Design and construction progress of BRIF
A new RIB project, the Beijing Radioactive Ion-beam Facility (BRIF), has been running at CIAE since 2004. In this project, a 100 MeV H-cyclotron, CYCIAE-100, is selected as the driving accelerator providing a 75-100 MeV, 200-500 μA proton beam. An ISOL system employs two stage separators to reach th...
Saved in:
Published in | Chinese physics C Vol. 34; no. 1; pp. 103 - 111 |
---|---|
Main Author | |
Format | Journal Article |
Language | English |
Published |
IOP Publishing
2010
China Institute of Atomic Energy, Beijing 102413, China |
Subjects | |
Online Access | Get full text |
ISSN | 1674-1137 0254-3052 2058-6132 |
DOI | 10.1088/1674-1137/34/1/019 |
Cover
Summary: | A new RIB project, the Beijing Radioactive Ion-beam Facility (BRIF), has been running at CIAE since 2004. In this project, a 100 MeV H-cyclotron, CYCIAE-100, is selected as the driving accelerator providing a 75-100 MeV, 200-500 μA proton beam. An ISOL system employs two stage separators to reach the mass resolution of 20000. Its RIB beam will be injected into the existing Tandem and a superconducting booster installed down stream of the Tandem will increase the energy by 2 MeV/q. The progress of BRIF, giving special emphasis to CYCIAE-100, will be introduced in this paper. |
---|---|
Bibliography: | 11-5641/O4 cyclotron, main magnet, RF cavity, ISOL, QWR, superconducting cavity O571 TV511 |
ISSN: | 1674-1137 0254-3052 2058-6132 |
DOI: | 10.1088/1674-1137/34/1/019 |