APA (7th ed.) Citation

Deng, G., Wei, M., Su, Q., & Zhao, M. (2015). An effective co-evolutionary quantum genetic algorithm for the no-wait flow shop scheduling problem. Advances in mechanical engineering, 7(12), 1. https://doi.org/10.1177/1687814015622900

Chicago Style (17th ed.) Citation

Deng, Guanlong, Ming Wei, Qingtang Su, and Mei Zhao. "An Effective Co-evolutionary Quantum Genetic Algorithm for the No-wait Flow Shop Scheduling Problem." Advances in Mechanical Engineering 7, no. 12 (2015): 1. https://doi.org/10.1177/1687814015622900.

MLA (9th ed.) Citation

Deng, Guanlong, et al. "An Effective Co-evolutionary Quantum Genetic Algorithm for the No-wait Flow Shop Scheduling Problem." Advances in Mechanical Engineering, vol. 7, no. 12, 2015, p. 1, https://doi.org/10.1177/1687814015622900.

Warning: These citations may not always be 100% accurate.