Facility integrity management : effective principles and practices for the oil, gas and petrochemical industries
Saved in:
| Main Author | |
|---|---|
| Format | Electronic eBook |
| Language | English |
| Published |
Cambridge, MA :
Gulf Professional Publishing, an imprint of Elsevier,
2016.
|
| Subjects | |
| Online Access | Full text |
| ISBN | 9780128018323 0128018321 0128017643 9780128017647 |
| Physical Description | 1 online resource |
Cover
| LEADER | 00000cam a2200000 i 4500 | ||
|---|---|---|---|
| 001 | kn-ocn942588104 | ||
| 003 | OCoLC | ||
| 005 | 20240717213016.0 | ||
| 006 | m o d | ||
| 007 | cr cn||||||||| | ||
| 008 | 160302s2016 mau ob 001 0 eng d | ||
| 040 | |a N$T |b eng |e rda |e pn |c N$T |d IDEBK |d OPELS |d OCLCO |d CDX |d N$T |d OCLCO |d YDXCP |d OCLCF |d OCLCO |d KNOVL |d COO |d DEBSZ |d OCLCQ |d U3W |d D6H |d RRP |d AU@ |d WYU |d ABC |d S2H |d OCLCO |d VT2 |d OCLCO |d OCLCQ |d COA |d OCLCO |d OCLCL |d SXB |d OCLCQ |d OCLCO | ||
| 020 | |a 9780128018323 |q (electronic bk.) | ||
| 020 | |a 0128018321 |q (electronic bk.) | ||
| 020 | |a 0128017643 | ||
| 020 | |a 9780128017647 | ||
| 020 | |z 9780128017647 |q (print) | ||
| 024 | 8 | |a (WaSeSS)ssj0001636956 | |
| 035 | |a (OCoLC)942588104 |z (OCoLC)1006984339 |z (OCoLC)1244446152 |z (OCoLC)1340119048 | ||
| 100 | 1 | |a Deighton, Michael Guy, |e author. |1 https://id.oclc.org/worldcat/entity/E39PCjHcxr8H9TCHbDx8PYhjFq | |
| 245 | 1 | 0 | |a Facility integrity management : |b effective principles and practices for the oil, gas and petrochemical industries / |c Michael Guy Deighton. |
| 264 | 1 | |a Cambridge, MA : |b Gulf Professional Publishing, an imprint of Elsevier, |c 2016. | |
| 300 | |a 1 online resource | ||
| 336 | |a text |b txt |2 rdacontent | ||
| 337 | |a computer |b c |2 rdamedia | ||
| 338 | |a online resource |b cr |2 rdacarrier | ||
| 504 | |a Includes bibliographical references and index. | ||
| 505 | 0 | |a Cover; Title page; Copyright Page; Dedication; Contents; Acknowledgments; Preface -- About the Author; Definitions and Nomenclature; Figure Listing; Table listing; Chapter 1 -- Introduction; 1.1 -- Introduction -- Facility Integrity Management; 1.2 -- Changing Industrial Landscape; 1.3 -- The Role of Facility Integrity; 1.3.1 -- Ensure the Availability of all Facilities; 1.3.2 -- Safeguard the Integrity of all Facilities; 1.3.2.1 -- The Piper Alpha Disaster; 1.3.2.2 -- The Flixborough Disaster; 1.3.2.3 -- The Effect on the Oil, Gas, and Petrochemical Industries. | |
| 505 | 8 | |a 1.4 -- Facility Integrity Management Systems1.4.1 -- Does This Look Familiar ...?; 1.4.2 -- Facility Integrity "Excellence"?; 1.4.3 -- Planning for Facility Integrity Management; 1.5 -- Introduction to Facility Integrity Excellence Model; 1.5.1 -- Holistic Viewpoint; 1.5.2 -- Risk-Centered Culture, the Heart of Facility Integrity Management; 1.5.3 -- Facility Integrity Excellence Model Representation; 1.5.4 -- The Three Essential Elements of Facility Integrity Management; 1.5.5 -- "What Gets Measured Gets Done"; 1.6 -- Design Considerations for This Book; 1.7 -- Chapter-by-Chapter Synopsis. | |
| 505 | 8 | |a Chapter 2 -- Facility Integrity Excellence Model2.1 -- Development of the Facility Integrity Excellence Model; 2.2 -- Process Modeling; 2.3 -- The Shewhart Cycle; 2.3.1 -- PLAN; 2.3.2 -- DO; 2.3.3 -- CHECK; 2.3.4 -- ACT; 2.4 -- Best Practices; 2.5 -- Common Language; 2.6 -- The Importance of Integrity Management; 2.6.1 -- Case Study -- ConocoPhillips, Humber Refinery; 2.6.1.1 -- Root Cause; 2.6.1.2 -- The Barriers that Broke Down; Prevention; Detection; Control; Mitigation; 2.6.1.3 -- Outcome of the HSE Inquiry; 2.7 -- The Road to Facility Integrity Excellence. | |
| 505 | 8 | |a 2.8 -- Facility Integrity Excellence Model Workflow2.8.1 -- FIEM Key Systems; Chapter 3 -- Risk-Centered Culture; 3.1 -- Introduction; 3.2 -- Risk; 3.2.1 -- Risk Analysis; 3.2.2 -- Risk Management; 3.3 -- Case Study -- The Silo Company; 3.4 -- Moving Towards an Integrated Approach; 3.5 -- More on Risk-centered Culture; 3.6 -- Changing an Organization's Culture; Chapter 4 -- Facility Integrity and Reliability; 4.1 -- Introduction; 4.2 -- The Facility Integrity and Reliability Function; 4.2.1 -- Failure of Equipment and Systems; 4.2.2 -- The Bathtub Curve. | |
| 505 | 8 | |a 4.3 -- Reactive Approach to Facility Integrity Management4.4 -- Moving from a Reactive to a Proactive Mindset; 4.5 -- Risk-based Methods; 4.6 -- Reliability; 4.6.1 -- Reliability Engineering; 4.7 -- Inspection; 4.7.1 -- Management of Integrity Data; 4.7.2 -- Risk-Based Inspection; 4.7.2.1 -- RBI Software System; 4.7.2.2 -- RBI Expert Review; 4.7.2.3 -- RBI Workflow; Likelihood of Failure; Consequence of Failure; Risk Assessment and Risk Ranking; Inspection Planning; Review of Inspection Results; 4.8 -- Relative Equipment Criticality; 4.8.1 -- Business Impact; 4.8.2 -- Probability or Likelihood of Failure. | |
| 505 | 8 | |a 4.8.3 -- Criticality Assessment. | |
| 506 | |a Plný text je dostupný pouze z IP adres počítačů Univerzity Tomáše Bati ve Zlíně nebo vzdáleným přístupem pro zaměstnance a studenty | ||
| 590 | |a Knovel |b Knovel (All titles) | ||
| 650 | 0 | |a Petroleum industry and trade |x Management. | |
| 650 | 0 | |a Facility management. | |
| 655 | 7 | |a elektronické knihy |7 fd186907 |2 czenas | |
| 655 | 9 | |a electronic books |2 eczenas | |
| 776 | 0 | 8 | |i Print version: |a Deighton, Michael Guy. |t Facility integrity management : effective principles and practices for the oil, gas and petrochemical industries. |d Amsterdam, [Netherlands] : Gulf Professional Publishing, ©2016 |h 236 pages |z 9780128017647 |
| 856 | 4 | 0 | |u https://proxy.k.utb.cz/login?url=https://app.knovel.com/hotlink/toc/id:kpFIMEPPO8/facility-integrity-management?kpromoter=marc |y Full text |