RCM3
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | eBook |
Language: | English |
Published: |
La Vergne :
Industrial Press, Inc.,
2019.
|
Edition: | 3rd ed. |
Subjects: | |
ISBN: | 9780831194857 0831194855 9780831136321 0831136324 |
Physical Description: | 1 online resource (577 pages) |
LEADER | 04639cam a2200469 4500 | ||
---|---|---|---|
001 | kn-on1083459169 | ||
003 | OCoLC | ||
005 | 20240717213016.0 | ||
006 | m o d | ||
007 | cr cn||||||||| | ||
008 | 190126s2019 xx o 000 0 eng d | ||
040 | |a EBLCP |b eng |e pn |c EBLCP |d YDX |d UBY |d OCLCF |d OCLCQ |d OCLCO |d OCLCQ |d OCLCO |d OCLCQ | ||
020 | |a 9780831194857 | ||
020 | |a 0831194855 | ||
020 | |z 9780831136321 | ||
020 | |z 0831136324 | ||
035 | |a (OCoLC)1083459169 |z (OCoLC)1083354472 |z (OCoLC)1086335382 |z (OCoLC)1264872506 | ||
100 | 1 | |a Basson, Marius. | |
245 | 1 | 0 | |a RCM3 |
250 | |a 3rd ed. | ||
260 | |a La Vergne : |b Industrial Press, Inc., |c 2019. | ||
300 | |a 1 online resource (577 pages) | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a computer |b c |2 rdamedia | ||
338 | |a online resource |b cr |2 rdacarrier | ||
505 | 0 | |a Cover (RCM3™: Risk-Based Reliability Centered Maintenance); Front Matter; Title Page; Copyright; Acknowledgments; Contents; Preface; Chapter 1; RCM3 Background; About This Book; Chapter 2; Introduction to RCM; 2.1 The changing World of Maintenance; Safety and Reliability Are Directly Related; The First-Generation Maintenance; The Second-Generation Maintenance; The Third-Generation Maintenance; The Fourth-Generation Maintenance; New Expectations and Reality; New Techniques; New Developments; The Challenges Facing Maintenance; 2.2 Maintenance and RCM; 2.3 RCM3: The Eight Questions | |
505 | 8 | |a Operating ContextFunctions and Performance Standards; Failed States (Functional Failures); Failure Mode; Failure Effects and Consequence Severity; Inherent Risk; Risk Management; Proactive Risk Management Strategies; Default Actions for Tolerable Risk Decisions; The RCM Strategy Selection Process; 2.4 Applying the RCM Process; 2.5 The RCM Risk Mitigation Strategy Selection Process; Asset Criticality and Asset Prioritization (ACAP) Process; What ACAP Should Deliver; 2.6 Asset Registry and Verification; Asset Verification Process; What Asset Verification Should Deliver; RCM Planning | |
505 | 8 | |a Setting Clear Performance Standards and How These Will be MeasuredReview Groups; Facilitators; The Outcomes of an RCM3 Analysis; Auditing and Implementation; 2.7 What RCM Achieves; 2.8 International Standards; Chapter 3; Operating Context; 3.1 Documenting the Operating Context; Chapter 4; Functions; 4.1 Describing Functions; 4.2 Performance Standards; Multiple Performance Standards; Quantitative Performance Standards; Qualitative Standards; Absolute Performance Standards; Variable Performance Standards; upper and Lower Limits; 4.3 Different Types of Functions; Primary Functions | |
505 | 8 | |a Secondary Functions4.4 How Functions Should Be Listed; Chapter 5; Failed States; 5.1 Failures; 5.2 Failed States (Functional Failures); Performance Standards and Failure; Who Should Set the Standard?; How Failed States Should Be recorded; Chapter 6; Failure Modes and Effects Analysis; 6.1 What Is a Failure Mode?; 6.2 Why Analyze Failure Modes; 6.3 Categories of Failure Modes; Falling Capability; increase in Desired Performance (or increase in Applied Stress); initial incapability; 6.4 How Much Detail; Causation; Failure Causes-Root Cause of Failure; Failure Mechanisms | |
505 | 8 | |a Normal Deterioration MechanismsOther Mechanisms; Identifying the Root Cause; Latent Causes; Behavior-Based Safety; Probability; Consequences; What Is Meant by Reasonably Likely?; Cause Versus effect; Failure Modes and the Operating Context; 6.5 Failure Effects and Consequence Severity; 6.6 Sources of Information about Failure Modes and Effects; The Manufacturer or Vendor of the Equipment; Generic Lists of Failure Modes; Other Users of the Same Equipment; The People Who Operate and Maintain the Equipment; Resnikoff Conundrum; 6.7 Levels of the Analysis and the Information Worksheet | |
500 | |a Level of Analysis | ||
506 | |a Plný text je dostupný pouze z IP adres počítačů Univerzity Tomáše Bati ve Zlíně nebo vzdáleným přístupem pro zaměstnance a studenty | ||
590 | |a Knovel |b Knovel (All titles) | ||
650 | 0 | |a Plant maintenance |x Management. | |
650 | 0 | |a Maintenance |x Management. | |
650 | 0 | |a Reliability (Engineering) | |
650 | 0 | |a Maintainability (Engineering) | |
655 | 7 | |a elektronické knihy |7 fd186907 |2 czenas | |
655 | 9 | |a electronic books |2 eczenas | |
700 | 1 | |a Aladon. | |
776 | 0 | 8 | |i Print version: |a Basson, Marius. |t RCM3: Risk-Based Reliability Centered Maintenance. |d La Vergne : Industrial Press, Inc., ©2019 |
856 | 4 | 0 | |u https://proxy.k.utb.cz/login?url=https://app.knovel.com/hotlink/toc/id:kpRCMRBRC2/rcm3-risk-based?kpromoter=marc |y Full text |