An effective heuristic for flexible job-shop scheduling problem with maintenance activities

Most production scheduling problems, including the standard flexible job-shop scheduling problem (FJSP), assume that machines are continuously available. However, in most realistic situations, machines may become unavailable during certain periods due to preventive maintenance (PM). In this paper, a...

Full description

Saved in:
Bibliographic Details
Published inComputers & industrial engineering Vol. 59; no. 3; pp. 436 - 447
Main Authors Wang, Shijin, Yu, Jianbo
Format Journal Article
LanguageEnglish
Published New York Elsevier Ltd 01.10.2010
Pergamon Press Inc
Subjects
Online AccessGet full text
ISSN0360-8352
1879-0550
DOI10.1016/j.cie.2010.05.016

Cover

Abstract Most production scheduling problems, including the standard flexible job-shop scheduling problem (FJSP), assume that machines are continuously available. However, in most realistic situations, machines may become unavailable during certain periods due to preventive maintenance (PM). In this paper, a flexible job-shop scheduling problem with machine availability constraints is considered. Each machine is subject to preventive maintenance during the planning period and the starting times of maintenance activities are either flexible in a time window or fixed beforehand. Moreover, two cases of maintenance resource constraint are considered: sufficient maintenance resource available or only one maintenance resource available. To deal with this variant FJSP problem with maintenance activities, a filtered beam search (FBS) based heuristic algorithm is proposed. With a modified branching scheme, the machine availability constraint and maintenance resource constraint can be easily incorporated into the proposed algorithm. Simulation experiments are conducted on some representative problems. The results demonstrate that the proposed filtered beam search based heuristic algorithm is a viable and effective approach for the FJSP with maintenance activities.
AbstractList Most production scheduling problems, including the standard flexible job-shop scheduling problem (FJSP), assume that machines are continuously available. However, in most realistic situations, machines may become unavailable during certain periods due to preventive maintenance (PM). In this paper, a flexible job-shop scheduling problem with machine availability constraints is considered. Each machine is subject to preventive maintenance during the planning period and the starting times of maintenance activities are either flexible in a time window or fixed beforehand. Moreover, two cases of maintenance resource constraint are considered: sufficient maintenance resource available or only one maintenance resource available. To deal with this variant FJSP problem with maintenance activities, a filtered beam search (FBS) based heuristic algorithm is proposed. With a modified branching scheme, the machine availability constraint and maintenance resource constraint can be easily incorporated into the proposed algorithm. Simulation experiments are conducted on some representative problems. The results demonstrate that the proposed filtered beam search based heuristic algorithm is a viable and effective approach for the FJSP with maintenance activities.
Most production scheduling problems, including the standard flexible job-shop scheduling problem (FJSP), assume that machines are continuously available. However, in most realistic situations, machines may become unavailable during certain periods due to preventive maintenance (PM). In this paper, a flexible job-shop scheduling problem with machine availability constraints is considered. Each machine is subject to preventive maintenance during the planning period and the starting times of maintenance activities are either flexible in a time window or fixed beforehand. Moreover, two cases of maintenance resource constraint are considered: sufficient maintenance resource available or only one maintenance resource available. To deal with this variant FJSP problem with maintenance activities, a filtered beam search (FBS) based heuristic algorithm is proposed. With a modified branching scheme, the machine availability constraint and maintenance resource constraint can be easily incorporated into the proposed algorithm. Simulation experiments are conducted on some representative problems. The results demonstrate that the proposed filtered beam search based heuristic algorithm is a viable and effective approach for the FJSP with maintenance activities. [PUBLICATION ABSTRACT]
Author Wang, Shijin
Yu, Jianbo
Author_xml – sequence: 1
  givenname: Shijin
  surname: Wang
  fullname: Wang, Shijin
  email: shijinwang0223@yahoo.com.cn
  organization: Department of Management Science and Engineering, School of Economics & Management, Tongji University, Shanghai 200092, China
– sequence: 2
  givenname: Jianbo
  surname: Yu
  fullname: Yu, Jianbo
  organization: College of Mechatronics Engineering and Automation, Shanghai University, Shanghai 200072, China
BookMark eNp9kT2P1DAQhi10SOwd_AA6i4YqyziJY0dUpxNf0kk0UFFYjjNmJ8rai-0c8O_xaqmuuGo04-cZjV5fs6sQAzL2WsBegBjeLXtHuG-h9iD3dfKM7YRWYwNSwhXbQTdAozvZvmDXOS8A0MtR7NiP28DRe3SFHpAfcEuUCznuY-J-xT80rciXODX5EE88uwPO20rhJz-lWJ-O_DeVAz9aCgWDDQ65Pa-iQphfsuferhlf_a837PvHD9_uPjf3Xz99ubu9b1wnh9JY3Qk9-KG184BDN_WTbeWg_OzG0aEeWyE67B10WiEIr6BVdmx7PXmQQru-u2FvL3vrTb82zMUcKTtcVxswbtkoraDXvRSVfPOIXOKWQj3OqF4oMQqhKyQukEsx54TenBIdbfprBJhz2GYxNWxzDtuANHVSHfXIcVRsoRhKsrQ-ab6_mFgTeiBMJlekBjlTqr9i5khP2P8AnUabVw
CODEN CINDDL
CitedBy_id crossref_primary_10_1016_j_ijpe_2024_109163
crossref_primary_10_1080_00207543_2023_2294114
crossref_primary_10_1080_00207543_2013_784408
crossref_primary_10_1109_MCI_2015_2501552
crossref_primary_10_1007_s10845_023_02114_3
crossref_primary_10_1016_j_procir_2019_03_038
crossref_primary_10_1088_1742_6596_1325_1_012077
crossref_primary_10_3233_JIFS_220494
crossref_primary_10_1016_j_ijpe_2016_01_016
crossref_primary_10_1016_j_eswa_2022_119474
crossref_primary_10_1080_00207543_2018_1459923
crossref_primary_10_1080_0305215X_2021_1983558
crossref_primary_10_1080_00207543_2012_661089
crossref_primary_10_1016_j_eswa_2020_114495
crossref_primary_10_1016_j_ress_2021_108113
crossref_primary_10_1080_00207543_2020_1804639
crossref_primary_10_31796_ogummf_1247165
crossref_primary_10_1007_s00170_010_3140_2
crossref_primary_10_1007_s00170_013_5281_6
crossref_primary_10_1080_00207543_2017_1388933
crossref_primary_10_3390_su11010065
crossref_primary_10_1016_j_ress_2024_110447
crossref_primary_10_35378_gujs_1108155
crossref_primary_10_1016_j_asoc_2021_107312
crossref_primary_10_1142_S0218213023500410
crossref_primary_10_1080_00207543_2024_2347564
crossref_primary_10_1108_13552511211226193
crossref_primary_10_1080_0951192X_2013_834465
crossref_primary_10_1108_JQME_10_2020_0109
crossref_primary_10_1080_00207543_2018_1492752
crossref_primary_10_3182_20130619_3_RU_3018_00566
crossref_primary_10_1016_j_ifacol_2023_10_186
crossref_primary_10_1016_j_eswa_2021_115693
crossref_primary_10_1080_00207543_2015_1020174
crossref_primary_10_1016_j_ejor_2022_03_045
crossref_primary_10_1007_s12555_023_0578_1
crossref_primary_10_1007_s12652_023_04511_1
crossref_primary_10_1016_j_cor_2023_106365
crossref_primary_10_1016_j_swevo_2018_02_010
crossref_primary_10_1016_j_cie_2025_110861
crossref_primary_10_1016_j_ijpe_2012_04_015
crossref_primary_10_1016_j_ejor_2023_05_017
crossref_primary_10_1007_s43069_021_00098_5
crossref_primary_10_1016_j_ijpe_2012_11_005
crossref_primary_10_1016_j_knosys_2016_06_014
crossref_primary_10_1016_j_omega_2020_102325
crossref_primary_10_1016_j_cie_2014_03_003
crossref_primary_10_1080_00207543_2018_1444809
crossref_primary_10_4028_www_scientific_net_AMM_521_707
crossref_primary_10_1007_s10479_017_2594_0
crossref_primary_10_1016_j_asoc_2012_04_012
crossref_primary_10_1007_s00170_012_4344_4
crossref_primary_10_1016_j_ress_2012_01_005
crossref_primary_10_1111_itor_12199
crossref_primary_10_1016_j_cor_2022_105823
crossref_primary_10_1007_s12597_017_0298_5
crossref_primary_10_1002_asmb_2173
crossref_primary_10_1007_s12351_022_00733_x
crossref_primary_10_1142_S0219686718500269
crossref_primary_10_1016_j_jclepro_2020_121540
crossref_primary_10_1007_s00170_015_6795_x
crossref_primary_10_1016_j_cie_2011_12_013
crossref_primary_10_1007_s10732_021_09482_0
crossref_primary_10_1134_S0005117914070030
crossref_primary_10_1080_24725854_2022_2100523
crossref_primary_10_1016_j_eswa_2016_07_046
crossref_primary_10_1016_j_jmsy_2019_12_004
crossref_primary_10_3233_JIFS_191839
crossref_primary_10_1016_j_asoc_2020_106869
crossref_primary_10_1016_j_cie_2022_108786
crossref_primary_10_1016_j_cie_2016_10_019
crossref_primary_10_1016_j_rcim_2019_01_005
crossref_primary_10_1016_j_ress_2014_06_012
crossref_primary_10_1007_s00500_020_05347_z
crossref_primary_10_3390_pr9081391
crossref_primary_10_4028_www_scientific_net_AMM_575_922
crossref_primary_10_1049_iet_cim_2018_0009
crossref_primary_10_1016_j_eswa_2022_118711
crossref_primary_10_1016_j_asoc_2017_04_060
crossref_primary_10_1016_j_apm_2013_07_038
crossref_primary_10_4995_ijpme_2017_6618
crossref_primary_10_1016_j_future_2024_05_058
crossref_primary_10_1155_2015_725460
crossref_primary_10_4995_wpom_v11i2_14187
crossref_primary_10_1016_j_swevo_2023_101421
crossref_primary_10_1080_00207543_2011_648280
crossref_primary_10_17482_uumfd_856513
crossref_primary_10_1051_ro_2023187
crossref_primary_10_1057_jos_2015_20
crossref_primary_10_12677_MOS_2023_126534
crossref_primary_10_1007_s10845_020_01547_4
Cites_doi 10.1016/j.omega.2008.01.001
10.1007/s10845-005-0021-x
10.1007/s00170-008-1693-0
10.1016/j.ejor.2007.06.029
10.1016/j.compind.2004.06.005
10.1108/13552510510589361
10.1109/TR.2005.845967
10.1016/j.cor.2007.02.014
10.1016/j.cie.2009.04.014
10.1002/(SICI)1520-6750(200003)47:2<145::AID-NAV5>3.0.CO;2-3
10.1016/j.ejor.2003.08.034
10.1007/BF02023073
10.1016/j.ress.2005.11.062
10.1007/s10951-005-6812-2
10.1016/j.ejor.2008.03.043
10.1016/j.cie.2005.01.020
10.1016/S0377-2217(03)00261-3
10.1016/j.cor.2005.01.004
10.1016/j.cie.2005.01.018
10.1016/j.ejor.2006.11.027
10.1016/S0377-2217(98)00367-1
10.1080/00207540600988105
10.1007/s00170-006-0524-4
10.1016/j.cor.2007.01.001
10.1016/S0377-2217(01)00197-7
10.1016/j.rcim.2005.11.005
10.1002/(SICI)1520-6750(199910)46:7<845::AID-NAV6>3.0.CO;2-#
10.1007/s11590-006-0041-2
10.1016/j.dam.2004.12.003
10.1016/j.cor.2006.04.007
10.1016/j.ijpe.2007.01.014
10.1016/j.cor.2005.05.034
10.1080/00207548808947840
10.1287/opre.1060.0301
10.1016/j.cor.2005.12.007
10.1080/07408170304416
10.1016/S0377-2217(98)00319-1
10.1016/j.cie.2004.09.002
10.1109/TSMCC.2002.1009117
ContentType Journal Article
Copyright 2010 Elsevier Ltd
Copyright Pergamon Press Inc. Oct 2010
Copyright_xml – notice: 2010 Elsevier Ltd
– notice: Copyright Pergamon Press Inc. Oct 2010
DBID AAYXX
CITATION
7SC
8FD
JQ2
L7M
L~C
L~D
DOI 10.1016/j.cie.2010.05.016
DatabaseName CrossRef
Computer and Information Systems Abstracts
Technology Research Database
ProQuest Computer Science Collection
Advanced Technologies Database with Aerospace
Computer and Information Systems Abstracts – Academic
Computer and Information Systems Abstracts Professional
DatabaseTitle CrossRef
Computer and Information Systems Abstracts
Technology Research Database
Computer and Information Systems Abstracts – Academic
Advanced Technologies Database with Aerospace
ProQuest Computer Science Collection
Computer and Information Systems Abstracts Professional
DatabaseTitleList
Computer and Information Systems Abstracts
Computer and Information Systems Abstracts
DeliveryMethod fulltext_linktorsrc
Discipline Applied Sciences
Engineering
EISSN 1879-0550
EndPage 447
ExternalDocumentID 2106803271
10_1016_j_cie_2010_05_016
S0360835210001439
Genre Feature
GroupedDBID --K
--M
-~X
.DC
.~1
0R~
1B1
1RT
1~.
1~5
29F
4.4
457
4G.
5GY
5VS
7-5
71M
8P~
9JN
9JO
AAAKG
AABNK
AACTN
AAEDT
AAEDW
AAFWJ
AAIKC
AAIKJ
AAKOC
AALRI
AAMNW
AAOAW
AAQFI
AAQXK
AARIN
AATTM
AAXKI
AAXUO
ABAOU
ABDPE
ABJNI
ABMAC
ABUCO
ABWVN
ABXDB
ACDAQ
ACGFO
ACGFS
ACNCT
ACNNM
ACRLP
ACRPL
ADBBV
ADEZE
ADGUI
ADMUD
ADNMO
ADRHT
ADTZH
AEBSH
AECPX
AEIPS
AEKER
AENEX
AFJKZ
AFTJW
AGHFR
AGUBO
AGYEJ
AHHHB
AHJVU
AIEXJ
AIGVJ
AIKHN
AITUG
AKRWK
ALMA_UNASSIGNED_HOLDINGS
AMRAJ
ANKPU
APLSM
ARUGR
ASPBG
AVWKF
AXJTR
AZFZN
BJAXD
BKOJK
BKOMP
BLXMC
BNPGV
CS3
DU5
EBS
EFJIC
EJD
EO8
EO9
EP2
EP3
FDB
FEDTE
FGOYB
FIRID
FNPLU
FYGXN
G-2
G-Q
GBLVA
HAMUX
HLZ
HVGLF
HZ~
H~9
IHE
J1W
JJJVA
KOM
LX9
LY1
LY7
M41
MHUIS
MO0
MS~
N9A
O-L
O9-
OAUVE
OZT
P-8
P-9
P2P
PC.
PQQKQ
Q38
R2-
RIG
RNS
ROL
RPZ
RXW
SBC
SDF
SDG
SDP
SDS
SES
SET
SEW
SPC
SPCBC
SSB
SSD
SSH
SST
SSW
SSZ
T5K
TAE
TN5
WUQ
XPP
ZMT
~G-
AAYWO
AAYXX
ACLOT
ACVFH
ADCNI
AEUPX
AFPUW
AGQPQ
AIGII
AIIUN
AKBMS
AKYEP
APXCP
CITATION
EFKBS
EFLBG
~HD
7SC
8FD
AFXIZ
AGCQF
AGRNS
JQ2
L7M
L~C
L~D
ID FETCH-LOGICAL-c356t-a83186f62ad6e63b4ba2567fdc99ce892113e4c0387e01f7027a9248bf0518c43
IEDL.DBID AIKHN
ISSN 0360-8352
IngestDate Sun Sep 28 11:10:49 EDT 2025
Mon Jul 14 08:21:25 EDT 2025
Wed Oct 01 00:49:24 EDT 2025
Thu Apr 24 23:09:24 EDT 2025
Sun Apr 06 06:54:00 EDT 2025
IsPeerReviewed true
IsScholarly true
Issue 3
Keywords Flexible job-shop scheduling problem
Filtered beam search
Availability constraints
Preventive maintenance
Language English
License https://www.elsevier.com/tdm/userlicense/1.0
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c356t-a83186f62ad6e63b4ba2567fdc99ce892113e4c0387e01f7027a9248bf0518c43
Notes SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 14
ObjectType-Article-2
content type line 23
PQID 741719118
PQPubID 9545
PageCount 12
ParticipantIDs proquest_miscellaneous_787048451
proquest_journals_741719118
crossref_primary_10_1016_j_cie_2010_05_016
crossref_citationtrail_10_1016_j_cie_2010_05_016
elsevier_sciencedirect_doi_10_1016_j_cie_2010_05_016
ProviderPackageCode CITATION
AAYXX
PublicationCentury 2000
PublicationDate 2010-10-01
PublicationDateYYYYMMDD 2010-10-01
PublicationDate_xml – month: 10
  year: 2010
  text: 2010-10-01
  day: 01
PublicationDecade 2010
PublicationPlace New York
PublicationPlace_xml – name: New York
PublicationTitle Computers & industrial engineering
PublicationYear 2010
Publisher Elsevier Ltd
Pergamon Press Inc
Publisher_xml – name: Elsevier Ltd
– name: Pergamon Press Inc
References Kubzin, Strusevich (bib18) 2006; 54
Sortrakul, Nachtmann, Cassady (bib35) 2005; 56
(pp. 89–94).
Zribi, Kamel, Borne (bib41) 2008; 112
Lin, Liao (bib23) 2007; 33
Cassady, Kutanoglu (bib6) 2005; 54
Cassady, Kutanoglu (bib5) 2003; 35
Chen (bib9) 2009; 37
Valente, Alves (bib36) 2005; 48
Mohanta, Sadhu, Chakrabarti (bib27) 2007; 92
Brandimarte (bib3) 1993; 41
Pezzella, Morganti, Ciaschetti (bib31) 2008; 35
Sabuncuoglu, Bayiz (bib33) 1999; 118
Ow, Morton (bib30) 1988; 26
Breit (bib4) 2006; 33
Schmidt (bib34) 2000; 121
Gharbi, Haouari (bib13) 2005; 148
Najib, N.M., Dauzere-Peres, S., & Zaidat, A. (2002). A modified simulated annealing method for flexible job shop scheduling problem. In
Wang (bib37) 2002; 139
Aggoune (bib1) 2004; 153
Liao, Sheen (bib22) 2008; 184
Lee, Chen (bib19) 2000; 47
Xia, Wu (bib39) 2005; 48
Gao, Sun, Gen (bib12) 2008; 35
Naderi, Zandieh, Ghomi (bib28) 2009; 43
Chen (bib8) 2008; 190
Ji, He, Cheng (bib15) 2007; 34
Gao, Gen, Sun (bib11) 2006; 17
Liao, Shyur, Lin (bib21) 2005; 160
Mauguiere, Billaut, Bouquard (bib25) 2005; 8
Yang, Hsu, Kuo (bib40) 2008; 35
Ruiz, Garcia-Diaz, Maroto (bib32) 2007; 34
Mellouli, Sadfi, Chu, Kacem (bib26) 2009; 197
Wang, Zhou, Xi (bib38) 2008; 46
Chan, Chung, Chan, Finke, Tiwari (bib7) 2006; 22
Graves, Lee (bib14) 1999; 46
Lee, Yu (bib20) 2008; 2
Allaoui, Artiba (bib2) 2004; 47
Chen, Liao (bib10) 2005; 11
Kacem, Hammadi, Borne (bib17) 2002; 60
Ma, Chu, Zuo (bib24) 2010; 58
Kacem, Hammadi, Borne (bib16) 2002; 32
Kubzin (10.1016/j.cie.2010.05.016_bib18) 2006; 54
Zribi (10.1016/j.cie.2010.05.016_bib41) 2008; 112
Allaoui (10.1016/j.cie.2010.05.016_bib2) 2004; 47
Gharbi (10.1016/j.cie.2010.05.016_bib13) 2005; 148
Schmidt (10.1016/j.cie.2010.05.016_bib34) 2000; 121
Mohanta (10.1016/j.cie.2010.05.016_bib27) 2007; 92
Ruiz (10.1016/j.cie.2010.05.016_bib32) 2007; 34
Lee (10.1016/j.cie.2010.05.016_bib20) 2008; 2
Sabuncuoglu (10.1016/j.cie.2010.05.016_bib33) 1999; 118
Ji (10.1016/j.cie.2010.05.016_bib15) 2007; 34
Liao (10.1016/j.cie.2010.05.016_bib21) 2005; 160
Lee (10.1016/j.cie.2010.05.016_bib19) 2000; 47
Sortrakul (10.1016/j.cie.2010.05.016_bib35) 2005; 56
Ow (10.1016/j.cie.2010.05.016_bib30) 1988; 26
Yang (10.1016/j.cie.2010.05.016_bib40) 2008; 35
Chen (10.1016/j.cie.2010.05.016_bib10) 2005; 11
Chan (10.1016/j.cie.2010.05.016_bib7) 2006; 22
Wang (10.1016/j.cie.2010.05.016_bib38) 2008; 46
10.1016/j.cie.2010.05.016_bib29
Cassady (10.1016/j.cie.2010.05.016_bib5) 2003; 35
Kacem (10.1016/j.cie.2010.05.016_bib16) 2002; 32
Wang (10.1016/j.cie.2010.05.016_bib37) 2002; 139
Cassady (10.1016/j.cie.2010.05.016_bib6) 2005; 54
Kacem (10.1016/j.cie.2010.05.016_bib17) 2002; 60
Valente (10.1016/j.cie.2010.05.016_bib36) 2005; 48
Chen (10.1016/j.cie.2010.05.016_bib8) 2008; 190
Chen (10.1016/j.cie.2010.05.016_bib9) 2009; 37
Lin (10.1016/j.cie.2010.05.016_bib23) 2007; 33
Mauguiere (10.1016/j.cie.2010.05.016_bib25) 2005; 8
Naderi (10.1016/j.cie.2010.05.016_bib28) 2009; 43
Ma (10.1016/j.cie.2010.05.016_bib24) 2010; 58
Xia (10.1016/j.cie.2010.05.016_bib39) 2005; 48
Brandimarte (10.1016/j.cie.2010.05.016_bib3) 1993; 41
Breit (10.1016/j.cie.2010.05.016_bib4) 2006; 33
Gao (10.1016/j.cie.2010.05.016_bib11) 2006; 17
Gao (10.1016/j.cie.2010.05.016_bib12) 2008; 35
Pezzella (10.1016/j.cie.2010.05.016_bib31) 2008; 35
Aggoune (10.1016/j.cie.2010.05.016_bib1) 2004; 153
Graves (10.1016/j.cie.2010.05.016_bib14) 1999; 46
Liao (10.1016/j.cie.2010.05.016_bib22) 2008; 184
Mellouli (10.1016/j.cie.2010.05.016_bib26) 2009; 197
References_xml – volume: 160
  start-page: 445
  year: 2005
  end-page: 456
  ident: bib21
  article-title: Makespan minimization for two parallel machines with an availability constraint
  publication-title: European Journal of Operational Research
– volume: 33
  start-page: 1024
  year: 2007
  end-page: 1030
  ident: bib23
  article-title: Makespan minimization for two parallel machines with an unavailable period on each machine
  publication-title: International Journal of Advanced Manufacturing Technology
– volume: 184
  start-page: 458
  year: 2008
  end-page: 467
  ident: bib22
  article-title: Parallel machine scheduling with machine availability and eligibility constraints
  publication-title: European Journal of Operational Research
– volume: 11
  start-page: 43
  year: 2005
  end-page: 52
  ident: bib10
  article-title: Scheduling with different maintenance policies in a textile company
  publication-title: Journal of Quality in Maintenance Engineering
– volume: 34
  start-page: 3314
  year: 2007
  end-page: 3330
  ident: bib32
  article-title: Considering scheduling and preventive maintenance in the flowshop sequencing problem
  publication-title: Computers & Operations Research
– volume: 37
  start-page: 591
  year: 2009
  end-page: 599
  ident: bib9
  article-title: Minimizing number of tardy jobs on a single machine subject to periodic maintenance
  publication-title: Omega
– volume: 43
  start-page: 170
  year: 2009
  end-page: 181
  ident: bib28
  article-title: Scheduling sequence-dependent set-up time job shops with preventive maintenance
  publication-title: International Journal of Advanced Manufacturing Technology
– volume: 34
  start-page: 1764
  year: 2007
  end-page: 1770
  ident: bib15
  article-title: Single-machine scheduling with periodic maintenance to minimize makespan
  publication-title: Computers & Operations Research
– volume: 190
  start-page: 90
  year: 2008
  end-page: 102
  ident: bib8
  article-title: Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
  publication-title: European Journal of Operational Research
– volume: 35
  start-page: 867
  year: 2008
  end-page: 883
  ident: bib40
  article-title: A two-machine flowshop scheduling problem with a separated maintenance constraint
  publication-title: Computers & Operations Research
– volume: 33
  start-page: 2143
  year: 2006
  end-page: 2153
  ident: bib4
  article-title: A polynomial-time approximation scheme for the two-machine flow shop scheduling problem with an availability constraint
  publication-title: Computers & Operations Research
– volume: 60
  start-page: 245
  year: 2002
  end-page: 276
  ident: bib17
  publication-title: Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic
– volume: 54
  start-page: 789
  year: 2006
  end-page: 800
  ident: bib18
  article-title: Planning machine maintenance in two-machine shop scheduling
  publication-title: Operations Research
– volume: 22
  start-page: 493
  year: 2006
  end-page: 504
  ident: bib7
  article-title: Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach
  publication-title: Robotics and Computer-Integrated Manufacturing
– volume: 46
  start-page: 845
  year: 1999
  end-page: 863
  ident: bib14
  article-title: Scheduling maintenance and semiresumable jobs on a single machine
  publication-title: Naval Research Logistics
– reference: (pp. 89–94).
– volume: 26
  start-page: 35
  year: 1988
  end-page: 62
  ident: bib30
  article-title: Filtered beam search in scheduling
  publication-title: International Journal of Production Research
– volume: 35
  start-page: 3202
  year: 2008
  end-page: 3212
  ident: bib31
  article-title: A genetic algorithm for the flexible job-shop scheduling problem
  publication-title: Computers & Operations Research
– volume: 46
  start-page: 3027
  year: 2008
  end-page: 3058
  ident: bib38
  article-title: A filtered-beam-search-based algorithm for flexible job-shop scheduling problem
  publication-title: International Journal of Production Research
– volume: 112
  start-page: 151
  year: 2008
  end-page: 160
  ident: bib41
  article-title: Minimizing the makespan for the MPM job-shop with availability constraints
  publication-title: International Journal of Production Economics
– volume: 47
  start-page: 145
  year: 2000
  end-page: 165
  ident: bib19
  article-title: Scheduling jobs and maintenance activities on parallel machines
  publication-title: Naval Research Logistics
– volume: 35
  start-page: 2892
  year: 2008
  end-page: 2907
  ident: bib12
  article-title: A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems
  publication-title: Computers & Operations Research
– volume: 58
  start-page: 199
  year: 2010
  end-page: 211
  ident: bib24
  article-title: A survey of scheduling with deterministic machine availability constraints
  publication-title: Computer & Industrial Engineering
– volume: 197
  start-page: 1150
  year: 2009
  end-page: 1165
  ident: bib26
  article-title: Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times
  publication-title: European Journal of Operational Research
– volume: 153
  start-page: 534
  year: 2004
  end-page: 543
  ident: bib1
  article-title: Minimizing the makespan for the flow shop scheduling problem with availability constraints
  publication-title: European Journal of Operational Research
– volume: 47
  start-page: 431
  year: 2004
  end-page: 450
  ident: bib2
  article-title: simulation and optimization to schedule a hybrid flow shop with maintenance constraints
  publication-title: Computers & Industrial Engineering
– volume: 41
  start-page: 157
  year: 1993
  end-page: 183
  ident: bib3
  article-title: Routing and scheduling in a flexible job shop by tabu search
  publication-title: Annals of Operations Research
– volume: 17
  start-page: 493
  year: 2006
  end-page: 507
  ident: bib11
  article-title: Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm
  publication-title: Journal of Intelligent Manufacturing
– volume: 32
  start-page: 1
  year: 2002
  end-page: 13
  ident: bib16
  article-title: Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
  publication-title: IEEE Transactions on Systems, Man, and Cybernetics, Part C
– volume: 48
  start-page: 363
  year: 2005
  end-page: 375
  ident: bib36
  article-title: Filtered and recovering beam search algorithms for the early/tardy scheduling problem with no idle time
  publication-title: Computers & Industrial Engineering
– volume: 121
  start-page: 1
  year: 2000
  end-page: 15
  ident: bib34
  article-title: Scheduling with limited machine availability
  publication-title: European Journal of Operational Research
– volume: 35
  start-page: 503
  year: 2003
  end-page: 513
  ident: bib5
  article-title: Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
  publication-title: IIE Transactions
– volume: 8
  start-page: 211
  year: 2005
  end-page: 231
  ident: bib25
  article-title: New single machine and job-shop scheduling problems with availability constraints
  publication-title: Journal of Scheduling
– volume: 2
  start-page: 27
  year: 2008
  end-page: 37
  ident: bib20
  article-title: Parallel-machine scheduling under potential disruption
  publication-title: Optimization Letters
– volume: 56
  start-page: 161
  year: 2005
  end-page: 168
  ident: bib35
  article-title: Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine
  publication-title: Computers in Industry
– volume: 48
  start-page: 409
  year: 2005
  end-page: 425
  ident: bib39
  article-title: An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems
  publication-title: Computers & Industrial Engineering
– volume: 148
  start-page: 63
  year: 2005
  end-page: 87
  ident: bib13
  article-title: Optimal parallel machines scheduling with availability constraints
  publication-title: Discrete Applied Mathematics
– reference: Najib, N.M., Dauzere-Peres, S., & Zaidat, A. (2002). A modified simulated annealing method for flexible job shop scheduling problem. In
– volume: 92
  start-page: 187
  year: 2007
  end-page: 199
  ident: bib27
  article-title: Deterministic and stochastic approach for safety and reliability optimization of captive power plant maintenance scheduling using GA/SA-based hybrid techniques: A comparison of results
  publication-title: Reliability Engineering and System Safety
– volume: 54
  start-page: 304
  year: 2005
  end-page: 309
  ident: bib6
  article-title: Integrating preventive maintenance planning and production scheduling for a single machine
  publication-title: IEEE Transactions on Reliability
– volume: 118
  start-page: 390
  year: 1999
  end-page: 412
  ident: bib33
  article-title: Job shop scheduling with beam search
  publication-title: European Journal of Operational Research
– volume: 139
  start-page: 469
  year: 2002
  end-page: 489
  ident: bib37
  article-title: A survey of maintenance policies of deteriorating systems
  publication-title: European Journal of Operational Research
– volume: 37
  start-page: 591
  issue: 3
  year: 2009
  ident: 10.1016/j.cie.2010.05.016_bib9
  article-title: Minimizing number of tardy jobs on a single machine subject to periodic maintenance
  publication-title: Omega
  doi: 10.1016/j.omega.2008.01.001
– volume: 17
  start-page: 493
  issue: 4
  year: 2006
  ident: 10.1016/j.cie.2010.05.016_bib11
  article-title: Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm
  publication-title: Journal of Intelligent Manufacturing
  doi: 10.1007/s10845-005-0021-x
– volume: 43
  start-page: 170
  issue: 1–2
  year: 2009
  ident: 10.1016/j.cie.2010.05.016_bib28
  article-title: Scheduling sequence-dependent set-up time job shops with preventive maintenance
  publication-title: International Journal of Advanced Manufacturing Technology
  doi: 10.1007/s00170-008-1693-0
– volume: 190
  start-page: 90
  issue: 1
  year: 2008
  ident: 10.1016/j.cie.2010.05.016_bib8
  article-title: Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2007.06.029
– volume: 56
  start-page: 161
  issue: 2
  year: 2005
  ident: 10.1016/j.cie.2010.05.016_bib35
  article-title: Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine
  publication-title: Computers in Industry
  doi: 10.1016/j.compind.2004.06.005
– volume: 11
  start-page: 43
  issue: 1
  year: 2005
  ident: 10.1016/j.cie.2010.05.016_bib10
  article-title: Scheduling with different maintenance policies in a textile company
  publication-title: Journal of Quality in Maintenance Engineering
  doi: 10.1108/13552510510589361
– volume: 54
  start-page: 304
  issue: 2
  year: 2005
  ident: 10.1016/j.cie.2010.05.016_bib6
  article-title: Integrating preventive maintenance planning and production scheduling for a single machine
  publication-title: IEEE Transactions on Reliability
  doi: 10.1109/TR.2005.845967
– volume: 35
  start-page: 3202
  issue: 10
  year: 2008
  ident: 10.1016/j.cie.2010.05.016_bib31
  article-title: A genetic algorithm for the flexible job-shop scheduling problem
  publication-title: Computers & Operations Research
  doi: 10.1016/j.cor.2007.02.014
– volume: 58
  start-page: 199
  issue: 2
  year: 2010
  ident: 10.1016/j.cie.2010.05.016_bib24
  article-title: A survey of scheduling with deterministic machine availability constraints
  publication-title: Computer & Industrial Engineering
  doi: 10.1016/j.cie.2009.04.014
– volume: 47
  start-page: 145
  issue: 2
  year: 2000
  ident: 10.1016/j.cie.2010.05.016_bib19
  article-title: Scheduling jobs and maintenance activities on parallel machines
  publication-title: Naval Research Logistics
  doi: 10.1002/(SICI)1520-6750(200003)47:2<145::AID-NAV5>3.0.CO;2-3
– volume: 160
  start-page: 445
  issue: 2
  year: 2005
  ident: 10.1016/j.cie.2010.05.016_bib21
  article-title: Makespan minimization for two parallel machines with an availability constraint
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2003.08.034
– volume: 41
  start-page: 157
  issue: 1-4
  year: 1993
  ident: 10.1016/j.cie.2010.05.016_bib3
  article-title: Routing and scheduling in a flexible job shop by tabu search
  publication-title: Annals of Operations Research
  doi: 10.1007/BF02023073
– volume: 92
  start-page: 187
  issue: 2
  year: 2007
  ident: 10.1016/j.cie.2010.05.016_bib27
  article-title: Deterministic and stochastic approach for safety and reliability optimization of captive power plant maintenance scheduling using GA/SA-based hybrid techniques: A comparison of results
  publication-title: Reliability Engineering and System Safety
  doi: 10.1016/j.ress.2005.11.062
– volume: 8
  start-page: 211
  issue: 3
  year: 2005
  ident: 10.1016/j.cie.2010.05.016_bib25
  article-title: New single machine and job-shop scheduling problems with availability constraints
  publication-title: Journal of Scheduling
  doi: 10.1007/s10951-005-6812-2
– volume: 197
  start-page: 1150
  issue: 3
  year: 2009
  ident: 10.1016/j.cie.2010.05.016_bib26
  article-title: Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2008.03.043
– volume: 48
  start-page: 363
  issue: 2
  year: 2005
  ident: 10.1016/j.cie.2010.05.016_bib36
  article-title: Filtered and recovering beam search algorithms for the early/tardy scheduling problem with no idle time
  publication-title: Computers & Industrial Engineering
  doi: 10.1016/j.cie.2005.01.020
– volume: 153
  start-page: 534
  issue: 3
  year: 2004
  ident: 10.1016/j.cie.2010.05.016_bib1
  article-title: Minimizing the makespan for the flow shop scheduling problem with availability constraints
  publication-title: European Journal of Operational Research
  doi: 10.1016/S0377-2217(03)00261-3
– volume: 33
  start-page: 2143
  issue: 8
  year: 2006
  ident: 10.1016/j.cie.2010.05.016_bib4
  article-title: A polynomial-time approximation scheme for the two-machine flow shop scheduling problem with an availability constraint
  publication-title: Computers & Operations Research
  doi: 10.1016/j.cor.2005.01.004
– volume: 48
  start-page: 409
  issue: 2
  year: 2005
  ident: 10.1016/j.cie.2010.05.016_bib39
  article-title: An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems
  publication-title: Computers & Industrial Engineering
  doi: 10.1016/j.cie.2005.01.018
– volume: 184
  start-page: 458
  issue: 2
  year: 2008
  ident: 10.1016/j.cie.2010.05.016_bib22
  article-title: Parallel machine scheduling with machine availability and eligibility constraints
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2006.11.027
– volume: 121
  start-page: 1
  issue: 1
  year: 2000
  ident: 10.1016/j.cie.2010.05.016_bib34
  article-title: Scheduling with limited machine availability
  publication-title: European Journal of Operational Research
  doi: 10.1016/S0377-2217(98)00367-1
– volume: 46
  start-page: 3027
  issue: 11
  year: 2008
  ident: 10.1016/j.cie.2010.05.016_bib38
  article-title: A filtered-beam-search-based algorithm for flexible job-shop scheduling problem
  publication-title: International Journal of Production Research
  doi: 10.1080/00207540600988105
– volume: 33
  start-page: 1024
  issue: 9-10
  year: 2007
  ident: 10.1016/j.cie.2010.05.016_bib23
  article-title: Makespan minimization for two parallel machines with an unavailable period on each machine
  publication-title: International Journal of Advanced Manufacturing Technology
  doi: 10.1007/s00170-006-0524-4
– volume: 35
  start-page: 2892
  issue: 9
  year: 2008
  ident: 10.1016/j.cie.2010.05.016_bib12
  article-title: A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems
  publication-title: Computers & Operations Research
  doi: 10.1016/j.cor.2007.01.001
– volume: 139
  start-page: 469
  year: 2002
  ident: 10.1016/j.cie.2010.05.016_bib37
  article-title: A survey of maintenance policies of deteriorating systems
  publication-title: European Journal of Operational Research
  doi: 10.1016/S0377-2217(01)00197-7
– volume: 22
  start-page: 493
  issue: 5-6
  year: 2006
  ident: 10.1016/j.cie.2010.05.016_bib7
  article-title: Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach
  publication-title: Robotics and Computer-Integrated Manufacturing
  doi: 10.1016/j.rcim.2005.11.005
– volume: 46
  start-page: 845
  issue: 7
  year: 1999
  ident: 10.1016/j.cie.2010.05.016_bib14
  article-title: Scheduling maintenance and semiresumable jobs on a single machine
  publication-title: Naval Research Logistics
  doi: 10.1002/(SICI)1520-6750(199910)46:7<845::AID-NAV6>3.0.CO;2-#
– volume: 2
  start-page: 27
  issue: 1
  year: 2008
  ident: 10.1016/j.cie.2010.05.016_bib20
  article-title: Parallel-machine scheduling under potential disruption
  publication-title: Optimization Letters
  doi: 10.1007/s11590-006-0041-2
– volume: 148
  start-page: 63
  issue: 1
  year: 2005
  ident: 10.1016/j.cie.2010.05.016_bib13
  article-title: Optimal parallel machines scheduling with availability constraints
  publication-title: Discrete Applied Mathematics
  doi: 10.1016/j.dam.2004.12.003
– volume: 35
  start-page: 867
  issue: 3
  year: 2008
  ident: 10.1016/j.cie.2010.05.016_bib40
  article-title: A two-machine flowshop scheduling problem with a separated maintenance constraint
  publication-title: Computers & Operations Research
  doi: 10.1016/j.cor.2006.04.007
– volume: 112
  start-page: 151
  issue: 1
  year: 2008
  ident: 10.1016/j.cie.2010.05.016_bib41
  article-title: Minimizing the makespan for the MPM job-shop with availability constraints
  publication-title: International Journal of Production Economics
  doi: 10.1016/j.ijpe.2007.01.014
– volume: 34
  start-page: 1764
  issue: 6
  year: 2007
  ident: 10.1016/j.cie.2010.05.016_bib15
  article-title: Single-machine scheduling with periodic maintenance to minimize makespan
  publication-title: Computers & Operations Research
  doi: 10.1016/j.cor.2005.05.034
– volume: 26
  start-page: 35
  issue: 1
  year: 1988
  ident: 10.1016/j.cie.2010.05.016_bib30
  article-title: Filtered beam search in scheduling
  publication-title: International Journal of Production Research
  doi: 10.1080/00207548808947840
– volume: 54
  start-page: 789
  issue: 4
  year: 2006
  ident: 10.1016/j.cie.2010.05.016_bib18
  article-title: Planning machine maintenance in two-machine shop scheduling
  publication-title: Operations Research
  doi: 10.1287/opre.1060.0301
– ident: 10.1016/j.cie.2010.05.016_bib29
– volume: 34
  start-page: 3314
  issue: 11
  year: 2007
  ident: 10.1016/j.cie.2010.05.016_bib32
  article-title: Considering scheduling and preventive maintenance in the flowshop sequencing problem
  publication-title: Computers & Operations Research
  doi: 10.1016/j.cor.2005.12.007
– volume: 35
  start-page: 503
  issue: 6
  year: 2003
  ident: 10.1016/j.cie.2010.05.016_bib5
  article-title: Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
  publication-title: IIE Transactions
  doi: 10.1080/07408170304416
– volume: 60
  start-page: 245
  issue: 3–5
  year: 2002
  ident: 10.1016/j.cie.2010.05.016_bib17
  publication-title: Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic
– volume: 118
  start-page: 390
  issue: 2
  year: 1999
  ident: 10.1016/j.cie.2010.05.016_bib33
  article-title: Job shop scheduling with beam search
  publication-title: European Journal of Operational Research
  doi: 10.1016/S0377-2217(98)00319-1
– volume: 47
  start-page: 431
  issue: 4
  year: 2004
  ident: 10.1016/j.cie.2010.05.016_bib2
  article-title: simulation and optimization to schedule a hybrid flow shop with maintenance constraints
  publication-title: Computers & Industrial Engineering
  doi: 10.1016/j.cie.2004.09.002
– volume: 32
  start-page: 1
  issue: 1
  year: 2002
  ident: 10.1016/j.cie.2010.05.016_bib16
  article-title: Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
  publication-title: IEEE Transactions on Systems, Man, and Cybernetics, Part C
  doi: 10.1109/TSMCC.2002.1009117
SSID ssj0004591
Score 2.3089502
Snippet Most production scheduling problems, including the standard flexible job-shop scheduling problem (FJSP), assume that machines are continuously available....
SourceID proquest
crossref
elsevier
SourceType Aggregation Database
Enrichment Source
Index Database
Publisher
StartPage 436
SubjectTerms Algorithms
Availability
Availability constraints
Beams (structural)
Computer simulation
Filtered beam search
Flexible job-shop scheduling problem
Heuristic
Heuristic methods
Job shops
Machinery
Maintenance
Preventive maintenance
Production scheduling
Scheduling
Searching
Simulation
Studies
Windows (intervals)
Title An effective heuristic for flexible job-shop scheduling problem with maintenance activities
URI https://dx.doi.org/10.1016/j.cie.2010.05.016
https://www.proquest.com/docview/741719118
https://www.proquest.com/docview/787048451
Volume 59
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVESC
  databaseName: ScienceDirect (Elsevier)
  customDbUrl:
  eissn: 1879-0550
  dateEnd: 99991231
  omitProxy: true
  ssIdentifier: ssj0004591
  issn: 0360-8352
  databaseCode: .~1
  dateStart: 19950101
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
– providerCode: PRVESC
  databaseName: ScienceDirect Complete Freedom Collection (Elsevier)
  customDbUrl:
  eissn: 1879-0550
  dateEnd: 99991231
  omitProxy: true
  ssIdentifier: ssj0004591
  issn: 0360-8352
  databaseCode: ACRLP
  dateStart: 19950101
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
– providerCode: PRVESC
  databaseName: ScienceDirect Freedom Collection Journals
  customDbUrl:
  eissn: 1879-0550
  dateEnd: 99991231
  omitProxy: true
  ssIdentifier: ssj0004591
  issn: 0360-8352
  databaseCode: AIKHN
  dateStart: 19950101
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
– providerCode: PRVLSH
  databaseName: Elsevier Journals
  customDbUrl:
  mediaType: online
  eissn: 1879-0550
  dateEnd: 99991231
  omitProxy: true
  ssIdentifier: ssj0004591
  issn: 0360-8352
  databaseCode: AKRWK
  dateStart: 19770101
  isFulltext: true
  providerName: Library Specific Holdings
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV07T8MwED5BWWDgjSgveWBCMk1qx3XGCoEKCBZAQmKw7NgRoJJWtGXkt3N2HARIMLA6dhLZvrvv7LvvAA4zw7R1paVWdC3lTHNqelpTaw1DhJ-wbsiQu7oWgzt-cZ_dz8FJkwvjwyqj7q91etDWsaUTZ7Mzfnrq3KDuDfghDTif5fOwgPZHyhYs9M8vB9dfSMPrwnnYn_oBzeVmCPPCN8cAL8_fKX4zTz8UdbA-Z6uwHGEj6dd_tgZzrlqHlQghSRTQyTosfeEX3ICHfkXqgA3UaeTRzWpaZoJAlZSeCdMMHXkeGTp5HI0J-rlod3x6OollZog_pSUv2nNKeGIOR3waxFsgYd2Eu7PT25MBjdUUaMEyMaVaoviKUnS1FU4ww41GuNMrbZHnhZM5eoLM8cJfZ7skLXvor2p0zqQpUW5lwdkWtKpR5baBCFloz-OXuLLLmcjyIrclLiqiM-uMEG1ImklURaQa9xUvhqqJKXvGdqf8vKskU9jShqPPIeOaZ-OvzrxZGfVtsyi0A38N221WUUVJnShEVD30WVPZBvL5FEXM35voyo1m2AV1Gpc8S3f-991dWAwxByEEcA9a09eZ20coMzUHMH_8nh7EDfsBRW3yKA
linkProvider Elsevier
linkToHtml http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV07T8QwDLZ4DMDAG3E8MzAhhWubNG1HhEDHcwEkJIYoaVIBgt6Ju2Pkt-OkKQIkGFhTp62S2v7c2J8B9lLNlLGVoUYkhnKmONWZUtQYzRDhRyzxFXKXV6J3y8_u0rsJOGprYVxaZbD9jU331jqMdMNqdgePj91rtL0eP8Qe57NiEqZ5mmQuAjt4j79Qhjdt81CaOvH2aNMneeF9Q3qXY-8UvzmnH2ba-56TRZgPoJEcNu-1BBO2XoaFACBJUM_hMsx9YRdcgfvDmjTpGmjRyIMdN6TMBGEqqRwPpn625Kmv6fChPyAY5aLXccXpJDSZIe4fLXlRjlHC0XJY4oog3jwF6yrcnhzfHPVo6KVAS5aKEVU5Kq-oRKKMsIJprhWCnawyZVGUNi8wDmSWl-4w20ZxlWG0qjA0y3WFWpuXnK3BVN2v7ToQkZfKsfhFtko4E2lRFqbCLUVsZqwWogNRu4iyDETjrt_Fs2wzyp5w3Eq37jJKJY50YP9zyqBh2fhLmLc7I799KhK9wF_TNttdlEFPhxLxVIYRa5x3gHxeRQVzpyaqtv0xiqBF4zlP443_PXcXZno3lxfy4vTqfBNmffaBTwbcgqnR69huI6gZ6R3_0X4AR13y8A
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=An+effective+heuristic+for+flexible+job-shop+scheduling+problem+with+maintenance+activities&rft.jtitle=Computers+%26+industrial+engineering&rft.au=Wang%2C+Shijin&rft.au=Yu%2C+Jianbo&rft.date=2010-10-01&rft.pub=Pergamon+Press+Inc&rft.issn=0360-8352&rft.eissn=1879-0550&rft.volume=59&rft.issue=3&rft.spage=436&rft_id=info:doi/10.1016%2Fj.cie.2010.05.016&rft.externalDBID=NO_FULL_TEXT&rft.externalDocID=2106803271
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0360-8352&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0360-8352&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0360-8352&client=summon