Use of Construction Project Scheduling Methods in the Czech Republic
This article deals with research in the field of construction project scheduling in the Czech Republic. The aim of the research was to determine the scheduling maturity within project management in selected medium-sized and large companies and the change in the use of these methods during the global...
Saved in:
Published in | IOP conference series. Materials Science and Engineering Vol. 1203; no. 2; pp. 22004 - 22011 |
---|---|
Main Authors | , |
Format | Journal Article |
Language | English |
Published |
Bristol
IOP Publishing
01.11.2021
|
Subjects | |
Online Access | Get full text |
ISSN | 1757-8981 1757-899X |
DOI | 10.1088/1757-899X/1203/2/022004 |
Cover
Abstract | This article deals with research in the field of construction project scheduling in the Czech Republic. The aim of the research was to determine the scheduling maturity within project management in selected medium-sized and large companies and the change in the use of these methods during the global COVID-19 virus pandemic. The research presented in this article consists of three consecutive steps: determining the research area and the research question, designing a research plan, conducting data collection and analysis and compiling research results. For the purposes of this research, the research question was defined as follows: How do the project management scheduling methods differ depending on the company size in the selected companies in the Czech Republic? For understanding both the context and the situation in the surveyed companies, qualitative approaches to data collection and analysis were used, particularly in-depth interviews and encoding method. This approach was chosen mainly due to the fact that in case of quantitative research, the results tend to be improved by the respondents or irrelevant respondents are questioned. The semi-structured interview questions which were created based on the findings of the current state of scientific knowledge and literary research were used for the needs of in-depth interviews. Open questions (topics) related to the respondents' experience, perceptions and opinions were created as a part of the preparation process. The aim was to get more reliable and relevant answers to the questions asked. The research, which lasted for 6 months, involved 10 medium-sized and large companies from the Czech Republic. The change in the use of scheduling methods took place mainly in medium-sized companies. Large companies emphasized scheduling even before the pandemic, medium-sized companies often neglected this area - planning was not documented, linked to other projects, suppliers or customers. The pandemic has changed this situation. Companies that participated in this research have started to understand integrated scheduling approaches and are going to invest or consider to invest in complex software solutions in the near future. |
---|---|
AbstractList | This article deals with research in the field of construction project scheduling in the Czech Republic. The aim of the research was to determine the scheduling maturity within project management in selected medium-sized and large companies and the change in the use of these methods during the global COVID-19 virus pandemic. The research presented in this article consists of three consecutive steps: determining the research area and the research question, designing a research plan, conducting data collection and analysis and compiling research results. For the purposes of this research, the research question was defined as follows: How do the project management scheduling methods differ depending on the company size in the selected companies in the Czech Republic? For understanding both the context and the situation in the surveyed companies, qualitative approaches to data collection and analysis were used, particularly in-depth interviews and encoding method. This approach was chosen mainly due to the fact that in case of quantitative research, the results tend to be improved by the respondents or irrelevant respondents are questioned. The semi-structured interview questions which were created based on the findings of the current state of scientific knowledge and literary research were used for the needs of in-depth interviews. Open questions (topics) related to the respondents' experience, perceptions and opinions were created as a part of the preparation process. The aim was to get more reliable and relevant answers to the questions asked. The research, which lasted for 6 months, involved 10 medium-sized and large companies from the Czech Republic. The change in the use of scheduling methods took place mainly in medium-sized companies. Large companies emphasized scheduling even before the pandemic, medium-sized companies often neglected this area - planning was not documented, linked to other projects, suppliers or customers. The pandemic has changed this situation. Companies that participated in this research have started to understand integrated scheduling approaches and are going to invest or consider to invest in complex software solutions in the near future. |
Author | Martin, Nový Jana, Nováková |
Author_xml | – sequence: 1 givenname: Nováková surname: Jana fullname: Jana, Nováková organization: Brno University of Technology, Faculty of Civil Engineering, Institute of Structural Economics and Management , Czech Republic – sequence: 2 givenname: Nový surname: Martin fullname: Martin, Nový organization: Brno University of Technology, Faculty of Civil Engineering, Institute of Structural Economics and Management , Czech Republic |
BookMark | eNqFkE1LxDAQhoOs4O7qbzDgyUNt0iRNe5S6fsCK4rrgLXTzYbusSU3ag_56WyorguBpBuZ9ZoZnBibWWQ3AKUYXGGVZjDnjUZbnLzFOEImTGCUJQvQATPeTyb7P8BGYhbBFKOWUoim4WgcNnYGFs6H1nWxrZ-Gjd1stW7iSlVbdrrav8F63lVMB1ha2lYbFp5YVfNJNt9nV8hgcmnIX9Ml3nYP19eK5uI2WDzd3xeUykv1nNGKIco4J51IZRBXHeUmNwnmWE1JmxPANS5lSnBnCSk2oxBQxbpjWSpeSUzIHZ-Pexrv3TodWbF3nbX9SJCnihKZpyvsUH1PSuxC8NqLx9VvpPwRGYlAmBhliECMGZSIRo7KeJCNZu-Zn9f_U-R_U_WrxOycaZcgXom575g |
ContentType | Journal Article |
Copyright | Published under licence by IOP Publishing Ltd 2021. This work is published under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License. |
Copyright_xml | – notice: Published under licence by IOP Publishing Ltd – notice: 2021. This work is published under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License. |
DBID | O3W TSCCA AAYXX CITATION 8FE 8FG ABJCF ABUWG AFKRA AZQEC BENPR BGLVJ CCPQU COVID D1I DWQXO HCIFZ KB. L6V M7S PDBOC PHGZM PHGZT PIMPY PKEHL PQEST PQGLB PQQKQ PQUKI PRINS PTHSS |
DOI | 10.1088/1757-899X/1203/2/022004 |
DatabaseName | Institute of Physics Journals Open Access IOPscience (Open Access) CrossRef ProQuest SciTech Collection ProQuest Technology Collection Materials Science & Engineering Collection ProQuest Central (Alumni) ProQuest Central UK/Ireland ProQuest Central Essentials ProQuest Central Technology collection ProQuest One Community College Coronavirus Research Database ProQuest Materials Science Collection ProQuest Central Korea SciTech Premium Collection Materials Science Database ProQuest Engineering Collection Engineering Database Materials Science Collection ProQuest Central Premium ProQuest One Academic (New) Publicly Available Content Database ProQuest One Academic Middle East (New) ProQuest One Academic Eastern Edition (DO NOT USE) ProQuest One Applied & Life Sciences ProQuest One Academic ProQuest One Academic UKI Edition ProQuest Central China Engineering Collection |
DatabaseTitle | CrossRef Publicly Available Content Database Technology Collection ProQuest One Academic Middle East (New) ProQuest Central Essentials Materials Science Collection ProQuest Central (Alumni Edition) SciTech Premium Collection ProQuest One Community College ProQuest Central China ProQuest Central ProQuest One Applied & Life Sciences ProQuest Engineering Collection ProQuest Central Korea Materials Science Database ProQuest Central (New) Engineering Collection ProQuest Materials Science Collection Engineering Database ProQuest One Academic Eastern Edition Coronavirus Research Database ProQuest Technology Collection ProQuest SciTech Collection ProQuest One Academic UKI Edition Materials Science & Engineering Collection ProQuest One Academic ProQuest One Academic (New) |
DatabaseTitleList | Publicly Available Content Database CrossRef |
Database_xml | – sequence: 1 dbid: O3W name: Institute of Physics Open Access Journal Titles url: http://iopscience.iop.org/ sourceTypes: Enrichment Source Publisher – sequence: 2 dbid: 8FG name: ProQuest Technology Collection url: https://search.proquest.com/technologycollection1 sourceTypes: Aggregation Database |
DeliveryMethod | fulltext_linktorsrc |
Discipline | Engineering |
EISSN | 1757-899X |
ExternalDocumentID | 10_1088_1757_899X_1203_2_022004 MSE_1203_2_022004 |
GeographicLocations | Czech Republic |
GeographicLocations_xml | – name: Czech Republic |
GroupedDBID | 1JI 5B3 5PX 5VS AAJIO AAJKP ABHWH ABJCF ACAFW ACGFO ACHIP ACIPV AEFHF AEJGL AFKRA AFYNE AHSEE AIYBF AKPSB ALMA_UNASSIGNED_HOLDINGS ASPBG ATQHT AVWKF AZFZN BENPR BGLVJ CCPQU CEBXE CJUJL CRLBU EBS EDWGO EQZZN GROUPED_DOAJ GX1 HCIFZ HH5 IJHAN IOP IZVLO KB. KNG KQ8 M7S N5L O3W OK1 P2P PDBOC PIMPY PJBAE PTHSS RIN RNS SY9 T37 TR2 TSCCA W28 AAYXX CITATION PHGZM PHGZT 8FE 8FG ABUWG AEINN AZQEC COVID D1I DWQXO L6V PKEHL PQEST PQGLB PQQKQ PQUKI PRINS |
ID | FETCH-LOGICAL-c2034-504771377cdf04d719a4fd198933a83f7b565dd75f35ae34c14057f5eedeac743 |
IEDL.DBID | O3W |
ISSN | 1757-8981 |
IngestDate | Wed Aug 13 10:57:16 EDT 2025 Tue Jul 01 01:01:29 EDT 2025 Wed Aug 21 03:42:41 EDT 2024 Tue Dec 07 22:40:53 EST 2021 |
IsDoiOpenAccess | true |
IsOpenAccess | true |
IsPeerReviewed | true |
IsScholarly | true |
Issue | 2 |
Language | English |
License | Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI. |
LinkModel | DirectLink |
MergedId | FETCHMERGED-LOGICAL-c2034-504771377cdf04d719a4fd198933a83f7b565dd75f35ae34c14057f5eedeac743 |
Notes | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 |
OpenAccessLink | https://iopscience.iop.org/article/10.1088/1757-899X/1203/2/022004 |
PQID | 2607346667 |
PQPubID | 4998670 |
PageCount | 8 |
ParticipantIDs | iop_journals_10_1088_1757_899X_1203_2_022004 proquest_journals_2607346667 crossref_primary_10_1088_1757_899X_1203_2_022004 |
ProviderPackageCode | CITATION AAYXX |
PublicationCentury | 2000 |
PublicationDate | 20211101 2021-11-01 |
PublicationDateYYYYMMDD | 2021-11-01 |
PublicationDate_xml | – month: 11 year: 2021 text: 20211101 day: 01 |
PublicationDecade | 2020 |
PublicationPlace | Bristol |
PublicationPlace_xml | – name: Bristol |
PublicationTitle | IOP conference series. Materials Science and Engineering |
PublicationTitleAlternate | IOP Conf. Ser.: Mater. Sci. Eng |
PublicationYear | 2021 |
Publisher | IOP Publishing |
Publisher_xml | – name: IOP Publishing |
References | Doležal (MSE_1203_2_022004bib6) 2016 MSE_1203_2_022004bib8 MSE_1203_2_022004bib7 MSE_1203_2_022004bib9 JežkovÁ (MSE_1203_2_022004bib4) 2013 Hendl (MSE_1203_2_022004bib10) 2016 Reichel (MSE_1203_2_022004bib12) 2009 Nový (MSE_1203_2_022004bib1) 2006 Doležal (MSE_1203_2_022004bib2) 2012 Svozilová (MSE_1203_2_022004bib5) 2016 Široký (MSE_1203_2_022004bib11) 2011 Levy (MSE_1203_2_022004bib3) c2012 Strauss (MSE_1203_2_022004bib13) 1999 |
References_xml | – year: 2013 ident: MSE_1203_2_022004bib4 – year: 2006 ident: MSE_1203_2_022004bib1 article-title: BV008 Projektové řízení staveb I. Modul 01. Studijní opora. Brno – year: 2009 ident: MSE_1203_2_022004bib12 – year: c2012 ident: MSE_1203_2_022004bib3 – year: 2016 ident: MSE_1203_2_022004bib5 – year: 2011 ident: MSE_1203_2_022004bib11 – year: 1999 ident: MSE_1203_2_022004bib13 – start-page: 526 year: 2012 ident: MSE_1203_2_022004bib2 – ident: MSE_1203_2_022004bib9 – start-page: 440 year: 2016 ident: MSE_1203_2_022004bib10 – year: 2016 ident: MSE_1203_2_022004bib6 – ident: MSE_1203_2_022004bib7 – ident: MSE_1203_2_022004bib8 |
SSID | ssj0067440 |
Score | 2.1983266 |
Snippet | This article deals with research in the field of construction project scheduling in the Czech Republic. The aim of the research was to determine the scheduling... |
SourceID | proquest crossref iop |
SourceType | Aggregation Database Index Database Enrichment Source Publisher |
StartPage | 22004 |
SubjectTerms | COVID-19 Data analysis Data collection Pandemics Project management Qualitative analysis Questions Scheduling |
SummonAdditionalLinks | – databaseName: ProQuest Technology Collection dbid: 8FG link: http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwhV3PS8MwFA5uXvQg_sTplCAeLW3TtGlOInNzCBNxDnYLbZPoLm2lnvzrfUlT5hD02r5DeS_93pfkve8hdK05pP2cpF6WwE4HAI95PFPMkwnLQ1kkmme22uIpmS7o4zJeugO3xpVVdphogVpWhTkj94F3s4gC2Wa39YdnpkaZ21U3QqOHtkMCudZ0ik8eOiROjPidbYiMAYl5Gnb1XbDpc8_40g9JEPnENx2nblpbl516q6r-BdE270z20Z4jjPiujfAB2lLlIdr9ISN4hO4XjcKVxmb4ZicHi5_bIxY8h6hIU27-hmd2WnSDVyUG2odHX6p4xy-qVbo-RovJ-HU09dx0BK-AL6ZeHFDGjF5gIXVAJQt5RrU0JVBRlKWRZjlwNSlZrKM4UxEtQsPNdAxJEcAWiMMJ6pdVqU4R5kQDL9GcEkNQApLTNKY5VUke6JRmwQAFnVdE3YpgCHt5nabCOFIYRwrjSEFE68gBugHvCfdDNP-bX22Yz-bjTQNRSz1Awy4Wa8v1ujj7-_U52iGmHsX2EQ5RH-KhLoBQfOaXdtV8A3y7wE8 priority: 102 providerName: ProQuest |
Title | Use of Construction Project Scheduling Methods in the Czech Republic |
URI | https://iopscience.iop.org/article/10.1088/1757-899X/1203/2/022004 https://www.proquest.com/docview/2607346667 |
Volume | 1203 |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwlV09T8MwELWgXWBAfIpCqSzESGgSO7E9QmkpSP1QS0U3K4ltYEkrlYlfz9lJRCuEEFsiXRLrObl759w9I3RlBIT9NOReEkOmAw6PeSLRzFMxSwOVxUYkrtpiGPdn9Gkezdd7YRbL0vXfwGEhFFxAWBbE8TYEPHCsQszbQeiTdti2zaJWErROgJ7bBGxEXipvHFsBPNcU6S7iQVXj9fuNNiLUNozih5t2sae3j_ZK0ohviyEeoC2dH6LdNSnBI3Q_W2m8MNhuwFlJwuJxscyCpzAzypacv-KB2zF6hd9zDNQPdz519oYnulC7PkazXve50_fKHRK8DEZMvcinjFnNwEwZnyoWiIQaZcugCEk4MSwFvqYUiwyJEk1oFlh-ZiIIjOBwgTycoFq-yPUpwiI0wE2MoKElKX6YUh7RlOo49Q2nid9AfoWKXBZCGNL9wOZcWiClBVJaIGUoCyAb6BrQk-VHsfrb_HLDfDDtbhrIpTIN1Kzm4tsScjJGKCRi7Ox_jzxHO6GtUXG9hU1Ug_nRF0AyPtIW2ua9hxaq33WH4wmcPY7GLfdmfQGsccRQ |
linkProvider | IOP Publishing |
linkToHtml | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV1NT9tAEB1BcoAeUMuHmkLbVQU3rNjrtdc-oKolQUlJIkQSKbfF9u62XJxUqVTBj-O3MWN7RVGl9sTVHlnW2_G8t-v5ADi2KdJ-zhMvi3GngwFPemlmpKdjmQe6iG2aVdkWk3gwF98W0WIDHlwtDKVVuphYBWq9LOiMvIu6W4YCxbb8vPrp0dQo-rvqRmhkzWgFfVa1GGsKOy7N3W_cwq3Phj1c7xPOL_qz84HXTBnwCu6Hwot8ISX13Su09YWWQZoJqymVKAyzJLQyR82jtYxsGGUmFEVAGsdGSC4YtJCA8bmb0BZ0gNKC9tf-5OracUFM7feqkswIuSBNApdhhtvO5lq66Ab4Hl3epZrXZl6c48fN2-XqL5KomO_iNew0kpV9qX3sDWyYchde_dHIcA9687VhS8to_KdrSMuu6kMeNkW_0JTw_p2Nq3nVa3ZbMhSe7PzeFD_Ytal7be_D_EWQO4BWuSzNW2Apt6iMbCo4SSSf5yKJRC5MnPs2EZnfAd-holZ1Gw5V_T5PEkVAKgJSEZCKqxrIDpwieqr5JNf_N__0zHw87T83UCttO3Dk1uLJ8skz3_379kfYGszGIzUaTi4PYZtTdkxV1XgELVwb8x7lza_8Q-NDDG5e2m0fAe2HAtc |
linkToPdf | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwlV3JTsMwEB21RUJwQKyiUMBCHAlZ7MTJEbVEZWmpKBW9WUlsA5e0Ujnx9YyzABVCiFsOk8R648w8xzPPAGc6wrSfeqGVBLjSwYDHrShR3JIBT12ZBTpKimqLYdCfsJupP21A_NkLM5tXof8CL0uh4BLCqiAutDHhYWCNoqnteg61Pds0izrMnkvdhBWfIkXGeX1Pn-qIHBgRvKIxsrgxdOs6r98ftpSlmjiSH6G6yD_xJmxUxJFclsPcgobKt2H9m5zgDvQmC0VmmphDOGtZWDIqf7WQMXpHmrLzZzIoTo1ekNecIP0j3XeVvZAHVSpe78Ikvnrs9q3qlAQrwxEzy3cY50Y3MJPaYZK7UcK0NKVQlCYh1TxFziYl9zX1E0VZ5hqOpn1Mjhh0kUDsQSuf5WofSORp5Cc6Yp4hKo6XstBnKVNB6uiQJU4bnBoVMS_FMESxiR2GwgApDJDCACk8UQLZhnNET1QfxuJv89Ml88H4atlAoJfb0Kl98WWJ6zJOGS7G-MH_XnkCq6NeLO6uh7eHsOaZkpWi1bADLXSVOkLO8ZYeFxPqA8jUxMU |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Use+of+Construction+Project+Scheduling+Methods+in+the+Czech+Republic&rft.jtitle=IOP+conference+series.+Materials+Science+and+Engineering&rft.au=Jana%2C+Nov%C3%A1kov%C3%A1&rft.au=Martin%2C+Nov%C3%BD&rft.date=2021-11-01&rft.pub=IOP+Publishing&rft.issn=1757-8981&rft.eissn=1757-899X&rft.volume=1203&rft.issue=2&rft_id=info:doi/10.1088%2F1757-899X%2F1203%2F2%2F022004&rft.externalDocID=MSE_1203_2_022004 |
thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1757-8981&client=summon |
thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1757-8981&client=summon |
thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1757-8981&client=summon |