APA (7th ed.) Citation

Nasiri, S., & Lu, M. (2022). Streamlined project time-cost tradeoff optimization methodology: Algorithm, automation, and application. Automation in construction, 133, 104002. https://doi.org/10.1016/j.autcon.2021.104002

Chicago Style (17th ed.) Citation

Nasiri, Sasan, and Ming Lu. "Streamlined Project Time-cost Tradeoff Optimization Methodology: Algorithm, Automation, and Application." Automation in Construction 133 (2022): 104002. https://doi.org/10.1016/j.autcon.2021.104002.

MLA (9th ed.) Citation

Nasiri, Sasan, and Ming Lu. "Streamlined Project Time-cost Tradeoff Optimization Methodology: Algorithm, Automation, and Application." Automation in Construction, vol. 133, 2022, p. 104002, https://doi.org/10.1016/j.autcon.2021.104002.

Warning: These citations may not always be 100% accurate.