Stochastic resource-constrained scheduling for repetitive construction projects with uncertain supply of resources and funding

In this paper, we schedule construction projects that are repetitively performed by similar resources (labor and equipment) from one location to another when the supply of resources and funding is not only limited but also subject to uncertainty. The supply conditions are hence expressed as probabil...

Full description

Saved in:
Bibliographic Details
Published inInternational journal of project management Vol. 23; no. 7; pp. 546 - 553
Main Authors Yang, I-Tung, Chang, Chi-Yi
Format Journal Article
LanguageEnglish
Published Kidlington Elsevier Ltd 01.10.2005
Elsevier Science Ltd
Subjects
Online AccessGet full text
ISSN0263-7863
1873-4634
DOI10.1016/j.ijproman.2005.03.003

Cover

Abstract In this paper, we schedule construction projects that are repetitively performed by similar resources (labor and equipment) from one location to another when the supply of resources and funding is not only limited but also subject to uncertainty. The supply conditions are hence expressed as probabilistic distributions in lieu of single estimates. The problem is formulated as a chance-constrained program, which is converted to a deterministic equivalent and solved by means of common linear programming techniques. The proposed chance-constrained programming model is applied to a housing project with 100 units and a real-life tunnel project to illustrate its practical usefulness in determining project acceleration strategies and in conducting risk management analyses. Model verification is performed by Monte Carlo simulations to confirm that the probability of constraint satisfaction is beyond the required confidence level.
AbstractList In this paper, we schedule construction projects that are repetitively performed by similar resources (labor and equipment) from one location to another when the supply of resources and funding is not only limited but also subject to uncertainty. The supply conditions are hence expressed as probabilistic distributions in lieu of single estimates. The problem is formulated as a chance-constrained program, which is converted to a deterministic equivalent and solved by means of common linear programming techniques. The proposed chance-constrained programming model is applied to a housing project with 100 units and a real-life tunnel project to illustrate its practical usefulness in determining project acceleration strategies and in conducting risk management analyses. Model verification is performed by Monte Carlo simulations to confirm that the probability of constraint satisfaction is beyond the required confidence level. [PUBLICATION ABSTRACT]
In this paper, we schedule construction projects that are repetitively performed by similar resources (labor and equipment) from one location to another when the supply of resources and funding is not only limited but also subject to uncertainty. The supply conditions are hence expressed as probabilistic distributions in lieu of single estimates. The problem is formulated as a chance-constrained program, which is converted to a deterministic equivalent and solved by means of common linear programming techniques. The proposed chance-constrained programming model is applied to a housing project with 100 units and a real-life tunnel project to illustrate its practical usefulness in determining project acceleration strategies and in conducting risk management analyses. Model verification is performed by Monte Carlo simulations to confirm that the probability of constraint satisfaction is beyond the required confidence level.
Author Chang, Chi-Yi
Yang, I-Tung
Author_xml – sequence: 1
  givenname: I-Tung
  surname: Yang
  fullname: Yang, I-Tung
  email: ityang@mail.tku.edu.tw
  organization: Department of Civil Engineering, Tamkang University, 151 Yingchuan Road, Tamsui, Taipei County 251, Taiwan
– sequence: 2
  givenname: Chi-Yi
  surname: Chang
  fullname: Chang, Chi-Yi
  email: tavina.chang@msa.hinet.net
  organization: Department of Construction Engineering, Chaoyang University of Technology, Taiwan
BookMark eNqFkE1P3TAQRa0KpD4-_kJlsU86jhM7kViAEG2RkLoorC1jT_ocPezUdkBs-O04em0XbFjN5t4zV-eIHPjgkZAvDGoGTHydajfNMTxqXzcAXQ28BuCfyIb1klet4O0B2UAjeCV7wT-To5QmACahkxvy-isHs9UpO0MjprBEg5UJPuWonUdLk9miXXbO_6ZjiCUzY3bZPSHdpxaTXfC0DJjQ5ESfXd7SxRuMuQBoWuZ590LD-J-eqPaWjou3hXlCDke9S3j69x6T-2_Xd1c_qtuf32-uLm8rw6HPFWe27UAIua5GGJoH2wkc-r6xcuQWetZJbbi1LRuath8baXEYh0EPosQk48fkbM8tO_8smLKayhhfXqqGMRiANW0JiX3IxJBSxFHN0T3q-KIYqFW1mtQ_1WpVrYCroroUz98Vjct69bJa3H1cv9jXsRh4chhVMg6LQuticapscB8h3gDUP6Sz
CitedBy_id crossref_primary_10_1061__ASCE_CO_1943_7862_0002348
crossref_primary_10_1080_15623599_2019_1683691
crossref_primary_10_1016_j_ijpe_2019_107522
crossref_primary_10_1080_15623599_2021_1975078
crossref_primary_10_1155_2017_7545980
crossref_primary_10_53102_2021_35_01_916
crossref_primary_10_1016_j_autcon_2024_105428
crossref_primary_10_1016_j_autcon_2017_08_032
crossref_primary_10_1111_mice_12038
crossref_primary_10_1111_mice_12277
crossref_primary_10_1108_ECAM_09_2023_0910
crossref_primary_10_3846_jcem_2022_16943
crossref_primary_10_47456_bjpe_v9i4_42244
crossref_primary_10_1080_10429247_2020_1861855
crossref_primary_10_1061__ASCE_CO_1943_7862_0000244
crossref_primary_10_1080_15623599_2020_1786764
crossref_primary_10_1108_ECAM_08_2012_0080
crossref_primary_10_1061__ASCE_IS_1943_555X_0000356
crossref_primary_10_1108_ECAM_05_2020_0304
crossref_primary_10_3934_jimo_2016_12_719
crossref_primary_10_1108_ECAM_05_2014_0069
crossref_primary_10_1007_s11390_012_1276_2
crossref_primary_10_4028_www_scientific_net_AMM_483_607
crossref_primary_10_1108_ECAM_08_2019_0458
crossref_primary_10_1016_j_ijproman_2007_01_006
crossref_primary_10_1061__ASCE_CO_1943_7862_0001040
crossref_primary_10_3846_1392_8619_2009_15_540_560
crossref_primary_10_1108_IJBPA_09_2023_0140
Cites_doi 10.1061/(ASCE)0733-9364(1983)109:1(102)
10.1016/0305-0548(94)90014-0
10.1016/S0377-2217(98)00204-5
10.1016/0377-2217(93)90231-B
10.1016/0377-2217(90)90116-S
10.1061/(ASCE)0733-9364(1999)125:5(304)
10.1016/S0377-2217(97)00311-1
10.2307/2346887
10.1016/0377-2217(93)90177-O
10.1287/mnsc.44.5.714
10.2307/2347061
10.1287/mnsc.38.12.1803
10.1061/(ASCE)0733-9364(1999)125:6(420)
10.1016/S0377-2217(00)00086-2
10.1287/mnsc.6.1.73
10.1061/(ASCE)0733-9364(1999)125:3(167)
10.1016/S0305-0548(97)00055-5
10.1007/s004770100066
10.1016/S0377-2217(97)00305-6
10.1061/(ASCE)0733-9364(1990)116:2(316)
10.1287/mnsc.13.6.B359
10.1061/(ASCE)0733-9364(1986)112:3(387)
10.1080/01446190310001649065
ContentType Journal Article
Copyright 2005 Elsevier Ltd and IPMA
Copyright Elsevier Science Ltd. Oct 2005
Copyright_xml – notice: 2005 Elsevier Ltd and IPMA
– notice: Copyright Elsevier Science Ltd. Oct 2005
DBID AAYXX
CITATION
7TA
8FD
JG9
JQ2
DOI 10.1016/j.ijproman.2005.03.003
DatabaseName CrossRef
Materials Business File
Technology Research Database
Materials Research Database
ProQuest Computer Science Collection
DatabaseTitle CrossRef
Materials Research Database
Technology Research Database
Materials Business File
ProQuest Computer Science Collection
DatabaseTitleList Materials Research Database

DeliveryMethod fulltext_linktorsrc
Discipline Engineering
EISSN 1873-4634
EndPage 553
ExternalDocumentID 919983041
10_1016_j_ijproman_2005_03_003
S0263786305000384
Genre Feature
GroupedDBID --K
--M
.~1
0R~
13V
1B1
1RT
1~.
1~5
29J
4.4
457
4G.
5GY
5VS
7-5
71M
8P~
9JO
AAAKF
AAAKG
AABNK
AACTN
AAEDT
AAEDW
AAIAV
AAIKJ
AAKOC
AALRI
AAOAW
AAQFI
AAQXK
AARIN
AAXUO
ABFNM
ABJNI
ABKBG
ABMAC
ABMVD
ABUCO
ABXDB
ABYKQ
ACDAQ
ACGFS
ACHQT
ACHRH
ACIWK
ACNNM
ACNTT
ACRLP
ADBBV
ADEZE
ADMUD
AEBSH
AEKER
AFKWA
AFTJW
AGHFR
AGJBL
AGUBO
AGUMN
AGYEJ
AHHHB
AHJVU
AIEXJ
AIKHN
AITUG
AJBFU
AJOXV
ALEQD
ALMA_UNASSIGNED_HOLDINGS
AMFUW
AMRAJ
APLSM
ASPBG
AVWKF
AXJTR
AZFZN
BJAXD
BKOJK
BKOMP
BLXMC
BNSAS
CS3
DU5
EBS
EFJIC
EFLBG
EJD
EO8
EO9
EP2
EP3
FDB
FEDTE
FGOYB
FIRID
FNPLU
FYGXN
G-2
G-Q
GBLVA
HAMUX
HLX
HVGLF
HZ~
IHE
J1W
KOM
LG8
LY1
M41
MO0
MS~
N9A
O-L
O9-
OAUVE
OZT
P-8
P-9
P2P
PC.
PQQKQ
Q38
R2-
RIG
ROL
RPZ
SBM
SDF
SDG
SDS
SES
SEW
SPC
SPCBC
SSB
SSD
SSL
SST
SSZ
T5K
TN5
WUQ
XPP
YK3
ZMT
~G-
AATTM
AAXKI
AAYWO
AAYXX
ABWVN
ACLOT
ACRPL
ACVFH
ADCNI
ADNMO
AEIPS
AEUPX
AFJKZ
AFPUW
AGQPQ
AIGII
AIIUN
AKBMS
AKRWK
AKYEP
ANKPU
APXCP
CITATION
EFKBS
~HD
7TA
8FD
AFXIZ
AGCQF
AGRNS
JG9
JQ2
SSH
ID FETCH-LOGICAL-c308t-31d4506671705e092bd56e9882d7f3d08157ac3dd419248f27de9f99a966e9713
IEDL.DBID .~1
ISSN 0263-7863
IngestDate Fri Jul 25 08:01:52 EDT 2025
Wed Oct 01 03:18:37 EDT 2025
Thu Apr 24 23:11:05 EDT 2025
Fri Feb 23 02:21:18 EST 2024
IsPeerReviewed true
IsScholarly true
Issue 7
Keywords Risk
Chance-constrained programming
Time
Cost
Language English
License https://www.elsevier.com/tdm/userlicense/1.0
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c308t-31d4506671705e092bd56e9882d7f3d08157ac3dd419248f27de9f99a966e9713
Notes SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 14
PQID 211090124
PQPubID 32311
PageCount 8
ParticipantIDs proquest_journals_211090124
crossref_primary_10_1016_j_ijproman_2005_03_003
crossref_citationtrail_10_1016_j_ijproman_2005_03_003
elsevier_sciencedirect_doi_10_1016_j_ijproman_2005_03_003
ProviderPackageCode CITATION
AAYXX
PublicationCentury 2000
PublicationDate 2005-10-00
PublicationDateYYYYMMDD 2005-10-01
PublicationDate_xml – month: 10
  year: 2005
  text: 2005-10-00
PublicationDecade 2000
PublicationPlace Kidlington
PublicationPlace_xml – name: Kidlington
PublicationTitle International journal of project management
PublicationYear 2005
Publisher Elsevier Ltd
Elsevier Science Ltd
Publisher_xml – name: Elsevier Ltd
– name: Elsevier Science Ltd
References Handa, Barcia (bib13) 1986; 112
Odeh, Evans (bib25) 1974; 23
Hegazy (bib14) 1999; 125
Icmeli, Erenguc (bib16) 1994; 21
Perera (bib27) 1983; 109
Goldratt (bib12) 1997
Chang CY. Chance-constrained programming model for repetitive project scheduling under stochastic resource and funding supply. Master thesis, Chaoyang University of Technology, Taiwan; 2003, 133 pp.
Herroelen, Reyck, Demeulemeester (bib15) 1998; 25
Elmaghraby (bib10) 1993; 64
Wiest (bib31) 1967; 13
Brucker, Drexl, Mohring (bib2) 1999; 112
Demeulemeester, Herroelen (bib6) 1992; 38
Jeffcoat, Bulfin (bib17) 1993; 70
Lumsden (bib21) 1968
Boctor (bib1) 1990; 49
Reda (bib28) 1990; 116
Charnes, Cooper (bib4) 1959; 6
Demeulmeester, Herroelen (bib7) 2002
Elmaghraby, Soewandi, Yao (bib11) 2001; 131
Ouarda, Labadie (bib26) 2001; 15
Kelley (bib18) 1963
Kraft ER. A reservations-based railway network operations management system. PhD thesis, Department of Systems Engineering, University of Pennsylvania; 1998.
Tsai, Gemmill (bib30) 1998; 111
Näslund B. Decision under risk. Publication No. 8162, Economic Research Institute, Stockholm School of Economics, Sweden; 1967.
Tommelein, Riley, Howell (bib29) 1999; 125
Diekmann, Featherman, Moody, Molenaar, Rodriguez-Guy (bib9) 1996; 27
Neumann, Schwindt, Zimmermann (bib24) 2003
De Reyck, Herroelen (bib8) 1998; 111
Cran, Martin, Thomas (bib5) 1977; 26
Mingozzi, Maniezzo, Ricciardelli, Bianco (bib22) 1998; 44
Leu, Yang (bib20) 1999; 125
Yang, Ioannou (bib32) 2004; 22
Ouarda (10.1016/j.ijproman.2005.03.003_bib26) 2001; 15
Elmaghraby (10.1016/j.ijproman.2005.03.003_bib11) 2001; 131
Lumsden (10.1016/j.ijproman.2005.03.003_bib21) 1968
Mingozzi (10.1016/j.ijproman.2005.03.003_bib22) 1998; 44
Handa (10.1016/j.ijproman.2005.03.003_bib13) 1986; 112
Tsai (10.1016/j.ijproman.2005.03.003_bib30) 1998; 111
Kelley (10.1016/j.ijproman.2005.03.003_bib18) 1963
10.1016/j.ijproman.2005.03.003_bib19
Demeulemeester (10.1016/j.ijproman.2005.03.003_bib6) 1992; 38
Reda (10.1016/j.ijproman.2005.03.003_bib28) 1990; 116
Herroelen (10.1016/j.ijproman.2005.03.003_bib15) 1998; 25
Odeh (10.1016/j.ijproman.2005.03.003_bib25) 1974; 23
Goldratt (10.1016/j.ijproman.2005.03.003_bib12) 1997
Jeffcoat (10.1016/j.ijproman.2005.03.003_bib17) 1993; 70
Leu (10.1016/j.ijproman.2005.03.003_bib20) 1999; 125
Brucker (10.1016/j.ijproman.2005.03.003_bib2) 1999; 112
Cran (10.1016/j.ijproman.2005.03.003_bib5) 1977; 26
Tommelein (10.1016/j.ijproman.2005.03.003_bib29) 1999; 125
Perera (10.1016/j.ijproman.2005.03.003_bib27) 1983; 109
De Reyck (10.1016/j.ijproman.2005.03.003_bib8) 1998; 111
Diekmann (10.1016/j.ijproman.2005.03.003_bib9) 1996; 27
Boctor (10.1016/j.ijproman.2005.03.003_bib1) 1990; 49
Hegazy (10.1016/j.ijproman.2005.03.003_bib14) 1999; 125
Icmeli (10.1016/j.ijproman.2005.03.003_bib16) 1994; 21
Yang (10.1016/j.ijproman.2005.03.003_bib32) 2004; 22
Charnes (10.1016/j.ijproman.2005.03.003_bib4) 1959; 6
10.1016/j.ijproman.2005.03.003_bib23
10.1016/j.ijproman.2005.03.003_bib3
Neumann (10.1016/j.ijproman.2005.03.003_bib24) 2003
Elmaghraby (10.1016/j.ijproman.2005.03.003_bib10) 1993; 64
Wiest (10.1016/j.ijproman.2005.03.003_bib31) 1967; 13
Demeulmeester (10.1016/j.ijproman.2005.03.003_bib7) 2002
References_xml – volume: 21
  start-page: 841
  year: 1994
  end-page: 853
  ident: bib16
  article-title: A tabu search procedure for the resource constrained project scheduling problem with discounted cash flows
  publication-title: Comput Oper Res
– volume: 26
  start-page: 111
  year: 1977
  end-page: 114
  ident: bib5
  article-title: A remark on algorithm AS63: the incomplete beta integral, AS64. Inverse of the incomplete beta function ratio
  publication-title: Appl Stat
– volume: 64
  start-page: 199
  year: 1993
  end-page: 215
  ident: bib10
  article-title: Resource allocation via dynamic programming in activity networks
  publication-title: Eur J Oper Res
– volume: 70
  start-page: 43
  year: 1993
  end-page: 51
  ident: bib17
  article-title: Simulated annealing for resource-constrained scheduling
  publication-title: Eur J Oper Res
– volume: 22
  start-page: 619
  year: 2004
  end-page: 630
  ident: bib32
  article-title: Scheduling system with focus on practical concerns in repetitive projects
  publication-title: Constr Manage Econ
– volume: 25
  start-page: 279
  year: 1998
  end-page: 302
  ident: bib15
  article-title: Resource-constrained project scheduling: a survey of recent developments
  publication-title: Comput Oper Res
– year: 1968
  ident: bib21
  article-title: The line-of-balance method
– volume: 6
  start-page: 73
  year: 1959
  end-page: 79
  ident: bib4
  article-title: Chance-constrained programming
  publication-title: Manage Sci
– volume: 49
  start-page: 3
  year: 1990
  end-page: 13
  ident: bib1
  article-title: Some efficient multi-heuristic procedures for resource-constrained project scheduling
  publication-title: Eur J Oper Res
– volume: 44
  start-page: 714
  year: 1998
  end-page: 729
  ident: bib22
  article-title: An exact algorithm for project scheduling with resource constraints based on a new mathematical formulation
  publication-title: Manage Sci
– volume: 13
  start-page: B359
  year: 1967
  end-page: B377
  ident: bib31
  article-title: A heuristic model for scheduling large projects with limited resources
  publication-title: Manage Sci
– start-page: 347
  year: 1963
  end-page: 365
  ident: bib18
  article-title: The critical path method: resources planning and scheduling
  publication-title: Industrial scheduling
– volume: 38
  start-page: 1803
  year: 1992
  end-page: 1818
  ident: bib6
  article-title: A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
  publication-title: Manage Sci
– volume: 125
  start-page: 420
  year: 1999
  end-page: 427
  ident: bib20
  article-title: GA-based multicriteria optimal model for constructions scheduling
  publication-title: ASCE J Constr Eng Manage
– volume: 15
  start-page: 185
  year: 2001
  end-page: 204
  ident: bib26
  article-title: Chance-constrained optimal control for multireservoir system optimization and risk analysis
  publication-title: Stoch Environ Res Risk Assess
– reference: Näslund B. Decision under risk. Publication No. 8162, Economic Research Institute, Stockholm School of Economics, Sweden; 1967.
– year: 2002
  ident: bib7
  article-title: Project scheduling: a research handbook
– reference: Kraft ER. A reservations-based railway network operations management system. PhD thesis, Department of Systems Engineering, University of Pennsylvania; 1998.
– volume: 27
  start-page: 23
  year: 1996
  end-page: 30
  ident: bib9
  article-title: Project cost risk analysis using influence diagrams
  publication-title: Proj Manage J
– volume: 111
  start-page: 129
  year: 1998
  end-page: 141
  ident: bib30
  article-title: Using tabu search to schedule activities of stochastic resource-constrained projects
  publication-title: Eur J Oper Res
– volume: 109
  start-page: 102
  year: 1983
  end-page: 111
  ident: bib27
  article-title: Resource sharing in linear construction
  publication-title: ASCE J Constr Eng Manage
– volume: 125
  start-page: 304
  year: 1999
  end-page: 310
  ident: bib29
  article-title: Parade game: impact of work flow variability on trade performance
  publication-title: ASCE J Constr Eng Manage
– year: 1997
  ident: bib12
  article-title: Critical chain
– volume: 23
  start-page: 96
  year: 1974
  end-page: 97
  ident: bib25
  article-title: The percentage points of the normal distribution
  publication-title: Appl Stat
– reference: Chang CY. Chance-constrained programming model for repetitive project scheduling under stochastic resource and funding supply. Master thesis, Chaoyang University of Technology, Taiwan; 2003, 133 pp.
– volume: 112
  start-page: 3
  year: 1999
  end-page: 41
  ident: bib2
  article-title: Resource-constrained project scheduling: notation, classification, models and methods
  publication-title: Eur J Oper Res
– volume: 112
  start-page: 387
  year: 1986
  end-page: 393
  ident: bib13
  article-title: Linear scheduling using optimal control theory
  publication-title: ASCE J Constr Eng Manage
– volume: 111
  start-page: 152
  year: 1998
  end-page: 174
  ident: bib8
  article-title: A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
  publication-title: Eur J Oper Res
– volume: 125
  start-page: 167
  year: 1999
  end-page: 175
  ident: bib14
  article-title: Optimization of resource allocation and leveling using genetic algorithms
  publication-title: ASCE J Constr Eng Manage
– volume: 131
  start-page: 440
  year: 2001
  end-page: 458
  ident: bib11
  article-title: Chance-constrained programming in activity networks: a critical evaluation
  publication-title: Eur J Oper Res
– year: 2003
  ident: bib24
  article-title: Project scheduling with time windows and scarce resources: temporal and resource-constrained project scheduling with regular and nonregular objective functions
– volume: 116
  start-page: 316330
  year: 1990
  ident: bib28
  article-title: RPM: repetitive project modeling
  publication-title: ASCE J Constr Eng Manage
– ident: 10.1016/j.ijproman.2005.03.003_bib3
– volume: 109
  start-page: 102
  issue: 1
  year: 1983
  ident: 10.1016/j.ijproman.2005.03.003_bib27
  article-title: Resource sharing in linear construction
  publication-title: ASCE J Constr Eng Manage
  doi: 10.1061/(ASCE)0733-9364(1983)109:1(102)
– start-page: 347
  year: 1963
  ident: 10.1016/j.ijproman.2005.03.003_bib18
  article-title: The critical path method: resources planning and scheduling
– volume: 27
  start-page: 23
  issue: 4
  year: 1996
  ident: 10.1016/j.ijproman.2005.03.003_bib9
  article-title: Project cost risk analysis using influence diagrams
  publication-title: Proj Manage J
– volume: 21
  start-page: 841
  issue: 8
  year: 1994
  ident: 10.1016/j.ijproman.2005.03.003_bib16
  article-title: A tabu search procedure for the resource constrained project scheduling problem with discounted cash flows
  publication-title: Comput Oper Res
  doi: 10.1016/0305-0548(94)90014-0
– volume: 112
  start-page: 3
  year: 1999
  ident: 10.1016/j.ijproman.2005.03.003_bib2
  article-title: Resource-constrained project scheduling: notation, classification, models and methods
  publication-title: Eur J Oper Res
  doi: 10.1016/S0377-2217(98)00204-5
– year: 2002
  ident: 10.1016/j.ijproman.2005.03.003_bib7
– volume: 70
  start-page: 43
  year: 1993
  ident: 10.1016/j.ijproman.2005.03.003_bib17
  article-title: Simulated annealing for resource-constrained scheduling
  publication-title: Eur J Oper Res
  doi: 10.1016/0377-2217(93)90231-B
– volume: 49
  start-page: 3
  year: 1990
  ident: 10.1016/j.ijproman.2005.03.003_bib1
  article-title: Some efficient multi-heuristic procedures for resource-constrained project scheduling
  publication-title: Eur J Oper Res
  doi: 10.1016/0377-2217(90)90116-S
– volume: 125
  start-page: 304
  issue: 5
  year: 1999
  ident: 10.1016/j.ijproman.2005.03.003_bib29
  article-title: Parade game: impact of work flow variability on trade performance
  publication-title: ASCE J Constr Eng Manage
  doi: 10.1061/(ASCE)0733-9364(1999)125:5(304)
– volume: 111
  start-page: 129
  year: 1998
  ident: 10.1016/j.ijproman.2005.03.003_bib30
  article-title: Using tabu search to schedule activities of stochastic resource-constrained projects
  publication-title: Eur J Oper Res
  doi: 10.1016/S0377-2217(97)00311-1
– year: 1968
  ident: 10.1016/j.ijproman.2005.03.003_bib21
– volume: 26
  start-page: 111
  year: 1977
  ident: 10.1016/j.ijproman.2005.03.003_bib5
  article-title: A remark on algorithm AS63: the incomplete beta integral, AS64. Inverse of the incomplete beta function ratio
  publication-title: Appl Stat
  doi: 10.2307/2346887
– volume: 64
  start-page: 199
  year: 1993
  ident: 10.1016/j.ijproman.2005.03.003_bib10
  article-title: Resource allocation via dynamic programming in activity networks
  publication-title: Eur J Oper Res
  doi: 10.1016/0377-2217(93)90177-O
– volume: 44
  start-page: 714
  issue: 5
  year: 1998
  ident: 10.1016/j.ijproman.2005.03.003_bib22
  article-title: An exact algorithm for project scheduling with resource constraints based on a new mathematical formulation
  publication-title: Manage Sci
  doi: 10.1287/mnsc.44.5.714
– volume: 23
  start-page: 96
  year: 1974
  ident: 10.1016/j.ijproman.2005.03.003_bib25
  article-title: The percentage points of the normal distribution
  publication-title: Appl Stat
  doi: 10.2307/2347061
– year: 1997
  ident: 10.1016/j.ijproman.2005.03.003_bib12
– volume: 38
  start-page: 1803
  year: 1992
  ident: 10.1016/j.ijproman.2005.03.003_bib6
  article-title: A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
  publication-title: Manage Sci
  doi: 10.1287/mnsc.38.12.1803
– volume: 125
  start-page: 420
  issue: 6
  year: 1999
  ident: 10.1016/j.ijproman.2005.03.003_bib20
  article-title: GA-based multicriteria optimal model for constructions scheduling
  publication-title: ASCE J Constr Eng Manage
  doi: 10.1061/(ASCE)0733-9364(1999)125:6(420)
– volume: 131
  start-page: 440
  year: 2001
  ident: 10.1016/j.ijproman.2005.03.003_bib11
  article-title: Chance-constrained programming in activity networks: a critical evaluation
  publication-title: Eur J Oper Res
  doi: 10.1016/S0377-2217(00)00086-2
– volume: 6
  start-page: 73
  issue: 1
  year: 1959
  ident: 10.1016/j.ijproman.2005.03.003_bib4
  article-title: Chance-constrained programming
  publication-title: Manage Sci
  doi: 10.1287/mnsc.6.1.73
– volume: 125
  start-page: 167
  issue: 3
  year: 1999
  ident: 10.1016/j.ijproman.2005.03.003_bib14
  article-title: Optimization of resource allocation and leveling using genetic algorithms
  publication-title: ASCE J Constr Eng Manage
  doi: 10.1061/(ASCE)0733-9364(1999)125:3(167)
– volume: 25
  start-page: 279
  issue: 4
  year: 1998
  ident: 10.1016/j.ijproman.2005.03.003_bib15
  article-title: Resource-constrained project scheduling: a survey of recent developments
  publication-title: Comput Oper Res
  doi: 10.1016/S0305-0548(97)00055-5
– ident: 10.1016/j.ijproman.2005.03.003_bib23
– year: 2003
  ident: 10.1016/j.ijproman.2005.03.003_bib24
– ident: 10.1016/j.ijproman.2005.03.003_bib19
– volume: 15
  start-page: 185
  issue: 3
  year: 2001
  ident: 10.1016/j.ijproman.2005.03.003_bib26
  article-title: Chance-constrained optimal control for multireservoir system optimization and risk analysis
  publication-title: Stoch Environ Res Risk Assess
  doi: 10.1007/s004770100066
– volume: 111
  start-page: 152
  year: 1998
  ident: 10.1016/j.ijproman.2005.03.003_bib8
  article-title: A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
  publication-title: Eur J Oper Res
  doi: 10.1016/S0377-2217(97)00305-6
– volume: 116
  start-page: 316330
  issue: 2
  year: 1990
  ident: 10.1016/j.ijproman.2005.03.003_bib28
  article-title: RPM: repetitive project modeling
  publication-title: ASCE J Constr Eng Manage
  doi: 10.1061/(ASCE)0733-9364(1990)116:2(316)
– volume: 13
  start-page: B359
  issue: 6
  year: 1967
  ident: 10.1016/j.ijproman.2005.03.003_bib31
  article-title: A heuristic model for scheduling large projects with limited resources
  publication-title: Manage Sci
  doi: 10.1287/mnsc.13.6.B359
– volume: 112
  start-page: 387
  issue: 3
  year: 1986
  ident: 10.1016/j.ijproman.2005.03.003_bib13
  article-title: Linear scheduling using optimal control theory
  publication-title: ASCE J Constr Eng Manage
  doi: 10.1061/(ASCE)0733-9364(1986)112:3(387)
– volume: 22
  start-page: 619
  issue: 6
  year: 2004
  ident: 10.1016/j.ijproman.2005.03.003_bib32
  article-title: Scheduling system with focus on practical concerns in repetitive projects
  publication-title: Constr Manage Econ
  doi: 10.1080/01446190310001649065
SSID ssj0017057
Score 1.8939842
Snippet In this paper, we schedule construction projects that are repetitively performed by similar resources (labor and equipment) from one location to another when...
SourceID proquest
crossref
elsevier
SourceType Aggregation Database
Enrichment Source
Index Database
Publisher
StartPage 546
SubjectTerms Chance-constrained programming
Construction costs
Cost
Linear programming
Monte Carlo simulation
Project management
Risk
Risk assessment
Stochastic models
Studies
Supply
Time
Title Stochastic resource-constrained scheduling for repetitive construction projects with uncertain supply of resources and funding
URI https://dx.doi.org/10.1016/j.ijproman.2005.03.003
https://www.proquest.com/docview/211090124
Volume 23
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVESC
  databaseName: Elsevier SD Complete Freedom Collection [SCCMFC]
  customDbUrl:
  eissn: 1873-4634
  dateEnd: 99991231
  omitProxy: true
  ssIdentifier: ssj0017057
  issn: 0263-7863
  databaseCode: ACRLP
  dateStart: 19950201
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
– providerCode: PRVESC
  databaseName: Elsevier SD Freedom Collection
  customDbUrl:
  eissn: 1873-4634
  dateEnd: 99991231
  omitProxy: true
  ssIdentifier: ssj0017057
  issn: 0263-7863
  databaseCode: .~1
  dateStart: 19950101
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
– providerCode: PRVESC
  databaseName: Elsevier SD Freedom Collection Journals [SCFCJ]
  customDbUrl:
  eissn: 1873-4634
  dateEnd: 99991231
  omitProxy: true
  ssIdentifier: ssj0017057
  issn: 0263-7863
  databaseCode: AIKHN
  dateStart: 19950201
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
– providerCode: PRVLSH
  databaseName: Elsevier Journals
  customDbUrl:
  mediaType: online
  eissn: 1873-4634
  dateEnd: 99991231
  omitProxy: true
  ssIdentifier: ssj0017057
  issn: 0263-7863
  databaseCode: AKRWK
  dateStart: 19830101
  isFulltext: true
  providerName: Library Specific Holdings
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV09T8MwELWqssCA-BSlUHlgdZPWSRyPVUVVQOpSKnWLnNgWrSCtSBeW_nbuEqcqSKgDa2Rbie9y7-58fkfIAzZ9j7IoY1EkDQuMkSy2XDAtkA-slwKmldUWk2g8C57n4bxBhvVdGCyrdLa_sumltXZPPLeb3nqx8KYQPXARR6Cw5fkWcoIi-xfodHe7K_NAthhR5Vk4w9F7t4SX3cUSzNSHyl1uBclO-V8A9ctUl_gzOiOnznGkg-rdzknD5BfkZI9O8JJsp5tV9qaQeZl-urQ8y9ABxD4QRlOIZAFZ8AI6BV8VxqzxjhnYO1qNqphkqcvOFBSTtBSAryoboAV2AP2iK7tbvaAq1xSwERHwisxGj6_DMXP9FVjG_XgD5lcHIRa54iYZX_ZTHUZGgs-theUanIVQqIxrjSfFQWz7QhtppVQQIhkJ0e01aear3NwQKpSyWnOL7DGBwbNY29MiVTL2bap82SJhvalJ5sjH8dvfk7rKbJnUwsDOmGHic6QtbRFvN29d0W8cnCFrmSU_FCkBjDg4t10LOXG_cpFghAxOUz-4_cfKbXJcc776vTvSBImae_BmNmmnVNcOORo8vYwn3_jn-GI
linkProvider Elsevier
linkToHtml http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV07T8MwED5BGYAB8RSlPDywhqTNw_FYVaCWR5cWic1yYlu0grQiXVj47dw1TgVIiIE18lmJz7n3fQdwSUPfkzzJvSQRxouMEV5qQ-5pTnhg7Qx12rLaYpj0H6Pbp_hpDXp1LwyVVTrZX8n0pbR2T3x3mv58MvFH6D2EPE3wwi7zW9E6bEQxyuQGbHQHd_3hKpnAgwrwE9d7RPClUXh6NZmipHpVhQuvEN5p-JuO-iGtlyroZhd2nO3IutXr7cGaKfZh-wui4AF8jBaz_FkR-DJ7c5F5LycbkEZBGM3QmUXlQj3oDM1VXDOnNjMUeaxaVYHJMhegKRnFaRnqvqpygJU0BPSdzexq95KpQjNUj6QED-Hx5nrc63tuxIKXh0G6QAmso5jqXOmQTCA6mY4TI9Ds1tyGGu2FmKs81JqSxVFqO1wbYYVQ6CUZgQ7uETSKWWGOgXGlrNahJQCZyFA61rY1z5RIA5upQDQhrg9V5g5_nL79RdaFZlNZM4OGY8YyCAm5tAn-im5eIXD8SSFqnslvd0mimviTtlUzWbq_uZTkJKPd1IlO_rHzBWz2xw_38n4wvGvBVg0BG7RPoYHcNWdo3Cyyc3d5PwFe8PsN
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Stochastic+resource-constrained+scheduling+for+repetitive+construction+projects+with+uncertain+supply+of+resources+and+funding&rft.jtitle=International+journal+of+project+management&rft.au=Yang%2C+I-Tung&rft.au=Chang%2C+Chi-Yi&rft.date=2005-10-01&rft.issn=0263-7863&rft.volume=23&rft.issue=7&rft.spage=546&rft.epage=553&rft_id=info:doi/10.1016%2Fj.ijproman.2005.03.003&rft.externalDBID=n%2Fa&rft.externalDocID=10_1016_j_ijproman_2005_03_003
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0263-7863&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0263-7863&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0263-7863&client=summon