Guidance on the development and commissioning of new combined cycle gas turbine (CCGT) plant.

This publication provides good practice for the safe commissioning of 'new build' CCGT plant projects. New build is plant that is being planned or has recently been constructed and being made ready (during the commissioning phase) for operation to an agreed specification and contract. It i...

Full description

Saved in:
Bibliographic Details
Format Electronic eBook
LanguageEnglish
Published London : Energy Institute, 2019
EditionFirst edition.
Subjects
Online AccessFull text
ISBN9781523139583
1523139587
9781787251144
Physical Description1 online resource (170 pages) : illustrations (some color)

Cover

More Information
Summary:This publication provides good practice for the safe commissioning of 'new build' CCGT plant projects. New build is plant that is being planned or has recently been constructed and being made ready (during the commissioning phase) for operation to an agreed specification and contract. It is intended to provide high-level guidance to the asset owner's/operator's technical management team. The guidance provides a structured approach that can be utilised by the asset owner/operator to manage their project risk and record and report specific project and site knowledge.
Item Description:"June 2019"
"This publication has been produced as a result of work carried out within the Technical Team of the EI"--Title page verso.
Bibliography:Includes bibliographical references (pages 162-163)
ISBN:9781523139583
1523139587
9781787251144
Access:Plný text je dostupný pouze z IP adres počítačů Univerzity Tomáše Bati ve Zlíně nebo vzdáleným přístupem pro zaměstnance a studenty
Physical Description:1 online resource (170 pages) : illustrations (some color)