CPM scheduling for construction : best practices and guidelines

This volume compiles the work coordinated by the Scheduling Excellence Initiative Committee (SEI) to improve standardization and provide best practice guidelines for scheduling processes in the construction industry. It serves as a guide for all schedulers and planners from entry level to senior sch...

Full description

Saved in:
Bibliographic Details
Format: eBook
Language: English
Published: Newtown Square, Pennsylvania : Project Management Institute, Inc., [2014]
Subjects:
ISBN: 9781680156737
168015673X
9781628250732
1628250739
1628250372
9781628250374
Physical Description: 1 online resource (ix, 303 pages) : illustrations

Cover

Table of contents

LEADER 02780cam a2200433 i 4500
001 kn-ocn919090742
003 OCoLC
005 20240717213016.0
006 m o d
007 cr cn|||||||||
008 150824s2014 paua ob 001 0 eng d
040 |a KNOVL  |b eng  |e rda  |e pn  |c KNOVL  |d ZCU  |d YDXCP  |d COO  |d K6U  |d UAB  |d N$T  |d REB  |d OCLCQ  |d CEF  |d RRP  |d OCLCQ  |d AGLDB  |d DKU  |d WYU  |d S9I  |d C6I  |d MERER  |d OCLCQ  |d AU@  |d OCLCQ  |d OCLCO  |d OCLCQ  |d UPM  |d OCLCQ  |d OCLCO  |d OCLCL 
020 |a 9781680156737  |q (electronic bk.) 
020 |a 168015673X  |q (electronic bk.) 
020 |a 9781628250732  |q (electronic bk.) 
020 |a 1628250739  |q (electronic bk.) 
020 |z 1628250372 
020 |z 9781628250374 
035 |a (OCoLC)919090742 
245 0 0 |a CPM scheduling for construction :  |b best practices and guidelines /  |c edited by Christopher Carson, PMP, PSP, DRMP, Peter Oakander, Craig Relyea. 
264 1 |a Newtown Square, Pennsylvania :  |b Project Management Institute, Inc.,  |c [2014] 
264 4 |c ©2014 
300 |a 1 online resource (ix, 303 pages) :  |b illustrations 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
504 |a Includes bibliographical references (pages 267-268) and index. 
505 0 |a Introduction -- Scheduling Excellence Initiative Committee -- Organizational structure of the volume -- Pre-project planning phase -- Schedule Design -- Schedule Development -- Schedule Maintenance -- Schedule Maintenance -- Appendix. 
506 |a Plný text je dostupný pouze z IP adres počítačů Univerzity Tomáše Bati ve Zlíně nebo vzdáleným přístupem pro zaměstnance a studenty 
520 |a This volume compiles the work coordinated by the Scheduling Excellence Initiative Committee (SEI) to improve standardization and provide best practice guidelines for scheduling processes in the construction industry. It serves as a guide for all schedulers and planners from entry level to senior schedulers, as well as non-schedulers in management roles. The book itself is laid out in a way that follows the phases of building a project schedule: from project planning to project definition and schedule design, to development, maintenance, and usage of the schedule. 
590 |a Knovel  |b Knovel (All titles) 
650 0 |a Building  |x Superintendence. 
650 0 |a Production scheduling. 
650 0 |a Construction industry  |x Management. 
650 0 |a Critical path analysis. 
655 7 |a elektronické knihy  |7 fd186907  |2 czenas 
655 9 |a electronic books  |2 eczenas 
776 0 8 |i Print version:  |t CPM scheduling for construction  |z 1628250372  |w (OCoLC)892879405 
856 4 0 |u https://proxy.k.utb.cz/login?url=https://app.knovel.com/hotlink/toc/id:kpCPMSCBP1/cpm-scheduling-for?kpromoter=marc  |y Full text