APA (7th ed.) Citation

Amirian, H., & Sahraeian, R. (2018). A hybrid integer grey programming for an integrated problem of project selection and scheduling with interval data. Journal of industrial and production engineering, 35(4), 199-213. https://doi.org/10.1080/21681015.2018.1437792

Chicago Style (17th ed.) Citation

Amirian, Homa, and Rashed Sahraeian. "A Hybrid Integer Grey Programming for an Integrated Problem of Project Selection and Scheduling with Interval Data." Journal of Industrial and Production Engineering 35, no. 4 (2018): 199-213. https://doi.org/10.1080/21681015.2018.1437792.

MLA (9th ed.) Citation

Amirian, Homa, and Rashed Sahraeian. "A Hybrid Integer Grey Programming for an Integrated Problem of Project Selection and Scheduling with Interval Data." Journal of Industrial and Production Engineering, vol. 35, no. 4, 2018, pp. 199-213, https://doi.org/10.1080/21681015.2018.1437792.

Warning: These citations may not always be 100% accurate.