Huang, W., Chen, P., Chen, G. Y., & Dang, J. (2022). The Dynamic Flow Shop Scheduling Problem with JIT Philosophy and Common Due Date. Mathematical problems in engineering, 2022, 1-12. https://doi.org/10.1155/2022/9970988
Chicago Style (17th ed.) CitationHuang, Wen-Tso, Ping-Shun Chen, Gary Yu-Hsin Chen, and Jr-Fong Dang. "The Dynamic Flow Shop Scheduling Problem with JIT Philosophy and Common Due Date." Mathematical Problems in Engineering 2022 (2022): 1-12. https://doi.org/10.1155/2022/9970988.
MLA (9th ed.) CitationHuang, Wen-Tso, et al. "The Dynamic Flow Shop Scheduling Problem with JIT Philosophy and Common Due Date." Mathematical Problems in Engineering, vol. 2022, 2022, pp. 1-12, https://doi.org/10.1155/2022/9970988.
Warning: These citations may not always be 100% accurate.