Reliability evaluation of unrepairable k-out-of-n: G systems with phased-mission requirements based on record values

•A dynamic k-out-of-n: G phased-mission system (PMS) is modeled.•Effects of imperfect fault coverage (IFC) are considered.•Reliability expression for a static k-out-of-n: G PMS with IFC is derived.•Two mission reliability evaluation algorithms are proposed based on record values.•The optimal number...

Full description

Saved in:
Bibliographic Details
Published inReliability engineering & system safety Vol. 178; pp. 191 - 197
Main Authors Wang, Guanjun, Peng, Rui, Xing, Liudong
Format Journal Article
LanguageEnglish
Published Barking Elsevier Ltd 01.10.2018
Elsevier BV
Subjects
Online AccessGet full text
ISSN0951-8320
1879-0836
DOI10.1016/j.ress.2018.06.009

Cover

More Information
Summary:•A dynamic k-out-of-n: G phased-mission system (PMS) is modeled.•Effects of imperfect fault coverage (IFC) are considered.•Reliability expression for a static k-out-of-n: G PMS with IFC is derived.•Two mission reliability evaluation algorithms are proposed based on record values.•The optimal number of system components is solved for a given mission. In this paper, the reliability evaluation problem for k-out-of-n: G phased-mission systems with imperfect fault coverage is studied. The system is composed of n identical components, and the mission consists of multiple, consecutive, and non-overlapping phases. Each phase of the mission has a specified requirement of the minimal number of working components, and therefore the system forms a certain k-out-of-n: G system at the phase. The failure distributions of the components are affected by working circumstance of the mission phases, and the degradation accumulates with the phases for each component. The formulas for computing the state probabilities of the system at different phases and the overall mission reliability are derived with the consideration of imperfect fault coverage for the components. The explicit expression of mission reliability is presented for the phased-mission systems with the same components requirements for all phases. In numerical examples, not only the mission reliability of the system is calculated, but also the optimal number of components is obtained to maximize the reliability for a given phased mission system.
Bibliography:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ISSN:0951-8320
1879-0836
DOI:10.1016/j.ress.2018.06.009