He, C., Yu, B., Liu, M., Guo, L., Tian, L., & Huang, J. (2024). Utilizing Large Language Models to Illustrate Constraints for Construction Planning. Buildings (Basel), 14(8), 2511. https://doi.org/10.3390/buildings14082511
Chicago Style (17th ed.) CitationHe, Chuanni, Bei Yu, Min Liu, Lu Guo, Li Tian, and Jianfeng Huang. "Utilizing Large Language Models to Illustrate Constraints for Construction Planning." Buildings (Basel) 14, no. 8 (2024): 2511. https://doi.org/10.3390/buildings14082511.
MLA (9th ed.) CitationHe, Chuanni, et al. "Utilizing Large Language Models to Illustrate Constraints for Construction Planning." Buildings (Basel), vol. 14, no. 8, 2024, p. 2511, https://doi.org/10.3390/buildings14082511.
Warning: These citations may not always be 100% accurate.