Consensus on pre-commissioning stages for cogeneration and combined cycle power plants

Prepared by Combined Cycle Task Group For the Water Technology Subcommittee of the ASME Research and Technology Committee On Water and Steam in Thermal Systems. This publication is an important adjunct to several previously published documents prepared to inform, educate and assist the reader in ade...

Full description

Saved in:
Bibliographic Details
Main Author: Light, Roger W.
Format: eBook
Language: English
Published: New York, USA : John Wiley & Sons Ltd, 2017.
Subjects:
ISBN: 9780791861264
0791861260
Physical Description: 1 online resource (ix, 87 pages)

Cover

Table of contents

LEADER 03194cam a2200397 i 4500
001 kn-ocn981709996
003 OCoLC
005 20240717213016.0
006 m o d
007 cr cn|||||||||
008 170405s2017 nyu ob 000 0 eng d
040 |a RB#  |b eng  |c RB#  |d CUS  |d MERER  |d OCLCQ  |d UIU  |d OCLCF  |d OCLCQ  |d OCLCO  |d STF  |d OCLCQ  |d OCLCO  |d ESU  |d OCLCQ  |d OCLCO 
020 |a 9780791861264  |q (ebook) 
020 |a 0791861260  |q (ebook) 
035 |a (OCoLC)981709996 
100 1 |a Light, Roger W. 
245 1 0 |a Consensus on pre-commissioning stages for cogeneration and combined cycle power plants /  |c Light, Roger W. 
264 1 |a New York, USA :  |b John Wiley & Sons Ltd,  |c 2017. 
300 |a 1 online resource (ix, 87 pages) 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
504 |a Includes bibliographical references. 
505 0 |a Forward -- Acknowledgement -- Preface -- Section 1: Introduction -- Section 2: Scope -- Section 3: Avoiding premature failures -- Section 4: Project development considerations -- Section 5 Project design specifications -- Section 6: Off-site fabrication and assembly -- Section 7: On-site construction -- Section 8: Makeup water treatment plant start-up -- Section 9: Initial hydrostatic test (hydro) and high-velocity flush (HVF) -- Section 10: Heat recovery stream generator cleaning -- Section 11: Steam blow -- Section 12: Turbine -- Section 13: Steam turbine commissioning -- Section 14: Start-up, shutdown, and lay-up -- Section 15: Glossary of terms -- Section 17: Figures and tables -- Section 18: References -- Appendix A: Damage/corrosion mechanisms. 
506 |a Plný text je dostupný pouze z IP adres počítačů Univerzity Tomáše Bati ve Zlíně nebo vzdáleným přístupem pro zaměstnance a studenty 
520 |a Prepared by Combined Cycle Task Group For the Water Technology Subcommittee of the ASME Research and Technology Committee On Water and Steam in Thermal Systems. This publication is an important adjunct to several previously published documents prepared to inform, educate and assist the reader in adequately considering and planning for the many major activities involved in the design, construction and start-up of cogeneration and combined cycle power plants. Experience has shown that failure to consider the complex interrelationships between the various component systems can result in costly delays in project completion and turn over dates. Additionally, incorrect procedures and planning can result in damage or failure of key pieces of equipment or systems during subsequent operation. 
590 |a Knovel  |b Knovel (All titles) 
650 0 |a Boilers  |x steam engineering. 
650 0 |a Steam-boilers. 
650 0 |a Steam-powered electric generation 
650 0 |a Combined cycle power plants. 
655 7 |a elektronické knihy  |7 fd186907  |2 czenas 
655 9 |a electronic books  |2 eczenas 
710 2 |a American Society of Mechanical Engineers,  |e publisher. 
776 0 8 |i Print version:  |z 9780791861264 
856 4 0 |u https://proxy.k.utb.cz/login?url=https://app.knovel.com/hotlink/toc/id:kpCPCSCCC2/consensus-on-pre?kpromoter=marc  |y Full text