Solving the fuzzy earliness and tardiness in scheduling problems by using genetic algorithms

The scheduling problems with fuzzy processing times and fuzzy due dates are concerned in this paper. The fuzzy earliness and fuzzy tardiness are proposed based on the concepts of subtraction and maximum of any two fuzzy numbers, which are defined by using the well-known “Extension Principle” in fuzz...

Full description

Saved in:
Bibliographic Details
Published inExpert systems with applications Vol. 37; no. 7; pp. 4860 - 4866
Main Author Wu, Hsien-Chung
Format Journal Article
LanguageEnglish
Published Elsevier Ltd 01.07.2010
Subjects
Online AccessGet full text
ISSN0957-4174
1873-6793
DOI10.1016/j.eswa.2009.12.029

Cover

Abstract The scheduling problems with fuzzy processing times and fuzzy due dates are concerned in this paper. The fuzzy earliness and fuzzy tardiness are proposed based on the concepts of subtraction and maximum of any two fuzzy numbers, which are defined by using the well-known “Extension Principle” in fuzzy sets theory. The objective function is taken as the weighted sum of fuzzy earliness and fuzzy tardiness through the concept of addition among fuzzy numbers. In this case, the objective function turns into a fuzzy-valued function. The purpose of this paper is to obtain an optimal schedule that minimizes this fuzzy-valued objective function. The genetic algorithm will be invoked to solve this problem. Two numerical examples are also provided to clarify the discussions in this paper by using the commercial software MATLAB.
AbstractList The scheduling problems with fuzzy processing times and fuzzy due dates are concerned in this paper. The fuzzy earliness and fuzzy tardiness are proposed based on the concepts of subtraction and maximum of any two fuzzy numbers, which are defined by using the well-known “Extension Principle” in fuzzy sets theory. The objective function is taken as the weighted sum of fuzzy earliness and fuzzy tardiness through the concept of addition among fuzzy numbers. In this case, the objective function turns into a fuzzy-valued function. The purpose of this paper is to obtain an optimal schedule that minimizes this fuzzy-valued objective function. The genetic algorithm will be invoked to solve this problem. Two numerical examples are also provided to clarify the discussions in this paper by using the commercial software MATLAB.
Author Wu, Hsien-Chung
Author_xml – sequence: 1
  givenname: Hsien-Chung
  surname: Wu
  fullname: Wu, Hsien-Chung
  email: hcwu@nknucc.nknu.edu.tw
  organization: Department of Mathematics, National Kaohsiung Normal University, Kaohsiung 802, Taiwan
BookMark eNp9kMFu2zAMhoUiBZamfYGddNvJHinZkQ30MgRbN6DADltvBQRZphMFitxJcofk6RsjO-3QE0Hi_wjyu2GLMAZi7CNCiYDrz_uS0l9TCoC2RFGCaK_YEhsli7Vq5YItoa1VUaGqPrCblPYAqADUkj3_Gv2rC1ued8SH6XQ6cjLRu0ApcRN6nk3sL50LPNkd9ZOf8y9x7DwdEu-OfErzZEuBsrPc-O0YXd4d0i27HoxPdPevrtjTt6-_N9-Lx58PPzZfHgsrpciFrbo1icoMqhpqNdQwrCXYdkC0VDWEouk7xBZIWjAWGiFagx3KpjZ90yqQK_bpsvd81J-JUtYHlyx5bwKNU9KqlqqSgHNSXJI2jilFGvRLdAcTjxpBzyb1Xs8m9WxSo9Bnk2eo-Q-yLpvsxpCjcf599P6C0vn9V0dRJ-soWOpdJJt1P7r38DczHZLF
CitedBy_id crossref_primary_10_1177_1687814019843699
crossref_primary_10_1177_1687814018765535
crossref_primary_10_1016_j_engappai_2016_12_020
crossref_primary_10_1007_s00170_011_3190_0
crossref_primary_10_1155_2016_5413520
crossref_primary_10_3390_sym13081521
crossref_primary_10_1007_s00170_015_7100_8
crossref_primary_10_1016_j_asoc_2014_03_031
crossref_primary_10_1080_00207543_2017_1398426
crossref_primary_10_1007_s10700_015_9225_5
crossref_primary_10_1007_s00500_019_03767_0
Cites_doi 10.1007/s10700-004-5870-9
10.1016/0377-2217(93)E0228-P
10.1016/0165-0114(92)90372-B
10.1142/S0218488503002466
10.1016/S0019-9958(65)90241-X
10.1111/j.1475-3995.1999.tb00178.x
10.1016/S0377-2217(02)00561-1
10.1016/0925-5273(94)90118-X
10.1016/0165-0114(94)90210-0
10.1016/S0952-1976(01)00011-2
10.1016/S0360-8352(98)00128-4
10.1016/S0377-2217(99)00094-6
10.1016/0165-0114(95)00273-1
10.1016/0305-0548(93)E0014-K
10.1016/S0360-8352(99)00135-7
10.1007/s10700-004-5571-4
10.1287/ijoc.6.2.154
ContentType Journal Article
Copyright 2009 Elsevier Ltd
Copyright_xml – notice: 2009 Elsevier Ltd
DBID AAYXX
CITATION
7SC
8FD
JQ2
L7M
L~C
L~D
DOI 10.1016/j.eswa.2009.12.029
DatabaseName CrossRef
Computer and Information Systems Abstracts
Technology Research Database
ProQuest Computer Science Collection
Advanced Technologies Database with Aerospace
Computer and Information Systems Abstracts – Academic
Computer and Information Systems Abstracts Professional
DatabaseTitle CrossRef
Computer and Information Systems Abstracts
Technology Research Database
Computer and Information Systems Abstracts – Academic
Advanced Technologies Database with Aerospace
ProQuest Computer Science Collection
Computer and Information Systems Abstracts Professional
DatabaseTitleList
Computer and Information Systems Abstracts
DeliveryMethod fulltext_linktorsrc
Discipline Computer Science
EISSN 1873-6793
EndPage 4866
ExternalDocumentID 10_1016_j_eswa_2009_12_029
S0957417409010756
GroupedDBID --K
--M
.DC
.~1
0R~
13V
1B1
1RT
1~.
1~5
29G
4.4
457
4G.
5GY
5VS
7-5
71M
8P~
9JN
9JO
AAAKF
AAAKG
AABNK
AACTN
AAEDT
AAEDW
AAIAV
AAIKJ
AAKOC
AALRI
AAOAW
AAQFI
AAQXK
AARIN
AAXUO
AAYFN
ABBOA
ABFNM
ABKBG
ABMAC
ABMVD
ABUCO
ABXDB
ABYKQ
ACDAQ
ACGFS
ACHRH
ACNNM
ACNTT
ACRLP
ACZNC
ADBBV
ADEZE
ADJOM
ADMUD
ADTZH
AEBSH
AECPX
AEKER
AENEX
AFKWA
AFTJW
AGHFR
AGJBL
AGUBO
AGUMN
AGYEJ
AHHHB
AHJVU
AHZHX
AIALX
AIEXJ
AIKHN
AITUG
AJBFU
AJOXV
ALEQD
ALMA_UNASSIGNED_HOLDINGS
AMFUW
AMRAJ
AOUOD
APLSM
ASPBG
AVWKF
AXJTR
AZFZN
BJAXD
BKOJK
BLXMC
BNSAS
CS3
DU5
EBS
EFJIC
EFLBG
EJD
EO8
EO9
EP2
EP3
F5P
FDB
FEDTE
FGOYB
FIRID
FNPLU
FYGXN
G-2
G-Q
GBLVA
GBOLZ
HAMUX
HLZ
HVGLF
HZ~
IHE
J1W
JJJVA
KOM
LG9
LY1
LY7
M41
MO0
N9A
O-L
O9-
OAUVE
OZT
P-8
P-9
P2P
PC.
PQQKQ
Q38
R2-
RIG
ROL
RPZ
SBC
SDF
SDG
SDP
SDS
SES
SET
SEW
SPC
SPCBC
SSB
SSD
SSL
SST
SSV
SSZ
T5K
TN5
WUQ
XPP
ZMT
~G-
AATTM
AAXKI
AAYWO
AAYXX
ABJNI
ABWVN
ACLOT
ACRPL
ACVFH
ADCNI
ADNMO
AEIPS
AEUPX
AFJKZ
AFPUW
AGQPQ
AIGII
AIIUN
AKBMS
AKRWK
AKYEP
ANKPU
APXCP
CITATION
EFKBS
~HD
7SC
8FD
JQ2
L7M
L~C
L~D
ID FETCH-LOGICAL-c332t-c4b6e24af74f57f50f630c9f11ce48e128db1190e3c0ac08229a1b1385ad89703
IEDL.DBID AIKHN
ISSN 0957-4174
IngestDate Sun Sep 28 08:08:27 EDT 2025
Wed Oct 01 03:51:23 EDT 2025
Thu Apr 24 23:10:24 EDT 2025
Fri Feb 23 02:30:22 EST 2024
IsPeerReviewed true
IsScholarly true
Issue 7
Keywords Fuzzy completion time
Fuzzy due date
Fuzzy processing time
Earliness and Tardiness
Fuzzy numbers
Language English
License https://www.elsevier.com/tdm/userlicense/1.0
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c332t-c4b6e24af74f57f50f630c9f11ce48e128db1190e3c0ac08229a1b1385ad89703
Notes ObjectType-Article-2
SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 23
PQID 753743010
PQPubID 23500
PageCount 7
ParticipantIDs proquest_miscellaneous_753743010
crossref_primary_10_1016_j_eswa_2009_12_029
crossref_citationtrail_10_1016_j_eswa_2009_12_029
elsevier_sciencedirect_doi_10_1016_j_eswa_2009_12_029
ProviderPackageCode CITATION
AAYXX
PublicationCentury 2000
PublicationDate 2010-07-01
PublicationDateYYYYMMDD 2010-07-01
PublicationDate_xml – month: 07
  year: 2010
  text: 2010-07-01
  day: 01
PublicationDecade 2010
PublicationTitle Expert systems with applications
PublicationYear 2010
Publisher Elsevier Ltd
Publisher_xml – name: Elsevier Ltd
References Gen, Cheng (bib8) 2000
Sakawa, Kubota (bib21) 2000; 120
Chanas, Kasperski (bib3) 2001; 14
Zimmermann (bib26) 1991
Reeves (bib20) 1995; 22
Zadeh (bib24) 1965; 8
Pinedo (bib19) 2002
Itoh, Ishii (bib14) 1999; 6
Murata, Gen, Ishibuchi (bib17) 1998; 35
Ishibuchi, Yamamoto, Misaki, Tanaka (bib11) 1994; 33
Chanas, Kasperski (bib4) 2003; 147
(bib23) 2000
Ishii, Tada, Masuda (bib13) 1992; 46
Chen, Vempati, Aljaber (bib5) 1995; 80
Klir, Yuan (bib16) 1995
8, 199–249, 8, 301–357, 9, 43–80.
Goldberg D. E., & Lingle, R. (1985). Alleles, loci and the traveling salesman problem. In
Negoita, Ralescu (bib18) 1975
Sakawa, Mori (bib22) 1999; 36
Bean (bib1) 1994; 6
Harikrishnan, Ishii (bib10) 2005; 4
Celano, Costa, Fichera (bib2) 2003; 11
Gen, Cheng (bib7) 1997
Itoh, Ishii (bib15) 2005; 4
Fortemps, Roubens (bib6) 1996; 82
Zadeh, L. A. (1975). The concept of linguistic variable and its application to approximate reasoning I, II and III.
(pp. 160–168).
Ishibuchi, Yamamoto, Murata, Tanaka (bib12) 1994; 67
10.1016/j.eswa.2009.12.029_bib9
Fortemps (10.1016/j.eswa.2009.12.029_bib6) 1996; 82
Harikrishnan (10.1016/j.eswa.2009.12.029_bib10) 2005; 4
Negoita (10.1016/j.eswa.2009.12.029_bib18) 1975
Celano (10.1016/j.eswa.2009.12.029_bib2) 2003; 11
Pinedo (10.1016/j.eswa.2009.12.029_bib19) 2002
Sakawa (10.1016/j.eswa.2009.12.029_bib22) 1999; 36
Klir (10.1016/j.eswa.2009.12.029_bib16) 1995
(10.1016/j.eswa.2009.12.029_bib23) 2000
Ishii (10.1016/j.eswa.2009.12.029_bib13) 1992; 46
Sakawa (10.1016/j.eswa.2009.12.029_bib21) 2000; 120
Chen (10.1016/j.eswa.2009.12.029_bib5) 1995; 80
Zadeh (10.1016/j.eswa.2009.12.029_bib24) 1965; 8
Gen (10.1016/j.eswa.2009.12.029_bib8) 2000
Bean (10.1016/j.eswa.2009.12.029_bib1) 1994; 6
Chanas (10.1016/j.eswa.2009.12.029_bib4) 2003; 147
Ishibuchi (10.1016/j.eswa.2009.12.029_bib11) 1994; 33
Itoh (10.1016/j.eswa.2009.12.029_bib14) 1999; 6
Gen (10.1016/j.eswa.2009.12.029_bib7) 1997
Reeves (10.1016/j.eswa.2009.12.029_bib20) 1995; 22
Murata (10.1016/j.eswa.2009.12.029_bib17) 1998; 35
Ishibuchi (10.1016/j.eswa.2009.12.029_bib12) 1994; 67
Chanas (10.1016/j.eswa.2009.12.029_bib3) 2001; 14
Itoh (10.1016/j.eswa.2009.12.029_bib15) 2005; 4
10.1016/j.eswa.2009.12.029_bib25
Zimmermann (10.1016/j.eswa.2009.12.029_bib26) 1991
References_xml – reference: (pp. 160–168).
– reference: 8, 199–249, 8, 301–357, 9, 43–80.
– volume: 120
  start-page: 393
  year: 2000
  end-page: 407
  ident: bib21
  article-title: Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms
  publication-title: European Journal of Operational Research
– volume: 8
  start-page: 338
  year: 1965
  end-page: 353
  ident: bib24
  article-title: Fuzzy sets
  publication-title: Information and Control
– volume: 22
  start-page: 5
  year: 1995
  end-page: 13
  ident: bib20
  article-title: A genetic algorithm for flowshop sequencing
  publication-title: Computers and Operations Research
– year: 2000
  ident: bib23
  publication-title: Scheduling under fuzziness
– volume: 35
  start-page: 439
  year: 1998
  end-page: 442
  ident: bib17
  article-title: Multiobjective scheduling with fuzzy due date
  publication-title: Computers and Industrial Engineering
– volume: 147
  start-page: 281
  year: 2003
  end-page: 296
  ident: bib4
  article-title: On two single machine scheduling problems with fuzzy processing times and fuzzy due dates
  publication-title: European Journal of Operational Research
– year: 2000
  ident: bib8
  article-title: Genetic algorithms and engineering optimization
– volume: 4
  start-page: 71
  year: 2005
  end-page: 78
  ident: bib15
  article-title: One machine scheduling problem with fuzzy random due-dates
  publication-title: Fuzzy Optimization and Decision Making
– volume: 33
  start-page: 53
  year: 1994
  end-page: 66
  ident: bib11
  article-title: Local search algorithms for flow shop scheduling with fuzzy due-dates
  publication-title: International Journal of Production Economics
– year: 1991
  ident: bib26
  article-title: Fuzzy sets theory and its applications (2nd)
– volume: 46
  start-page: 339
  year: 1992
  end-page: 347
  ident: bib13
  article-title: Two scheduling problems with fuzzy due-dates
  publication-title: Fuzzy Sets and Systems
– year: 1975
  ident: bib18
  article-title: Applications of fuzzy sets to systems analysis
– volume: 11
  start-page: 655
  year: 2003
  end-page: 669
  ident: bib2
  article-title: An evolutionary algorithm for pure fuzzy flowshop scheduling problems
  publication-title: International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems
– volume: 82
  start-page: 319
  year: 1996
  end-page: 330
  ident: bib6
  article-title: Ranking and defuzzification methods based on area compensation
  publication-title: Fuzzy Sets and Systems
– volume: 67
  start-page: 81
  year: 1994
  end-page: 100
  ident: bib12
  article-title: Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problems
  publication-title: Fuzzy Sets and Systems
– year: 1997
  ident: bib7
  article-title: Genetic algorithms and engineering design
– volume: 14
  start-page: 377
  year: 2001
  end-page: 386
  ident: bib3
  article-title: Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates
  publication-title: Engineering Applications of Artificial Intelligence
– reference: Goldberg D. E., & Lingle, R. (1985). Alleles, loci and the traveling salesman problem. In
– volume: 36
  start-page: 325
  year: 1999
  end-page: 341
  ident: bib22
  article-title: An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy due date
  publication-title: Computers and Industrial Engineering
– volume: 6
  start-page: 154
  year: 1994
  end-page: 160
  ident: bib1
  article-title: Genetic algorithms and random keys for sequencing and optimization
  publication-title: ORSA Journal on Computing
– year: 1995
  ident: bib16
  article-title: Fuzzy sets and fuzzy logic: Theory and applications
– volume: 80
  start-page: 389
  year: 1995
  end-page: 396
  ident: bib5
  article-title: An application of genetic algorithm for flow shop problems
  publication-title: European Journal of Operational Research
– reference: Zadeh, L. A. (1975). The concept of linguistic variable and its application to approximate reasoning I, II and III.
– volume: 6
  start-page: 639
  year: 1999
  end-page: 647
  ident: bib14
  article-title: Fuzzy due-date scheduling problem with fuzzy processing time
  publication-title: International Transactions in Operational Research
– year: 2002
  ident: bib19
  article-title: Scheduling: theory, algorithms and systems (2nd)
– volume: 4
  start-page: 141
  year: 2005
  end-page: 147
  ident: bib10
  article-title: Single machine batch scheduling problem with resource dependent setup and processing time in the presence of fuzzy due date
  publication-title: Fuzzy Optimization and Decision Making
– year: 1995
  ident: 10.1016/j.eswa.2009.12.029_bib16
– volume: 4
  start-page: 141
  year: 2005
  ident: 10.1016/j.eswa.2009.12.029_bib10
  article-title: Single machine batch scheduling problem with resource dependent setup and processing time in the presence of fuzzy due date
  publication-title: Fuzzy Optimization and Decision Making
  doi: 10.1007/s10700-004-5870-9
– volume: 80
  start-page: 389
  year: 1995
  ident: 10.1016/j.eswa.2009.12.029_bib5
  article-title: An application of genetic algorithm for flow shop problems
  publication-title: European Journal of Operational Research
  doi: 10.1016/0377-2217(93)E0228-P
– ident: 10.1016/j.eswa.2009.12.029_bib9
– year: 2002
  ident: 10.1016/j.eswa.2009.12.029_bib19
– volume: 46
  start-page: 339
  year: 1992
  ident: 10.1016/j.eswa.2009.12.029_bib13
  article-title: Two scheduling problems with fuzzy due-dates
  publication-title: Fuzzy Sets and Systems
  doi: 10.1016/0165-0114(92)90372-B
– volume: 11
  start-page: 655
  year: 2003
  ident: 10.1016/j.eswa.2009.12.029_bib2
  article-title: An evolutionary algorithm for pure fuzzy flowshop scheduling problems
  publication-title: International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems
  doi: 10.1142/S0218488503002466
– year: 2000
  ident: 10.1016/j.eswa.2009.12.029_bib8
– volume: 8
  start-page: 338
  year: 1965
  ident: 10.1016/j.eswa.2009.12.029_bib24
  article-title: Fuzzy sets
  publication-title: Information and Control
  doi: 10.1016/S0019-9958(65)90241-X
– volume: 6
  start-page: 639
  year: 1999
  ident: 10.1016/j.eswa.2009.12.029_bib14
  article-title: Fuzzy due-date scheduling problem with fuzzy processing time
  publication-title: International Transactions in Operational Research
  doi: 10.1111/j.1475-3995.1999.tb00178.x
– volume: 147
  start-page: 281
  year: 2003
  ident: 10.1016/j.eswa.2009.12.029_bib4
  article-title: On two single machine scheduling problems with fuzzy processing times and fuzzy due dates
  publication-title: European Journal of Operational Research
  doi: 10.1016/S0377-2217(02)00561-1
– year: 2000
  ident: 10.1016/j.eswa.2009.12.029_bib23
– volume: 33
  start-page: 53
  year: 1994
  ident: 10.1016/j.eswa.2009.12.029_bib11
  article-title: Local search algorithms for flow shop scheduling with fuzzy due-dates
  publication-title: International Journal of Production Economics
  doi: 10.1016/0925-5273(94)90118-X
– ident: 10.1016/j.eswa.2009.12.029_bib25
– volume: 67
  start-page: 81
  year: 1994
  ident: 10.1016/j.eswa.2009.12.029_bib12
  article-title: Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problems
  publication-title: Fuzzy Sets and Systems
  doi: 10.1016/0165-0114(94)90210-0
– volume: 14
  start-page: 377
  year: 2001
  ident: 10.1016/j.eswa.2009.12.029_bib3
  article-title: Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates
  publication-title: Engineering Applications of Artificial Intelligence
  doi: 10.1016/S0952-1976(01)00011-2
– volume: 35
  start-page: 439
  year: 1998
  ident: 10.1016/j.eswa.2009.12.029_bib17
  article-title: Multiobjective scheduling with fuzzy due date
  publication-title: Computers and Industrial Engineering
  doi: 10.1016/S0360-8352(98)00128-4
– year: 1991
  ident: 10.1016/j.eswa.2009.12.029_bib26
– volume: 120
  start-page: 393
  year: 2000
  ident: 10.1016/j.eswa.2009.12.029_bib21
  article-title: Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms
  publication-title: European Journal of Operational Research
  doi: 10.1016/S0377-2217(99)00094-6
– year: 1997
  ident: 10.1016/j.eswa.2009.12.029_bib7
– volume: 82
  start-page: 319
  year: 1996
  ident: 10.1016/j.eswa.2009.12.029_bib6
  article-title: Ranking and defuzzification methods based on area compensation
  publication-title: Fuzzy Sets and Systems
  doi: 10.1016/0165-0114(95)00273-1
– volume: 22
  start-page: 5
  year: 1995
  ident: 10.1016/j.eswa.2009.12.029_bib20
  article-title: A genetic algorithm for flowshop sequencing
  publication-title: Computers and Operations Research
  doi: 10.1016/0305-0548(93)E0014-K
– volume: 36
  start-page: 325
  year: 1999
  ident: 10.1016/j.eswa.2009.12.029_bib22
  article-title: An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy due date
  publication-title: Computers and Industrial Engineering
  doi: 10.1016/S0360-8352(99)00135-7
– volume: 4
  start-page: 71
  year: 2005
  ident: 10.1016/j.eswa.2009.12.029_bib15
  article-title: One machine scheduling problem with fuzzy random due-dates
  publication-title: Fuzzy Optimization and Decision Making
  doi: 10.1007/s10700-004-5571-4
– volume: 6
  start-page: 154
  year: 1994
  ident: 10.1016/j.eswa.2009.12.029_bib1
  article-title: Genetic algorithms and random keys for sequencing and optimization
  publication-title: ORSA Journal on Computing
  doi: 10.1287/ijoc.6.2.154
– year: 1975
  ident: 10.1016/j.eswa.2009.12.029_bib18
SSID ssj0017007
Score 2.060509
Snippet The scheduling problems with fuzzy processing times and fuzzy due dates are concerned in this paper. The fuzzy earliness and fuzzy tardiness are proposed based...
SourceID proquest
crossref
elsevier
SourceType Aggregation Database
Enrichment Source
Index Database
Publisher
StartPage 4860
SubjectTerms Earliness and Tardiness
Fuzzy
Fuzzy completion time
Fuzzy due date
Fuzzy logic
Fuzzy numbers
Fuzzy processing time
Fuzzy set theory
Fuzzy systems
Mathematical analysis
Mathematical models
Matlab
Scheduling
Title Solving the fuzzy earliness and tardiness in scheduling problems by using genetic algorithms
URI https://dx.doi.org/10.1016/j.eswa.2009.12.029
https://www.proquest.com/docview/753743010
Volume 37
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVESC
  databaseName: Elsevier ScienceDirect
  customDbUrl:
  eissn: 1873-6793
  dateEnd: 99991231
  omitProxy: true
  ssIdentifier: ssj0017007
  issn: 0957-4174
  databaseCode: ACRLP
  dateStart: 19950101
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
– providerCode: PRVESC
  databaseName: Science Direct
  customDbUrl:
  eissn: 1873-6793
  dateEnd: 99991231
  omitProxy: true
  ssIdentifier: ssj0017007
  issn: 0957-4174
  databaseCode: .~1
  dateStart: 19950101
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
– providerCode: PRVESC
  databaseName: ScienceDirect Journal Collection
  customDbUrl:
  eissn: 1873-6793
  dateEnd: 99991231
  omitProxy: true
  ssIdentifier: ssj0017007
  issn: 0957-4174
  databaseCode: AIKHN
  dateStart: 19950101
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
– providerCode: PRVLSH
  databaseName: Elsevier Journals
  customDbUrl:
  mediaType: online
  eissn: 1873-6793
  dateEnd: 99991231
  omitProxy: true
  ssIdentifier: ssj0017007
  issn: 0957-4174
  databaseCode: AKRWK
  dateStart: 19900101
  isFulltext: true
  providerName: Library Specific Holdings
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1LT8MwDLZgXLjwRoyXcuCGypq1XdMjQqABgsuYxAEpSrIEhkY3bZ0QHPjt2G2KBEIcOLZKqspx7M-J_RngKBVE0qVdEGsi1XaCB1pkcaAShHKRUYkreQtubjvdfnx1n9wvwFldC0Npld72Vza9tNb-TctLszUZDls9BAfoDlMMUDCmSJPOIiyh_xGiAUunl9fd26_LhDSsqqZxfEATfO1MleZlZ6-qoq2kU8ESaf7qn35Y6tL9XKzBiseN7LT6tXVYsPkGrNY9GZjfopvw0BuP6IyAIbBjbv7-_sZQl0dlcjtT-YAVpBLl0zBnGNqiq6GKdOY7y8yYfmOUDP_IULWowpGp0eN4OiyeXmZb0L84vzvrBr6DQmCiqF0EBlfAtmPl0tglqUtC14lCkznOjY2FRd800BwhgY1MqExJ_q645pFI1EBkaAy2oZGPc7sDTGmuQifa2ikTRw6DaroUNZkgNhgtBk3gtdyk8fTi1OViJOs8smdJsqa-l5nkbYmybsLx15xJRa7x5-ikXg75TUUkWv8_57F67STuHboQUbkdz2cSQzUEUKg9u__89B4sV9kElL67D41iOrcHCFIKfQiLJx_80KviJyEQ5uc
linkProvider Elsevier
linkToHtml http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV07T8MwELZ4DLDwRpSnBzYUWidx44wIgQq0LIDEgGTZrg1FJa3aVKgd-O3cJQ4SCDEwJooj63y--86--46Q40QgSZd2QayRVNsJFmiRxoHiAOUio7greAs6t83WQ3z9yB_nyHlVC4Npld72lza9sNb-Td1Lsz7s9ep3AA7AHSYQoEBMkfDmPFmMeZhgBHb68ZXngfxzSUm4B3OBz33lTJnkZcfvqiStxDPBAmf-6p1-2OnC-VyukRWPGulZObF1MmezDbJadWSgfoNukqe7QR9PCCjAOuoms9mUgib3i9R2qrIuzVEhiqdeRiGwBUeD9ejU95UZUz2lmAr_TEGxsL6Rqv7zYNTLX97GW-Th8uL-vBX4_gmBiaIwDwzI34axcknseOJ4wzWjhkkdY8bGwoJn6moGgMBGpqFMQf2umGaR4KorUjAF22QhG2R2h1ClmWo4EWqnTBw5CKnxStSkArlgtOjWCKvkJo0nF8ceF31ZZZG9SpQ1dr1MJQslyLpGTr7GDEtqjT-_5tVyyG8KIsH2_zmOVmsnYefgdYjK7GAylhCoAXwC3dn956-PyFLrvtOW7avbmz2yXOYVYCLvPlnIRxN7AHAl14eFOn4CDXznrw
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Solving+the+fuzzy+earliness+and+tardiness+in+scheduling+problems+by+using+genetic+algorithms&rft.jtitle=Expert+systems+with+applications&rft.au=Wu%2C+Hsien-Chung&rft.date=2010-07-01&rft.issn=0957-4174&rft.volume=37&rft.issue=7&rft.spage=4860&rft.epage=4866&rft_id=info:doi/10.1016%2Fj.eswa.2009.12.029&rft.externalDBID=n%2Fa&rft.externalDocID=10_1016_j_eswa_2009_12_029
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0957-4174&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0957-4174&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0957-4174&client=summon