APA (7th ed.) Citation

Zhang, X. Y., & Chen, L. (2018). A re-entrant hybrid flow shop scheduling problem with machine eligibility constraints. International journal of production research, 56(16), 5293-5305. https://doi.org/10.1080/00207543.2017.1408971

Chicago Style (17th ed.) Citation

Zhang, Xiang Yi, and Lu Chen. "A Re-entrant Hybrid Flow Shop Scheduling Problem with Machine Eligibility Constraints." International Journal of Production Research 56, no. 16 (2018): 5293-5305. https://doi.org/10.1080/00207543.2017.1408971.

MLA (9th ed.) Citation

Zhang, Xiang Yi, and Lu Chen. "A Re-entrant Hybrid Flow Shop Scheduling Problem with Machine Eligibility Constraints." International Journal of Production Research, vol. 56, no. 16, 2018, pp. 5293-5305, https://doi.org/10.1080/00207543.2017.1408971.

Warning: These citations may not always be 100% accurate.