Intraday Optimization of Pumped Hydro Power Plants in the German Electricity Market
Historically, the optimal production of hydro power plants was determined once day ahead. Today, many regulatory requirements in the German electricity market make this process much more complex: Power plant operators are committed to report information on planned production and even on provision of...
        Saved in:
      
    
          | Published in | Energy procedia Vol. 87; pp. 45 - 52 | 
|---|---|
| Main Authors | , | 
| Format | Journal Article | 
| Language | English | 
| Published | 
            Elsevier Ltd
    
        01.01.2016
     | 
| Subjects | |
| Online Access | Get full text | 
| ISSN | 1876-6102 1876-6102  | 
| DOI | 10.1016/j.egypro.2015.12.356 | 
Cover
| Abstract | Historically, the optimal production of hydro power plants was determined once day ahead. Today, many regulatory requirements in the German electricity market make this process much more complex: Power plant operators are committed to report information on planned production and even on provision of balancing energy of each single generator to transmission system operators. As soon as a deviation in the schedule occurs, the information hast to be updated and reported again. These requirements lead to the point where optimization of pumped hydro power plants can no longer be done manually.
In order to fulfil these requirements, EnBW has developed its own optimization model and established a system-based day ahead and intraday asset optimization process. The optimization problem is formulated as a mixed integer problem which determines the minimum operating cost subject to all technical constraints of a hydrothermal portfolio and covering load.
As a post-optimization of this new intraday optimization system we set up an effective multistage looping optimization algorithm for daily pumped hydro power plants considering e. g. reservoir limits, quarter-hourly prices, grid charges and availabilities. A real world case study is presented and discussed. | 
    
|---|---|
| AbstractList | Historically, the optimal production of hydro power plants was determined once day ahead. Today, many regulatory requirements in the German electricity market make this process much more complex: Power plant operators are committed to report information on planned production and even on provision of balancing energy of each single generator to transmission system operators. As soon as a deviation in the schedule occurs, the information hast to be updated and reported again. These requirements lead to the point where optimization of pumped hydro power plants can no longer be done manually.
In order to fulfil these requirements, EnBW has developed its own optimization model and established a system-based day ahead and intraday asset optimization process. The optimization problem is formulated as a mixed integer problem which determines the minimum operating cost subject to all technical constraints of a hydrothermal portfolio and covering load.
As a post-optimization of this new intraday optimization system we set up an effective multistage looping optimization algorithm for daily pumped hydro power plants considering e. g. reservoir limits, quarter-hourly prices, grid charges and availabilities. A real world case study is presented and discussed. | 
    
| Author | Braun, Sebastian Hoffmann, Rainer  | 
    
| Author_xml | – sequence: 1 givenname: Sebastian surname: Braun fullname: Braun, Sebastian organization: EnBW Energie Baden-Württemberg AG, Durlacher Allee 93, 76131 Karlsruhe, Germany – sequence: 2 givenname: Rainer surname: Hoffmann fullname: Hoffmann, Rainer email: ra.hoffmann@enbw.com organization: EnBW Energie Baden-Württemberg AG, Durlacher Allee 93, 76131 Karlsruhe, Germany  | 
    
| BookMark | eNqN0EFPwjAUwPHGYCKg38BDvwCzXVm3eTAxBIEEA4l6bkr7qsWtW7oimZ_eIR6MB_X03uX_kvcboJ6rHCB0SUlECeVX2wie29pXUUxoEtE4Ygk_QX2apXzEKYl73_YzNGiaLSEpIdm4jx4WLnipZYtXdbClfZfBVg5XBq93ZQ0az1vtK7yu9uDxupAuNNg6HF4Az8CX0uFpASp4q2xo8b30rxDO0amRRQMXX3OInu6mj5P5aLmaLSa3y5FiOQsjRViiNmOZ5oQpvRkDp4liRPPUAE-l4jGTBlRMzSZRhuksV5CZ3HANeSrzmA1Rcry7c7Vs97IoRO1tKX0rKBEHGbEVRxlxkBE0Fp1M142PnfJV03gw_82uf2Tdz59cnaAt_opvjjF0IG8WvGiUBadAW9_5CV3Z3w98AGuyl6o | 
    
| CitedBy_id | crossref_primary_10_1515_auto_2024_0128 crossref_primary_10_1016_j_enpol_2019_05_004 crossref_primary_10_1007_s00202_024_02428_2 crossref_primary_10_4995_ia_2017_5277 crossref_primary_10_1145_3717413_3717428 crossref_primary_10_1109_TPWRS_2019_2957246 crossref_primary_10_1007_s10994_021_06020_8 crossref_primary_10_3390_forecast4010004  | 
    
| Cites_doi | 10.1287/opre.1040.0117 10.1016/0140-6701(96)88715-7 10.1016/j.enconman.2009.11.001 10.1016/j.jhydrol.2009.05.009 10.1109/TPWRS.2004.825911 10.1016/j.renene.2008.07.005 10.1016/S0165-1889(01)00030-6 10.1016/0377-2217(93)90344-M  | 
    
| ContentType | Journal Article | 
    
| Copyright | 2016 The Authors | 
    
| Copyright_xml | – notice: 2016 The Authors | 
    
| DBID | 6I. AAFTH AAYXX CITATION ADTOC UNPAY  | 
    
| DOI | 10.1016/j.egypro.2015.12.356 | 
    
| DatabaseName | ScienceDirect Open Access Titles Elsevier:ScienceDirect:Open Access CrossRef Unpaywall for CDI: Periodical Content Unpaywall  | 
    
| DatabaseTitle | CrossRef | 
    
| DatabaseTitleList | |
| Database_xml | – sequence: 1 dbid: UNPAY name: Unpaywall url: https://proxy.k.utb.cz/login?url=https://unpaywall.org/ sourceTypes: Open Access Repository  | 
    
| DeliveryMethod | fulltext_linktorsrc | 
    
| Discipline | Economics Engineering  | 
    
| EISSN | 1876-6102 | 
    
| EndPage | 52 | 
    
| ExternalDocumentID | 10.1016/j.egypro.2015.12.356 10_1016_j_egypro_2015_12_356 S1876610215030453  | 
    
| GroupedDBID | --K 0R~ 0SF 1B1 1~5 4.4 457 4G. 5VS 6I. 7-5 71M AACTN AAEDT AAEDW AAFTH AAFWJ AAIKJ AALRI AAQFI AAXUO ABMAC ACGFS ADBBV ADEZE ADMUD ADVLN AEXQZ AFTJW AGHFR AGUBO AITUG AKRWK ALMA_UNASSIGNED_HOLDINGS AMRAJ E3Z EBS EJD EP2 EP3 FDB FEDTE FIRID FNPLU HVGLF HZ~ IXB KQ8 M41 NCXOZ O-L O9- OK1 OKI OZT RIG ROL SES SSZ TR2 XH2 ~S- AAYWO AAYXX ABWVN ACRPL ACVFH ADCNI ADNMO AEUPX AFPUW AIGII AKBMS AKYEP CITATION EFLBG ~HD ADTOC UNPAY  | 
    
| ID | FETCH-LOGICAL-c393t-c035cb4a7903cdb4e615c30d67fe67ac623afec21fb5cf3d89ce8f9f6de97a923 | 
    
| IEDL.DBID | UNPAY | 
    
| ISSN | 1876-6102 | 
    
| IngestDate | Tue Aug 19 21:23:00 EDT 2025 Wed Oct 01 04:59:22 EDT 2025 Thu Apr 24 23:05:25 EDT 2025 Tue Jul 16 04:30:40 EDT 2024  | 
    
| IsDoiOpenAccess | true | 
    
| IsOpenAccess | true | 
    
| IsPeerReviewed | true | 
    
| IsScholarly | true | 
    
| Keywords | pumped hydro power plants continuous intraday trading intraday optimization mixed integer programming  | 
    
| Language | English | 
    
| License | http://creativecommons.org/licenses/by-nc-nd/4.0 cc-by-nc-nd  | 
    
| LinkModel | DirectLink | 
    
| MergedId | FETCHMERGED-LOGICAL-c393t-c035cb4a7903cdb4e615c30d67fe67ac623afec21fb5cf3d89ce8f9f6de97a923 | 
    
| OpenAccessLink | https://proxy.k.utb.cz/login?url=https://doi.org/10.1016/j.egypro.2015.12.356 | 
    
| PageCount | 8 | 
    
| ParticipantIDs | unpaywall_primary_10_1016_j_egypro_2015_12_356 crossref_primary_10_1016_j_egypro_2015_12_356 crossref_citationtrail_10_1016_j_egypro_2015_12_356 elsevier_sciencedirect_doi_10_1016_j_egypro_2015_12_356  | 
    
| ProviderPackageCode | CITATION AAYXX  | 
    
| PublicationCentury | 2000 | 
    
| PublicationDate | January 2016 2016-01-00  | 
    
| PublicationDateYYYYMMDD | 2016-01-01 | 
    
| PublicationDate_xml | – month: 01 year: 2016 text: January 2016  | 
    
| PublicationDecade | 2010 | 
    
| PublicationTitle | Energy procedia | 
    
| PublicationYear | 2016 | 
    
| Publisher | Elsevier Ltd | 
    
| Publisher_xml | – name: Elsevier Ltd | 
    
| References | Wood, Allen J.; Wollenberg, Bruce F.; Sheblé, Gerald B. Power generation, operation, and control. Third edition. New York: Wiley; 1996. Horsley, Wrobel (bib0015) 2002; 27 Oliviera, McKee, Coles (bib0025) 1993; 71 Zhao, Davison (bib0035) 2009 b; 373 Bundesnetzagentur, Festlegung von Datenaustauschprozessen im Rahmen eines Energieinformationsnetzes (Process for data exchange in terms of the „Energy Information Grid), http://www.bundesnetzagentur.de/cln_1431/DE/Service-Funktionen/Beschlusskammern/Beschlusskammer6/BK6_96_Energieinformationsnetz/Energieinformationsnetz-node.html; 2015-08-24. Lu, Chow, Desrochers (bib0005) May 2004; 19 Zhao, Davison (bib0030) 2009; 34 Kanakasabapathy, Swarup (bib0020) 2010; 51 Thompson, Davison, Rasmussen (bib0040) 2004; 52 10.1016/j.egypro.2015.12.356_bib0010 Thompson (10.1016/j.egypro.2015.12.356_bib0040) 2004; 52 Horsley (10.1016/j.egypro.2015.12.356_bib0015) 2002; 27 Oliviera (10.1016/j.egypro.2015.12.356_bib0025) 1993; 71 Kanakasabapathy (10.1016/j.egypro.2015.12.356_bib0020) 2010; 51 Zhao (10.1016/j.egypro.2015.12.356_bib0030) 2009; 34 Zhao (10.1016/j.egypro.2015.12.356_bib0035) 2009; 373 Lu (10.1016/j.egypro.2015.12.356_bib0005) 2004; 19 10.1016/j.egypro.2015.12.356_bib0045  | 
    
| References_xml | – reference: Bundesnetzagentur, Festlegung von Datenaustauschprozessen im Rahmen eines Energieinformationsnetzes (Process for data exchange in terms of the „Energy Information Grid), http://www.bundesnetzagentur.de/cln_1431/DE/Service-Funktionen/Beschlusskammern/Beschlusskammer6/BK6_96_Energieinformationsnetz/Energieinformationsnetz-node.html; 2015-08-24. – reference: Wood, Allen J.; Wollenberg, Bruce F.; Sheblé, Gerald B. Power generation, operation, and control. Third edition. New York: Wiley; 1996. – volume: 52 start-page: 546 year: 2004 end-page: 562 ident: bib0040 article-title: Valuation and optimal operation of electric power plants in competitive markets publication-title: Operations Research – volume: 71 start-page: 334 year: 1993 end-page: 340 ident: bib0025 article-title: Optimal scheduling of a hydro thermal power generation system publication-title: European Journal of Operational Research – volume: 34 start-page: 1064 year: 2009 end-page: 1077 ident: bib0030 article-title: Optimal control of hydroelectric facility incorporating pump storage publication-title: Renewable Energy – volume: 51 start-page: 572 year: 2010 end-page: 579 ident: bib0020 article-title: Bidding strategy for pumped-storage plant in pool-based electricity market publication-title: Energy Conversion and Management – volume: 373 start-page: 453 year: 2009 b end-page: 462 ident: bib0035 article-title: Valuing hydrological forecasts for a pumped storage assisted hydro facility publication-title: Journal of Hydrology – volume: 19 start-page: 834 year: May 2004 end-page: 841 ident: bib0005 article-title: Pumped-Storage Hydro-Turbine Bidding Strategies in a Competitive Electricity Market publication-title: IEEE Trans on Power Systems – volume: 27 start-page: 109 year: 2002 end-page: 142 ident: bib0015 article-title: Efficiency rents of pumped-storage plants and their uses for operation and investment decisions publication-title: Journal of Economic Dynamics & Control – volume: 52 start-page: 546 issue: 4 year: 2004 ident: 10.1016/j.egypro.2015.12.356_bib0040 article-title: Valuation and optimal operation of electric power plants in competitive markets publication-title: Operations Research doi: 10.1287/opre.1040.0117 – ident: 10.1016/j.egypro.2015.12.356_bib0010 doi: 10.1016/0140-6701(96)88715-7 – volume: 51 start-page: 572 year: 2010 ident: 10.1016/j.egypro.2015.12.356_bib0020 article-title: Bidding strategy for pumped-storage plant in pool-based electricity market publication-title: Energy Conversion and Management doi: 10.1016/j.enconman.2009.11.001 – ident: 10.1016/j.egypro.2015.12.356_bib0045 – volume: 373 start-page: 453 year: 2009 ident: 10.1016/j.egypro.2015.12.356_bib0035 article-title: Valuing hydrological forecasts for a pumped storage assisted hydro facility publication-title: Journal of Hydrology doi: 10.1016/j.jhydrol.2009.05.009 – volume: 19 start-page: 834 issue: 2 year: 2004 ident: 10.1016/j.egypro.2015.12.356_bib0005 article-title: Pumped-Storage Hydro-Turbine Bidding Strategies in a Competitive Electricity Market publication-title: IEEE Trans on Power Systems doi: 10.1109/TPWRS.2004.825911 – volume: 34 start-page: 1064 issue: 4 year: 2009 ident: 10.1016/j.egypro.2015.12.356_bib0030 article-title: Optimal control of hydroelectric facility incorporating pump storage publication-title: Renewable Energy doi: 10.1016/j.renene.2008.07.005 – volume: 27 start-page: 109 year: 2002 ident: 10.1016/j.egypro.2015.12.356_bib0015 article-title: Efficiency rents of pumped-storage plants and their uses for operation and investment decisions publication-title: Journal of Economic Dynamics & Control doi: 10.1016/S0165-1889(01)00030-6 – volume: 71 start-page: 334 year: 1993 ident: 10.1016/j.egypro.2015.12.356_bib0025 article-title: Optimal scheduling of a hydro thermal power generation system publication-title: European Journal of Operational Research doi: 10.1016/0377-2217(93)90344-M  | 
    
| SSID | ssj0070084 | 
    
| Score | 2.1696434 | 
    
| Snippet | Historically, the optimal production of hydro power plants was determined once day ahead. Today, many regulatory requirements in the German electricity market... | 
    
| SourceID | unpaywall crossref elsevier  | 
    
| SourceType | Open Access Repository Enrichment Source Index Database Publisher  | 
    
| StartPage | 45 | 
    
| SubjectTerms | continuous intraday trading intraday optimization mixed integer programming pumped hydro power plants  | 
    
| SummonAdditionalLinks | – databaseName: Elsevier Free Content dbid: IXB link: http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1dS8MwFA1jL9MH0ak4v8iDr3Hr0jTto47NTVAHc7C3kt4kMJnd2Aeyf29u144JwsTHloSUm_TkNL33HELuuGl6WgrJlLCS-RAAUzbyGWitAjDKA5upfb4G3aH_PBKjEmkVtTCYVplj_wbTM7TO79TzaNZn43F94LkXOUBnapH97kPFT-6HaN_QGz0WaCxRMB4_ulxjhq2L8rksxwutvuZYAugJPBTkaGP9-_ZUWaUztf5Sk8nO9tM5Jkc5b6QPm0c7ISWTVkmlKCteVMnhjrLgKRn08NBWqzV9c5jwmRdb0qmlfTd_RtPuWs-ntI8eaRSNi5YLOk6pY4P0CbE6pe3MH2cMjqXTl6w0-owMO-33Vpfl_gkMeMSXDBpcQOIrGTU46MQ3jr0Ab-hAWhNIBY75KGug6dlEgOU6jMCENrKBNpFUjvmdk3I6Tc0FoWFgUKnG0REV-lZEKglBNrQ0HrdWCa9GeBG2GHJxcfS4mMRFFtlHvAl2jMGOvWbsgl0jbNtrthHX2NNeFjMS_1gkscP_PT3vtxP4p6Eu_z3UFTlwV_kxzTUpL-crc-OIyzK5zVbmN39T7e4 priority: 102 providerName: Elsevier  | 
    
| Title | Intraday Optimization of Pumped Hydro Power Plants in the German Electricity Market | 
    
| URI | https://dx.doi.org/10.1016/j.egypro.2015.12.356 https://doi.org/10.1016/j.egypro.2015.12.356  | 
    
| UnpaywallVersion | publishedVersion | 
    
| Volume | 87 | 
    
| hasFullText | 1 | 
    
| inHoldings | 1 | 
    
| isFullTextHit | |
| isPrint | |
| journalDatabaseRights | – providerCode: PRVAFT databaseName: Open Access Digital Library customDbUrl: eissn: 1876-6102 dateEnd: 20191231 omitProxy: true ssIdentifier: ssj0070084 issn: 1876-6102 databaseCode: KQ8 dateStart: 20090201 isFulltext: true titleUrlDefault: http://grweb.coalliance.org/oadl/oadl.html providerName: Colorado Alliance of Research Libraries – providerCode: PRVESC databaseName: Elsevier Free Content customDbUrl: eissn: 1876-6102 dateEnd: 20191231 omitProxy: true ssIdentifier: ssj0070084 issn: 1876-6102 databaseCode: IXB dateStart: 20090201 isFulltext: true titleUrlDefault: https://www.sciencedirect.com providerName: Elsevier – providerCode: PRVLSH databaseName: Elsevier Journals customDbUrl: mediaType: online eissn: 1876-6102 dateEnd: 99991231 omitProxy: true ssIdentifier: ssj0070084 issn: 1876-6102 databaseCode: AKRWK dateStart: 20090201 isFulltext: true providerName: Library Specific Holdings  | 
    
| link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwlV3fS8MwED7mfBAf_C1OpuTBRzvWpUnaxynqFJwDHcynkl4SUGc3tg6Zf73J2ooK_nrPkXB3Tb6kd98HcER1y1eCCU8yI7wAOXrSRIGHSkmOWvpoFmyfXd7pB1cDNqjAcdkL8-n__aIOy8lxTVybns_cwx1lfAmWObPIuwrL_W6vfe_uVPajtrcgV6xT_8n0u9NnZZaO5fxFDocfTpfzdbgu15UXlTw1ZlnSwNcvlI1_XfgGrBUwk7TzvNiEik63YKXsQp5uweoHIsJtuL10b7xKzsmN3UKei95MMjKkZ8OtFenM1WREek5SjTido2xKHlJiwSO5cFt7Ss4WcjoPaEE9uV50Uu9A__zs7rTjFXILHtKIZh42KcMkkCJqUlRJoC3YQdpUXBjNhUQLlKTR2PJNwtBQFUaoQxMZrnQkpAWKu1BNR6neAxJy7YhtLHqRYWBYJJMQRVMJ7VNjJPNrQMswxFhwkTtJjGFcFp09xrn7Yue-2G_F1n018N6txjkXxy_jRRnhuMATOU6IbbB-sWy8J8Sfptr_r0Edqtlkpg8sosmSQ1i6HJwcFun8BhcV980 | 
    
| linkProvider | Unpaywall | 
    
| linkToHtml | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1LT-MwEB5B91A4oF0eWh6768NeTZs6jpMjVLBlt7BIgNSb5YxtqaibVn0I9d_jSRNUJCTQXhNbjmacmS_OfPMB_BSuE1klFTfSKx5jgtz4LOZorUnQmQh92e3zJuk9xL8HcrAB3ZoLQ2WVVexfxfQyWldXWpU1W5PhsHUXhRc5IWVqWf7uE5vwKZYBnRCLb3Beh2NFHePpqyuM5jS85s-VRV6k9TUlDmAk6VRQkI712_mpuSgmZvlkRqO1_HP5GXYq4MjOVs_2BTZcsQvNmlc824XttdaCe3B3Rae21izZ3xAU_lVsSzb27DY40FnWW9rpmN2SSBoj5aL5jA0LFuAg-0XBumAXpUDOEANMZ9clN3ofHi4v7rs9XgkocBSZmHNsC4l5bFTWFmjz2AX4gqJtE-VdogwG6GO8w07kc4le2DRDl_rMJ9ZlygTodwCNYly4r8DSxFGrmoBHTBp7mZk8RdW2ykXCeyOjQxC12TRW3cVJ5GKk6zKyR70ytiZj66ijg7EPgb_Mmqy6a7wzXtUe0a92iQ4J4J2Zpy8O_NBSR_-91A9o9u6v-7p_dfPnGLbCnerM5gQa8-nCfQsoZp5_L3fpM41o8RQ | 
    
| linkToUnpaywall | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwlV1NSwMxEB1qeyge_BYVlRw8uqXbbJLdo4haBbWgBT0t2UkC1botdYvUX2-yH6KCtt4zJMzMJi_ZmfcAjqju-Eow4UlmhBcgR0-aKPBQKclRSx9NzvZ5w7v94OqBPdTguOqF-fb_Pq_DcnJcE9em5zP3cEcZX4IGZxZ516HRv-mdPLo7lf2o7S3IFevs_2X62-nTnKZjOXuTw-GX0-V8Fa6rdRVFJc-taZa08P0HZeOiC1-DlRJmkpMiL9ahptMNaFZdyK8bsPyFiHAT7i7dG6-SM3Jrt5CXsjeTjAzp2XBrRbozNRmRnpNUI07nKHslg5RY8Egu3NaekrNcTmeAFtST67yTegv652f3p12vlFvwkEY087BNGSaBFFGbokoCbcEO0rbiwmguJFqgJI3Gjm8ShoaqMEIdmshwpSMhLVDchno6SvUOkJBrR2xj0YsMA8MimYQo2kponxojmb8LtApDjCUXuZPEGMZV0dlTXLgvdu6L_U5s3bcL3qfVuODimDNeVBGOSzxR4ITYBmuOZeszIRaaau-_BvtQzyZTfWARTZYclon8AU149sk | 
    
| openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Intraday+Optimization+of+Pumped+Hydro+Power+Plants+in+the+German+Electricity+Market&rft.jtitle=Energy+procedia&rft.au=Braun%2C+Sebastian&rft.au=Hoffmann%2C+Rainer&rft.date=2016-01-01&rft.issn=1876-6102&rft.volume=87&rft.spage=45&rft.epage=52&rft_id=info:doi/10.1016%2Fj.egypro.2015.12.356&rft.externalDBID=n%2Fa&rft.externalDocID=10_1016_j_egypro_2015_12_356 | 
    
| thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1876-6102&client=summon | 
    
| thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1876-6102&client=summon | 
    
| thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1876-6102&client=summon |