Consensus on pre-commissioning stages for cogeneration and combined cycle power plants
Prepared by Combined Cycle Task Group For the Water Technology Subcommittee of the ASME Research and Technology Committee On Water and Steam in Thermal Systems. This publication is an important adjunct to several previously published documents prepared to inform, educate and assist the reader in ade...
Saved in:
Main Author: | |
---|---|
Format: | eBook |
Language: | English |
Published: |
New York, USA :
John Wiley & Sons Ltd,
2017.
|
Subjects: | |
ISBN: | 9780791861264 0791861260 |
Physical Description: | 1 online resource (ix, 87 pages) |
Summary: | Prepared by Combined Cycle Task Group For the Water Technology Subcommittee of the ASME Research and Technology Committee On Water and Steam in Thermal Systems. This publication is an important adjunct to several previously published documents prepared to inform, educate and assist the reader in adequately considering and planning for the many major activities involved in the design, construction and start-up of cogeneration and combined cycle power plants. Experience has shown that failure to consider the complex interrelationships between the various component systems can result in costly delays in project completion and turn over dates. Additionally, incorrect procedures and planning can result in damage or failure of key pieces of equipment or systems during subsequent operation. |
---|---|
Bibliography: | Includes bibliographical references. |
ISBN: | 9780791861264 0791861260 |
Access: | Plný text je dostupný pouze z IP adres počítačů Univerzity Tomáše Bati ve Zlíně nebo vzdáleným přístupem pro zaměstnance a studenty |