Yu, H., Wang, Y., Li, T., Gan, Q., Qu, D., & Qu, F. (2025). Calibrating activated sludge models through hyperparameter optimization: A new framework for wastewater treatment plant simulation. npj clean water, 8(1), 80-12. https://doi.org/10.1038/s41545-025-00513-y
Chicago Style (17th ed.) CitationYu, Huarong, Yue Wang, Tan Li, Qibo Gan, Dan Qu, and Fangshu Qu. "Calibrating Activated Sludge Models Through Hyperparameter Optimization: A New Framework for Wastewater Treatment Plant Simulation." Npj Clean Water 8, no. 1 (2025): 80-12. https://doi.org/10.1038/s41545-025-00513-y.
MLA (9th ed.) CitationYu, Huarong, et al. "Calibrating Activated Sludge Models Through Hyperparameter Optimization: A New Framework for Wastewater Treatment Plant Simulation." Npj Clean Water, vol. 8, no. 1, 2025, pp. 80-12, https://doi.org/10.1038/s41545-025-00513-y.