APA (7th ed.) Citation

Bocewicz, G., Bożejko, W., Wójcik, R., & Banaszak, Z. (2019). Milk-run routing and scheduling subject to a trade-off between vehicle fleet size and storage capacity. Management and Production Engineering Review, 10(3), . https://doi.org/10.24425/mper.2019.129597

Chicago Style (17th ed.) Citation

Bocewicz, Grzegorz, Wojciech Bożejko, Robert Wójcik, and Zbigniew Banaszak. "Milk-run Routing and Scheduling Subject to a Trade-off Between Vehicle Fleet Size and Storage Capacity." Management and Production Engineering Review 10, no. 3 (2019). https://doi.org/10.24425/mper.2019.129597.

MLA (9th ed.) Citation

Bocewicz, Grzegorz, et al. "Milk-run Routing and Scheduling Subject to a Trade-off Between Vehicle Fleet Size and Storage Capacity." Management and Production Engineering Review, vol. 10, no. 3, 2019, https://doi.org/10.24425/mper.2019.129597.

Warning: These citations may not always be 100% accurate.