Consensus on pre-commissioning stages for cogeneration and combined cycle power plants

Prepared by Combined Cycle Task Group For the Water Technology Subcommittee of the ASME Research and Technology Committee On Water and Steam in Thermal Systems. This publication is an important adjunct to several previously published documents prepared to inform, educate and assist the reader in ade...

Full description

Saved in:
Bibliographic Details
Main Author Light, Roger W.
Format Electronic eBook
LanguageEnglish
Published New York, USA : John Wiley & Sons Ltd, 2017.
Subjects
Online AccessFull text
ISBN9780791861264
0791861260
Physical Description1 online resource (ix, 87 pages)

Cover

Table of Contents:
  • Forward
  • Acknowledgement
  • Preface
  • Section 1: Introduction
  • Section 2: Scope
  • Section 3: Avoiding premature failures
  • Section 4: Project development considerations
  • Section 5 Project design specifications
  • Section 6: Off-site fabrication and assembly
  • Section 7: On-site construction
  • Section 8: Makeup water treatment plant start-up
  • Section 9: Initial hydrostatic test (hydro) and high-velocity flush (HVF)
  • Section 10: Heat recovery stream generator cleaning
  • Section 11: Steam blow
  • Section 12: Turbine
  • Section 13: Steam turbine commissioning
  • Section 14: Start-up, shutdown, and lay-up
  • Section 15: Glossary of terms
  • Section 17: Figures and tables
  • Section 18: References
  • Appendix A: Damage/corrosion mechanisms.