APA (7th ed.) Citation

Wang, T., Abdallah, M., Clevenger, C., & Monghasemi, S. (2021). Time–cost–quality trade-off analysis for planning construction projects. Engineering, construction, and architectural management, 28(1), 82-100. https://doi.org/10.1108/ECAM-12-2017-0271

Chicago Style (17th ed.) Citation

Wang, Tianqi, Moatassem Abdallah, Caroline Clevenger, and Shahryar Monghasemi. "Time–cost–quality Trade-off Analysis for Planning Construction Projects." Engineering, Construction, and Architectural Management 28, no. 1 (2021): 82-100. https://doi.org/10.1108/ECAM-12-2017-0271.

MLA (9th ed.) Citation

Wang, Tianqi, et al. "Time–cost–quality Trade-off Analysis for Planning Construction Projects." Engineering, Construction, and Architectural Management, vol. 28, no. 1, 2021, pp. 82-100, https://doi.org/10.1108/ECAM-12-2017-0271.

Warning: These citations may not always be 100% accurate.