Chen, C., Su, W., Dou, W., Dong, Y., & Zhang, B. (2025). Construction control of cable-stayed bridge top push method based on BIM technology. Discover applied sciences, 7(4), 346-14. https://doi.org/10.1007/s42452-025-06764-1
Chicago Style (17th ed.) CitationChen, Chengyong, Wenming Su, Wenqiang Dou, Yongquan Dong, and Ben Zhang. "Construction Control of Cable-stayed Bridge Top Push Method Based on BIM Technology." Discover Applied Sciences 7, no. 4 (2025): 346-14. https://doi.org/10.1007/s42452-025-06764-1.
MLA (9th ed.) CitationChen, Chengyong, et al. "Construction Control of Cable-stayed Bridge Top Push Method Based on BIM Technology." Discover Applied Sciences, vol. 7, no. 4, 2025, pp. 346-14, https://doi.org/10.1007/s42452-025-06764-1.
Warning: These citations may not always be 100% accurate.