: 10.1016/j.resourpol.2013.09.008_bib8
– ident: 10.1016/j.resourpol.2013.09.008_bib11
– volume: 59
  start-page: 811
  year: 1964
  ident: 10.1016/j.resourpol.2013.09.008_bib24
  article-title: Choosing the optimum cutoff grade
  publication-title: Colorado School of Mines Quarterly
– start-page: A160
  year: 1972
  ident: 10.1016/j.resourpol.2013.09.008_bib30
  article-title: General background theory of cutoff grades
  publication-title: Transactions of the Institution of Mining and Metallurgy
– ident: 10.1016/j.resourpol.2013.09.008_bib13
– volume: 111
  start-page: 741
  issue: 11
  year: 2011
  ident: 10.1016/j.resourpol.2013.09.008_bib6
  article-title: Net present value maximization model for optimum cutoff grade policy of open pit mining operations
  publication-title: Journal of the South African Institute of Mining and Metallurgy
– volume: 47
  start-page: 247
  issue: 2
  year: 2011
  ident: 10.1016/j.resourpol.2013.09.008_bib23
  article-title: Optimal mining practice in strategic planning
  publication-title: Journal of Mining Science
  doi: 10.1134/S1062739147020110
– volume: 36
  start-page: 7617
  issue: 4
  year: 2009
  ident: 10.1016/j.resourpol.2013.09.008_bib19
  article-title: Theory and method of genetic-neural optimizing cutoff grade and grade of crude ore
  publication-title: Expert Systems with Applications
  doi: 10.1016/j.eswa.2008.09.018
– volume: 42
  start-page: 269
  issue: 3
  year: 2010
  ident: 10.1016/j.resourpol.2013.09.008_bib20
  article-title: Direct sequential co-simulation with joint probability distributions
  publication-title: Mathematical Geosciences
  doi: 10.1007/s11004-010-9265-x
– volume: 32
  start-page: 116
  issue: 3
  year: 2007
  ident: 10.1016/j.resourpol.2013.09.008_bib15
  article-title: Evaluating mine plans under uncertainty
  publication-title: Resources Policy
  doi: 10.1016/j.resourpol.2007.06.003
– volume: 42
  start-page: 177
  issue: 2
  year: 2011
  ident: 10.1016/j.resourpol.2013.09.008_bib16
  article-title: Integrated open pit pushback selection and production capacity optimization
  publication-title: Journal of Mining Science
  doi: 10.1134/S1062739147020055
– volume: 42
  start-page: 245
  issue: 3
  year: 2006
  ident: 10.1016/j.resourpol.2013.09.008_bib29
  article-title: Optimization of mineral mining geometry and mine production capacity
  publication-title: Journal of Mining Science
  doi: 10.1007/s10913-006-0052-5
– volume: 37
  start-page: 81
  issue: 1
  year: 2012
  ident: 10.1016/j.resourpol.2013.09.008_bib4
  article-title: Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpiles
  publication-title: Resources Policy
  doi: 10.1016/j.resourpol.2011.12.002
– volume: 24
  start-page: 723
  issue: 7
  year: 2007
  ident: 10.1016/j.resourpol.2013.09.008_bib3
  article-title: Optimum cutoff grade policy for open pit mining operations through net present value algorithm considering metal price and cost escalation
  publication-title: Engineering Computations
  doi: 10.1108/02644400710817961
– ident: 10.1016/j.resourpol.2013.09.008_bib25
– volume: 60
  start-page: 39
  issue: 1
  year: 2008
  ident: 10.1016/j.resourpol.2013.09.008_bib14
  article-title: Value creation through strategic mine planning and cutoff grade optimization
  publication-title: Mining Engineering
– year: 2006
  ident: 10.1016/j.resourpol.2013.09.008_bib21
– volume: 44
  start-page: 449
  issue: 4
  year: 2012
  ident: 10.1016/j.resourpol.2013.09.008_bib10
  article-title: Multivariate block-support simulation of the Yandi iron ore deposit, Western Australia
  publication-title: Mathematical Geosciences
  doi: 10.1007/s11004-012-9402-9
– ident: 10.1016/j.resourpol.2013.09.008_bib12
– volume: 93
  year: 2000
  ident: 10.1016/j.resourpol.2013.09.008_bib31
  article-title: Mineral resource + engineering, economic and legal feasibility=ore reserve
  publication-title: CIM Bulletin
– volume: 21
  start-page: 119
  issue: 2
  year: 2002
  ident: 10.1016/j.resourpol.2013.09.008_bib1
  article-title: Development of generalized cutoff grade optimization algorithm for open pit mining operations
  publication-title: Journal of Engineering and Applied Sciences
– volume: 47
  start-page: 235
  issue: 2
  year: 2011
  ident: 10.1016/j.resourpol.2013.09.008_bib17
  article-title: A risk quantification framework for strategic mine planning
  publication-title: Journal of Mining Science
  doi: 10.1134/S1062739147020109
– year: 1997
  ident: 10.1016/j.resourpol.2013.09.008_bib18
– volume: 33
  start-page: 222
  issue: 4
  year: 2008
  ident: 10.1016/j.resourpol.2013.09.008_bib27
  article-title: Incorporating environmental issues into optimum cutoff grades modelling at porphyry copper deposits
  publication-title: Resources Policy
  doi: 10.1016/j.resourpol.2008.06.001
– volume: 19
  start-page: 176
  issue: 3
  year: 2005
  ident: 10.1016/j.resourpol.2013.09.008_bib2
  article-title: Cutoff grade optimization algorithm with stockpiling option for open pit mining operations of two economic minerals
  publication-title: International Journal of Surface Mining, Reclamation and Environment
  doi: 10.1080/13895260500258661
– volume: 45
  start-page: 1
  issue: 1
  year: 2013
  ident: 10.1016/j.resourpol.2013.09.008_bib26
  article-title: Non-stationary geostatistical modeling based on distance weighted statistics and distributions
  publication-title: Mathematical Geosciences
  doi: 10.1007/s11004-012-9428-z
– ident: 10.1016/j.resourpol.2013.09.008_bib22
SSID ssj0005786
Score 2.1806617
Snippet Cutoff grade specifies the available supply of metallic ore from an open pit mine to the multiple processing streams of an open pit mining complex. An optimal...
SourceID proquest
crossref
elsevier
SourceType Aggregation Database
Enrichment Source
Index Database
Publisher
StartPage 591
SubjectTerms Cash flow
Cutoff grade
Heuristic algorithms
Heuristics
issues and policy
Marketing
markets
Mines
Mining
Open pit mine planning
Open pit mining
Optimization
Policies
Refining
risk
Stochastic optimization
Stochastic processes
Streams
Uncertainty
Title A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams
URI https://dx.doi.org/10.1016/j.resourpol.2013.09.008
https://www.proquest.com/docview/1519503434
https://www.proquest.com/docview/1524408575
https://www.proquest.com/docview/1540224274
https://www.proquest.com/docview/1733511382
https://www.proquest.com/docview/1753514138
Volume 38
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVESC
  databaseName: Baden-Württemberg Complete Freedom Collection (Elsevier)
  customDbUrl:
  eissn: 1873-7641
  dateEnd: 99991231
  omitProxy: true
  ssIdentifier: ssj0005786
  issn: 0301-4207
  databaseCode: GBLVA
  dateStart: 20110101
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
– providerCode: PRVESC
  databaseName: Elsevier SD Complete Freedom Collection [SCCMFC]
  customDbUrl:
  eissn: 1873-7641
  dateEnd: 99991231
  omitProxy: true
  ssIdentifier: ssj0005786
  issn: 0301-4207
  databaseCode: ACRLP
  dateStart: 19950301
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
– providerCode: PRVESC
  databaseName: ScienceDirect (Elsevier)
  customDbUrl:
  eissn: 1873-7641
  dateEnd: 99991231
  omitProxy: true
  ssIdentifier: ssj0005786
  issn: 0301-4207
  databaseCode: .~1
  dateStart: 19950101
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
– providerCode: PRVESC
  databaseName: ScienceDirect Freedom Collection Journals
  customDbUrl:
  eissn: 1873-7641
  dateEnd: 99991231
  omitProxy: true
  ssIdentifier: ssj0005786
  issn: 0301-4207
  databaseCode: AIKHN
  dateStart: 19950301
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
– providerCode: PRVLSH
  databaseName: Elsevier Journals
  customDbUrl:
  mediaType: online
  eissn: 1873-7641
  dateEnd: 99991231
  omitProxy: true
  ssIdentifier: ssj0005786
  issn: 0301-4207
  databaseCode: AKRWK
  dateStart: 19740101
  isFulltext: true
  providerName: Library Specific Holdings
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV1La9wwEBYhvbSH0qYNTR9BhV7dtWVZtnNbloTtK5S2gdzESDtuNnTXZtcLgUJ_e2dkO01K2Rx6MjafjK2R5qF5CfFGuwSqzGDkHPJpFdkpBaoq0pAYIAkKcXC0fzo10zP9_jw73xGTIReGwyp73t_x9MCt-yejfjZHzXw--hqsAcVWFgu6kvmw1jl3MXj760aYR150_koymxl9K8ZrFY7Im5p9EEkaCp5yn8l_S6i_eHUQQCePxMNec5Tj7uMeix1c7okHN-oJ7on94z9pawTt9-36ifg5lhe46Yoyy6GMuGxrSaqfv4Dw2G_auqrk9xXMUNbESRZ9iqYkvVZyly3ZzFu5CB0lZAhFxytcSz7JlUNcomy6xAOGcBoKLNZPxdnJ8bfJNOrbLkQ-S9I2Uk4B-lijLr0pSd9zCpUpHBk_2mU5ZKYwBRqSfuDymdGxKyuad9SEKkso0n2xu6yX-EzI0iNUMxV7KJz2mENOtCf2GmswtAzgQJhhqq3va5Jza4wfdgg-u7TXNLJMIxuXlmh0IOLrgU1XluPuIUcDLe2tFWZJeNw9-PVAfUv7j50qsMR6s7YJl-eJU53qbRjFjb1JM96G0axOqXzbe_KU_b5pobZhMk7OINDz__nhF-I-33WBOy_Fbrva4CtSv1p3GPbXobg3nnz5-Jmv7z5MT38Dt4k2jA
linkProvider Elsevier
linkToHtml http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV1LT9wwELYQHGgPFdCiQik1Uq_pJo5jJ9wQAm15XQoSN8v2TsoidhPtZqVKlfrbO-MkFKpqOfTqfI4Sjz0Pz4uxz9IltswURM4B3VahnZKDKCNpE2VRgto4ONovr9TwRp7dZrcr7LjPhaGwyo73tzw9cOtuZNCt5qAejwffgjUgyMoiQVcgH16TmdBkgX359STOQ-etwxLtZoI_C_KahTvyuiInRJKGiqfUaPLfIuovZh0k0OkGe9Opjvyo_bpNtgLTLfb6SUHBLbZ98idvDaHdwZ2_ZT-P-B0s2qrMvK8jzpuKo-7n72wY9oumKkv-fWZHwCtkJZMuR5OjYsupzRavxw2fhJYSPMSiww-Yc7rK5X1gIq_bzAOCUB6KnczfsZvTk-vjYdT1XYh8lqRNJJyw4GMJsvCqQIXPCRAqd2j9SJdpm6lc5aBQ_FmnR0rGriilFiARVRQ2T7fZ6rSawnvGCw-2HInY29xJD9pqJD7y11hahfvA7jDVL7XxXVFy6o3xYPros3vzSCNDNDJxYZBGOyx-nFi3dTlennLY09I822IGpcfLkw966hs8gORVsVOoFnOTUH2eOJWpXIYR1NkbVeNlGEn6lNDL3qNTcvymuViGySg7A0G7__PDn9j68Prywlx8vTr_wF7RkzaKZ4-tNrMFfERdrHH74az9BtxkNow
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=A+heuristic+approach+to+stochastic+cutoff+grade+optimization+for+open+pit+mining+complexes+with+multiple+processing+streams&rft.jtitle=Resources+policy&rft.au=Asad%2C+Mohammad&rft.au=Dimitrakopoulos%2C+Roussos&rft.date=2013-12-01&rft.issn=0301-4207&rft.volume=38&rft.issue=4&rft.spage=591&rft.epage=597&rft_id=info:doi/10.1016%2Fj.resourpol.2013.09.008&rft.externalDBID=NO_FULL_TEXT
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0301-4207&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0301-4207&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0301-4207&client=summon