Shim, S. W., Lee, D. H., Roh, J. H., & Park, J. (2023). A Machine Learning-Based Algorithm for Short-Term SMP Forecasting Using 2-Step Method. Journal of electrical engineering & technology, 18(3), 1493-1501. https://doi.org/10.1007/s42835-023-01473-4
Chicago Style (17th ed.) CitationShim, Sang Woo, Da Han Lee, Jae Hyung Roh, and Jong-Bae Park. "A Machine Learning-Based Algorithm for Short-Term SMP Forecasting Using 2-Step Method." Journal of Electrical Engineering & Technology 18, no. 3 (2023): 1493-1501. https://doi.org/10.1007/s42835-023-01473-4.
MLA (9th ed.) CitationShim, Sang Woo, et al. "A Machine Learning-Based Algorithm for Short-Term SMP Forecasting Using 2-Step Method." Journal of Electrical Engineering & Technology, vol. 18, no. 3, 2023, pp. 1493-1501, https://doi.org/10.1007/s42835-023-01473-4.