APA (7th ed.) Citation

Liu, K., & Liu, B. (2017). Optimization of smooth blasting parameters for mountain tunnel construction with specified control indices based on a GA and ISVR coupling algorithm. Tunnelling and underground space technology, 70, 363-374. https://doi.org/10.1016/j.tust.2017.09.007

Chicago Style (17th ed.) Citation

Liu, Kaiyun, and Baoguo Liu. "Optimization of Smooth Blasting Parameters for Mountain Tunnel Construction with Specified Control Indices Based on a GA and ISVR Coupling Algorithm." Tunnelling and Underground Space Technology 70 (2017): 363-374. https://doi.org/10.1016/j.tust.2017.09.007.

MLA (9th ed.) Citation

Liu, Kaiyun, and Baoguo Liu. "Optimization of Smooth Blasting Parameters for Mountain Tunnel Construction with Specified Control Indices Based on a GA and ISVR Coupling Algorithm." Tunnelling and Underground Space Technology, vol. 70, 2017, pp. 363-374, https://doi.org/10.1016/j.tust.2017.09.007.

Warning: These citations may not always be 100% accurate.